Basic Information
Threat: Climate change
Threat Code: CLICHN
Threat Map
Loading...
Legend

Threat Background

MSP Threat/Stressor Background

Goals and Objectives

Goal: The climate change management goal for the MSPA is to maintain and enhance the long-term ecological integrity, resilience and viability of ecosystems, MSP species, and vegetation communities on Conserved Lands and to facilitate range shifts in species and vegetation communities as necessary for long term persistence in the region.

regional NFO 2017, 2018, 2019, 2020, 2021
MON-DEV-MODL CLICHN-1

Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11

In 2017, begin developing habitat suitability models for plant and animals species and vegetation communities under current and future climate change scenarios. Extend the modeling to consider the influence of other types of threats, such as changing fire regimes, land use and invasive species. Evaluate potential future conditions across the MSPA to identify where species and vegetation communities may be expected to persist, where they may shift in response to changing environmental conditions, and where threats may be greatest. Identify climate refugia and areas where climate change impacts may be the greatest. Obtain sea level modeling models and maps to incorporate into coastal climate change evaluations. The results of these modeling efforts will be considered in developing species and vegetation monitoring and management plans.

Action Statement Action status Projects
DEV-1 Submit project metadata, modeling data, model predictions and reports to MSP Web Portal In progress
Criteria Deadline year
Complete climate change models for =10 MSP species by 2021 2021
Threat Name Threat Code
Climate changeCLICHN
regional and/or local NFO 2018, 2019
MON-IMP-WSTA CLICHN-2

Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11

Beginning in 2018, design and start assembling a network of automated remote sensing weather stations and soil moisture/temperature sensors on Conserved Lands across the MSPA. Prioritize establishing weather and soil monitoring stations at permanent long-term vegetation monitoring plots.

Action Statement Action status Projects
IMP-1 Establish a working group of land owners, land managers, wildlife agencies, scientists and other stakeholders to design and integate existing and planned weather stations into a monitoring network across the MSPA. On hold
IMP-2 Submit project metadata and remotes sensing weather station and soil probe data to the MSP web portal. On hold
Criteria Deadline year
Weather and Soil Station Network designed and =5 new stations established 2021
Threat Name Threat Code
Climate changeCLICHN

Species objectives associated with this threat

regional NFO 2018 SO
MGT-PRP-MGTPL ACAILI-6

Management units: 3, 4, 5, 6

In 2018, begin preparing a section for San Diego thornmint the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the San Diego thornmint section in the MSP Rare Plant Management Plan. waiting for precedent action
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to San Diego thornmint occurrences. waiting for precedent action
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. waiting for precedent action
PRP-4 Develop an implementation plan for San Diego thornmint that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. waiting for precedent action
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2019 Completed Section for San Diego Thornmint in the MSP Rare Plant Management Plan. 2021
Code Obj. code Statement
ACAILI-1 MGT-IMP-FMGT Starting in 2017, reduce the potential impact of fire for at risk large populations of San Diego thornmint (see occurrence table) by reducing fuel loads of invasive annuals
ACAILI-2 MON-IMP-IMG Beginning in 2017, annually inspect conserved populations of San Diego thornmint (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs.
ACAILI-3 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the IMG monitoring at San Diego thornmint occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
ACAILI-4 MGT-DEV-BMP In 2017, continue refining BMPs developed for San Diego thornmint (CBI 2014) by incorporating results of management experiments to control invasive species that threaten populations (e.g., Brachypodium removal studies at Mission Trails and South Crest) and based on research studies (e.g., seed bulking guidelines, seed transfer zones).
ACAILI-5 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for San Diego thornmint occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
ACAILI-7 MGT-IMP-MGTPL In 2019, begin implementing highest priority management actions identified for San Diego thornmint in the MSP Rare Plant Management Plan.
ACAILI-8 MON-IMP-MGTPL In 2019, begin monitoring the effectiveness of implementation of the highest priority management actions identified in the San Diego thornmint section of the MSP Rare Plant Management Plan.
ACAILI-9 MGT-PRP-SBPL In 2018, begin preparing a section for San Diego thornmint in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2016-2017 genetic study to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing sources of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Regional and/or Local NFO 2019, 2020, 2021 SO
MGT-IMP-MGTPL ACAILI-7

Management units: 3, 4, 5, 6

In 2019, begin implementing highest priority management actions identified for San Diego thornmint in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2023, =2 High Priority Management Actions Implemented for San Diego Thornmint from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
ACAILI-6 MGT-PRP-MGTPL In 2018, begin preparing a section for San Diego thornmint the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
ACAILI-8 MON-IMP-MGTPL In 2019, begin monitoring the effectiveness of implementation of the highest priority management actions identified in the San Diego thornmint section of the MSP Rare Plant Management Plan.
ACAILI-9 MGT-PRP-SBPL In 2018, begin preparing a section for San Diego thornmint in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2016-2017 genetic study to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing sources of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Regional and/or Local NFO 2019, 2020, 2021 SO
MON-IMP-MGTPL ACAILI-8

Management units: 3, 4, 5, 6

In 2019, begin monitoring the effectiveness of implementation of the highest priority management actions identified in the San Diego thornmint section of the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
ACAILI-6 MGT-PRP-MGTPL In 2018, begin preparing a section for San Diego thornmint the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
ACAILI-7 MGT-IMP-MGTPL In 2019, begin implementing highest priority management actions identified for San Diego thornmint in the MSP Rare Plant Management Plan.
Regional NFO 2018 SO
MGT-PRP-SBPL ACAILI-9

Management units: 3, 4, 5, 6

In 2018, begin preparing a section for San Diego thornmint in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2016-2017 genetic study to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing sources of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the San Diego thornmint section of the MSP Seed Collection, Banking and Bulking Plan. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-2 Prepare a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-3 The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-6 Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
Criteria Deadline year
By 2019, Completed Section for San Diego thornmint in the MSP Seed Collection Banking and Bulking Plan 2021
Code Obj. code Statement
ACAILI-5 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for San Diego thornmint occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
ACAILI-6 MGT-PRP-MGTPL In 2018, begin preparing a section for San Diego thornmint the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
Regional and/or Local NFO 2019, 2020, 2021 SO
MGT-IMP-SBPL ACAILI-10

Management units: 3, 4, 5, 6

In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for San Diego thornmint to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. waiting for precedent action California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
Criteria Deadline year
By 2023, =2 Highest Priority Actions Implemented for San Diego thornmint from the MSP Seed Banking and Bulking Plan 2021
Code Obj. code Statement
ACAILI-5 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for San Diego thornmint occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
ACAILI-9 MGT-PRP-SBPL In 2018, begin preparing a section for San Diego thornmint in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2016-2017 genetic study to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing sources of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Regional NFO 2017 SO
MON-RES-SPEC ACAILI-11

Management units: 3, 4, 5, 6

In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for San Diego thornmint and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.

Action Statement Action status Projects
RES-1 Test soils at potential expansion sites and compare to occupied reference sites to determine site suitability based on soils. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-2 Prepare habitat suitability models under current environmental conditions and for different scenarios of climate change to delineate potential future habitat. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-3 Collect covariate data on vegetation composition and cover (alliance and association-level mapping), soils, invasive plants and other threats for selected populations. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-4 Prioritize locations for conservation, management, and future surveys based on predicted distributions and environmental correlates. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-5 Submit project metadata, monitoring data and report to MSP web portal. In progress Enhancing the Resilience of Edaphic Endemic Plants
Criteria Deadline year
Refined Models and Prioritized Future Survey Locations for San Diego Thornmint by 2018 2021
Code Obj. code Statement
ACAILI-2 MON-IMP-IMG Beginning in 2017, annually inspect conserved populations of San Diego thornmint (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs.
ACAILI-5 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for San Diego thornmint occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
ACAILI-6 MGT-PRP-MGTPL In 2018, begin preparing a section for San Diego thornmint the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence

Regional NFO 2017 SO
MGT-PRP-SBPL ACMPRO-4

Management units: 1, 7

In 2017, begin preparing a section for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009, KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan. Available for implementation
PRP-2 Prepare a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. Available for implementation
PRP-3 The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. Available for implementation
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). Available for implementation
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. Available for implementation
PRP-6 Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to the MSP Web Portal. Available for implementation
Criteria Deadline year
By 2018, Completed Nuttall's Acmispon Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
ACMPRO-1 MON-IMP-IMG From 2017-2012, inspect extant Nuttall's acmispon occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
ACMPRO-3 MGT-IMP-IEX From 2017 through 2019, enhance and expand the 4 Nuttall's acmispon occurrences at Mariner's Point, South Shores, South Carlsbad State Beach and Cardiff State Beaches (see occurrence table) and establish a new occurrence at Stony Point in Mission Bay. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
ACMPRO-5 MGT-IMP-SBPL In 2018, begin implementing the Nuttall's acmispon section in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
ACMPRO-6 MGT-PRP-MGTPL In 2017, begin preparing a section for Nuttall's acmispon in the MSP Rare Plant Management Plan that prioritizes management actions to maintain the 5 large occurrences and to enhance at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.
Regional and/or Local NFO 2018, 2019, 2020, 2021 SO
MGT-IMP-SBPL ACMPRO-5

Management units: 1, 7

In 2018, begin implementing the Nuttall's acmispon section in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. Available for implementation
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. Available for implementation
Criteria Deadline year
By 2021, =1 Highest Priority Action Implemented for Nuttall's Acmispon from the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
ACMPRO-4 MGT-PRP-SBPL In 2017, begin preparing a section for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009, KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
regional NFO 2017 SO
MGT-PRP-MGTPL ACMPRO-6

Management units: 1, 7

In 2017, begin preparing a section for Nuttall's acmispon in the MSP Rare Plant Management Plan that prioritizes management actions to maintain the 5 large occurrences and to enhance at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for Nuttall's acmispon in the MSP Rare Plant Management Plan. available for implementation
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to Nuttall's acmispon occurrences. available for implementation
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. available for implementation
PRP-4 Develop an implementation plan for Nuttall's acmispon that prioritizes management actions for the nex 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. available for implementation
PRP-5 Submit project metadata, project datasets, and the MSP Rare Plant Management Plan to the MSP Web Portal. available for implementation
Criteria Deadline year
By 2018, Completed Nuttall's Acmispon Section in the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
ACMPRO-1 MON-IMP-IMG From 2017-2012, inspect extant Nuttall's acmispon occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
ACMPRO-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Nuttall's acmispon occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
ACMPRO-3 MGT-IMP-IEX From 2017 through 2019, enhance and expand the 4 Nuttall's acmispon occurrences at Mariner's Point, South Shores, South Carlsbad State Beach and Cardiff State Beaches (see occurrence table) and establish a new occurrence at Stony Point in Mission Bay. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
ACMPRO-4 MGT-PRP-SBPL In 2017, begin preparing a section for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009, KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
ACMPRO-5 MGT-IMP-SBPL In 2018, begin implementing the Nuttall's acmispon section in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
ACMPRO-7 MGT-IMP-MGTPL In 2018, begin implementing highest priority management actions identified for Nuttall's acmispon in the MSP Rare Plant Management Plan.
ACMPRO-8 MON-IMP-MGTPL In 2018, monitor effectiveness of implementing highest priority management actions identified for Nuttall's acmispon in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2018, 2019, 2020, 2021 SO
MGT-IMP-MGTPL ACMPRO-7

Management units: 1, 7

In 2018, begin implementing highest priority management actions identified for Nuttall's acmispon in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2021, =1 High Priority Management Action Implemented for Nuttall's Acmispon from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
ACMPRO-6 MGT-PRP-MGTPL In 2017, begin preparing a section for Nuttall's acmispon in the MSP Rare Plant Management Plan that prioritizes management actions to maintain the 5 large occurrences and to enhance at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.
ACMPRO-8 MON-IMP-MGTPL In 2018, monitor effectiveness of implementing highest priority management actions identified for Nuttall's acmispon in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2018, 2019, 2020, 2021 SO
MON-IMP-MGTPL ACMPRO-8

Management units: 1, 7

In 2018, monitor effectiveness of implementing highest priority management actions identified for Nuttall's acmispon in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
ACMPRO-6 MGT-PRP-MGTPL In 2017, begin preparing a section for Nuttall's acmispon in the MSP Rare Plant Management Plan that prioritizes management actions to maintain the 5 large occurrences and to enhance at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.
ACMPRO-7 MGT-IMP-MGTPL In 2018, begin implementing highest priority management actions identified for Nuttall's acmispon in the MSP Rare Plant Management Plan.

local NFO 2017, 2018, 2019, 2020, 2021 SO
MON-IMP-IMG ANACAL-1

Management units: 3, 4, 5, 6, 8, 9, 10, 11

Annually inspect known areas occupied by arroyo toad to identify and reduce threats that can be managed at the local scale including road crossings, illegal encroachment, off-road vehicle use, non-native plants, trash dumping, grazing by livestock, and incompatible human recreation. Where possible, restrict access to arroyo toad upland and breeding habitats to help prevent disturbance to all arroyo toad life history stages (eggs, larvae, metamorphs and adults). Activities should be restricted in upland habitat year-round and in breeding habitat during the core of the breeding season (March to July).

Action Statement Action status Projects
IMP-1 Using a regional "IMG" monitoring protocol, annually inspect significant Arroyo toad occurrences to assess status and quantify potential threats to determine management needs. AID_20161229_1831_100 Available for implementation
IMP-2 Roads should be examined for high risk areas for arroyo toad crossing and use. Only slow moving vehicles (<5mph) with an occupant experienced in arroyo toad identification should be allowed on high risk roads after sunset (Zimmitti and Mahrdt 1999). Available for implementation
IMP-3 An education program should be implemented that promotes the value of the arroyo toad and informs the public of restrictions and the importance of not disturbing the wildlife. Available for implementation
IMP-4 Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. Available for implementation
IMP-5 Submit monitoring and management recommendations to the MSP web portal Available for implementation
Criteria Deadline year
Annual IMG monitoring of Arroyo toad completed 2021
local NFO 2017, 2018, 2019, 2020, 2021 SO
MGT-IMP-IMG ANACAL-2

Management units: 3, 4, 5, 6, 8, 9, 10, 11

Beginning in 2018, conduct routine management actions for arroyo toad identified through the IMG regional protocol monitoring, including protecting populations from detrimental human use (e.g. ORV, trampling, altered hydrology), removing invasive plants, and removing aquatic predators and exotic species (which compete and/or prey on arroyo toads, primarily young) within the known arroyo toad habitat.

Action Statement Action status Projects
IMP-1 Perform routine management activities such as protecting occurrences from human disturbance, controlling invasive plants, and removing invasive aquatic animals. available for implementation
IMP-2 Submit project metadata and management data to MSP web portal. available for implementation
Criteria Deadline year
Routine Management Completed as Needed Based Upon Monitoring Recommendations 2021
Code Obj. code Statement
ANACAL-1 MON-IMP-IMG Annually inspect known areas occupied by arroyo toad to identify and reduce threats that can be managed at the local scale including road crossings, illegal encroachment, off-road vehicle use, non-native plants, trash dumping, grazing by livestock, and incompatible human recreation. Where possible, restrict access to arroyo toad upland and breeding habitats to help prevent disturbance to all arroyo toad life history stages (eggs, larvae, metamorphs and adults). Activities should be restricted in upland habitat year-round and in breeding habitat during the core of the breeding season (March to July).
regional NFO 2020, 2021 SO
MON-SURV-SPEC ANACAL-4

Management units: 3, 4, 5, 6, 8, 9, 10, 11

In 2020 and 2021 (assuming adequate rainfall levels), conduct comprehensive arroyo toad surveys using USGS survey protocols throughout the MSPA on Conserved Lands in known occupied and potential habitat to determine current distribution and status of arroyo toad, collect data on threats and habitat covariates, and identify management needs.

Action Statement Action status Projects
SURV-1 Survey known occupied and potantial habitat on Conserved Lands across the MSPA to determine the distribution and abundance of arroyo toad on Conserved Lands. Available for implementation
SURV-2 Collect data on threats and identify management needs to support self-sustaining occurrences. Available for implementation
SURV-3 Continue to collect genetic samples from all arroyo toads captured. Available for implementation
SURV-4 Submit survey data and management recommendations to MSP web portal Available for implementation
Criteria Deadline year
Comprehensive surveys completed for Arroyo toad by 2021 2021
Code Obj. code Statement
ANACAL-1 MON-IMP-IMG Annually inspect known areas occupied by arroyo toad to identify and reduce threats that can be managed at the local scale including road crossings, illegal encroachment, off-road vehicle use, non-native plants, trash dumping, grazing by livestock, and incompatible human recreation. Where possible, restrict access to arroyo toad upland and breeding habitats to help prevent disturbance to all arroyo toad life history stages (eggs, larvae, metamorphs and adults). Activities should be restricted in upland habitat year-round and in breeding habitat during the core of the breeding season (March to July).
regional NFO 2017, 2018, 2019 SO
MGT-PRP-MGTPL ANACAL-5

Management units: 3, 4, 5, 6, 8, 9, 10, 11

In 2017, continue to convene with the working group of land managers, scientists, wildlife agencies, and local biologists knowledgeable in arroyo toad to review existing conditions of known occurrences on Conserved Lands, to prepare a plan for management of arroyo toad which considers each site, and to develop a regional monitoring strategy.

Action Statement Action status Projects
PRP-1 Convene working group meetings to review existing conditions of known occurrences. in progress
PRP-2 Use habitat models developed by USGS and results from survey and genetic analyses to identify suitable areas for long-term management. in progress
PRP-3 Conduct site visits as necessary to identify appropriate management actions. in progress
PRP-4 Develop an arroyo toad management plan. The plan should prioritize management actions for the next five years and detail tasks, lead entities, responsibilities, timelines, and budgets. in progress
PRP-5 Submit management plan to MSP web portal in progress
Criteria Deadline year
Arroyo toad management plan completed by 2018 2021
Code Obj. code Statement
ANACAL-1 MON-IMP-IMG Annually inspect known areas occupied by arroyo toad to identify and reduce threats that can be managed at the local scale including road crossings, illegal encroachment, off-road vehicle use, non-native plants, trash dumping, grazing by livestock, and incompatible human recreation. Where possible, restrict access to arroyo toad upland and breeding habitats to help prevent disturbance to all arroyo toad life history stages (eggs, larvae, metamorphs and adults). Activities should be restricted in upland habitat year-round and in breeding habitat during the core of the breeding season (March to July).
ANACAL-2 MGT-IMP-IMG Beginning in 2018, conduct routine management actions for arroyo toad identified through the IMG regional protocol monitoring, including protecting populations from detrimental human use (e.g. ORV, trampling, altered hydrology), removing invasive plants, and removing aquatic predators and exotic species (which compete and/or prey on arroyo toads, primarily young) within the known arroyo toad habitat.
ANACAL-3 MON-RES-GEN From 2017 to 2021, continue genetic studies of the arroyo toad in San Diego Co. (using genetic material collected during past and present regional surveys) to evaluate the degree of genetic variation within and between populations and to possibly identify genetic bottlenecks or barriers; this information will also be used to determine source populations to use in re-establishing arroyo toads in previously occupied areas.
ANACAL-4 MON-SURV-SPEC In 2020 and 2021 (assuming adequate rainfall levels), conduct comprehensive arroyo toad surveys using USGS survey protocols throughout the MSPA on Conserved Lands in known occupied and potential habitat to determine current distribution and status of arroyo toad, collect data on threats and habitat covariates, and identify management needs.
regional NFO 2018, 2019, 2020, 2021 SO
MGT-IMP-MGTPL ANACAL-6

Management units: 3, 4, 5, 6, 8, 9, 10, 11

Beginning in 2018, implement high priority actions identified in the Arroyo Toad Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management actions and report to MSP web portal waiting for precedent action
Criteria Deadline year
High priority management actions implemented for Arroyo toad 2021
Code Obj. code Statement
ANACAL-1 MON-IMP-IMG Annually inspect known areas occupied by arroyo toad to identify and reduce threats that can be managed at the local scale including road crossings, illegal encroachment, off-road vehicle use, non-native plants, trash dumping, grazing by livestock, and incompatible human recreation. Where possible, restrict access to arroyo toad upland and breeding habitats to help prevent disturbance to all arroyo toad life history stages (eggs, larvae, metamorphs and adults). Activities should be restricted in upland habitat year-round and in breeding habitat during the core of the breeding season (March to July).
ANACAL-2 MGT-IMP-IMG Beginning in 2018, conduct routine management actions for arroyo toad identified through the IMG regional protocol monitoring, including protecting populations from detrimental human use (e.g. ORV, trampling, altered hydrology), removing invasive plants, and removing aquatic predators and exotic species (which compete and/or prey on arroyo toads, primarily young) within the known arroyo toad habitat.
ANACAL-3 MON-RES-GEN From 2017 to 2021, continue genetic studies of the arroyo toad in San Diego Co. (using genetic material collected during past and present regional surveys) to evaluate the degree of genetic variation within and between populations and to possibly identify genetic bottlenecks or barriers; this information will also be used to determine source populations to use in re-establishing arroyo toads in previously occupied areas.
ANACAL-4 MON-SURV-SPEC In 2020 and 2021 (assuming adequate rainfall levels), conduct comprehensive arroyo toad surveys using USGS survey protocols throughout the MSPA on Conserved Lands in known occupied and potential habitat to determine current distribution and status of arroyo toad, collect data on threats and habitat covariates, and identify management needs.
ANACAL-5 MGT-PRP-MGTPL In 2017, continue to convene with the working group of land managers, scientists, wildlife agencies, and local biologists knowledgeable in arroyo toad to review existing conditions of known occurrences on Conserved Lands, to prepare a plan for management of arroyo toad which considers each site, and to develop a regional monitoring strategy.
regional NFO 2018, 2019, 2020, 2021 SO
MON-IMP-MGTPL ANACAL-7

Management units: 3, 4, 5, 6, 8, 9, 10, 11

Beginning in 2018, monitor the effectiveness of management actions implemented for the arroyo toad.

Action Statement Action status Projects
IMP-1 Submit project metadata, monitoring data and reports to MSP web portal waiting for precedent action
Criteria Deadline year
Effectiveness of implementing high priority arroyo toad management actions determined 2021

regional and/or local NFO 2017, 2019, 2021 SL
MON-IMP-IMG APHBLI-1

Management units: 1, 7

Beginning in 2017, inspect extant aphanisma occurrence(s) on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years, unless an occurrence is small (<100 individuals) or faces a high degree of threat, in which case monitor annually.

Action Statement Action status Projects
IMP-1 Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. in progress
IMP-2 Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. in progress
Criteria Deadline year
Surveys Completed Every 2 Years with Management Recommendations 2021
Threat Name Threat Code
Climate changeCLICHN
Human uses of the PreservesHUMUSE
Invasive plantsINVPLA
Code Obj. code Statement
APHBLI-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the "IMG" monitoring at aphamisma occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
APHBLI-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at aphamisma occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
APHBLI-5 MGT-PRP-MGTPL In 2021, begin preparing a section for aphanisma in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences and/or establishment of new occurrences in suitable habitat as needed to achieve at least 3 occurrences with self-sustaining populations on Conserved Lands (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
local NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-IMG APHBLI-2

Management units: 1, 7

Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at aphamisma occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.

Action Statement Action status Projects
IMP-1 Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species less than or equal to 20% absolute cover. available for implementation
IMP-2 Submit project metadata and management data to the MSP Web Portal. available for implementation
Criteria Deadline year
Routine Management Completed as Needed Based Upon Monitoring Recommendations 2021
Threat Name Threat Code
Climate changeCLICHN
Human uses of the PreservesHUMUSE
Invasive plantsINVPLA
Code Obj. code Statement
APHBLI-1 MON-IMP-IMG Beginning in 2017, inspect extant aphanisma occurrence(s) on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years, unless an occurrence is small (<100 individuals) or faces a high degree of threat, in which case monitor annually.
APHBLI-5 MGT-PRP-MGTPL In 2021, begin preparing a section for aphanisma in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences and/or establishment of new occurrences in suitable habitat as needed to achieve at least 3 occurrences with self-sustaining populations on Conserved Lands (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
Regional NFO 2021 SL
MGT-PRP-SBPL APHBLI-4

Management units: 1, 7

In 2021, begin preparing a section for aphanisma in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009; KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the aphanisma section of the MSP Seed Collection, Banking and Bulking Plan. some occurrences are in progress
PRP-2 Write a seed collection plan section that includes collecting seeds over multiple years and several times within a season, accumulating seeds across populations, and sampling among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from occurrences with <1,000 plants and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress
PRP-3 The seed collection plan section should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. some occurrences are in progress
PRP-6 Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2022, Completed Aphanisma Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
APHBLI-1 MON-IMP-IMG Beginning in 2017, inspect extant aphanisma occurrence(s) on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years, unless an occurrence is small (<100 individuals) or faces a high degree of threat, in which case monitor annually.
APHBLI-3 MON-SURV-SPEC In 2019, survey historic aphanisma locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
APHBLI-3 MON-SURV-SPEC In 2019, survey historic aphanisma locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
APHBLI-5 MGT-PRP-MGTPL In 2021, begin preparing a section for aphanisma in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences and/or establishment of new occurrences in suitable habitat as needed to achieve at least 3 occurrences with self-sustaining populations on Conserved Lands (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
regional and/or local NFO 2021 SL
MGT-PRP-MGTPL APHBLI-5

Management units: 1, 7

In 2021, begin preparing a section for aphanisma in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences and/or establishment of new occurrences in suitable habitat as needed to achieve at least 3 occurrences with self-sustaining populations on Conserved Lands (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the aphanisma section of the MSP Rare Plant Management Plan. some occurrences are in progress
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to aphanisma populations. some occurrences are in progress
PRP-3 Prioritize occurrences for management based upon "IMG" monitoring data and baseline survey assessments of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. available for implementation
PRP-3 Prioritize occurrences for management based upon "IMG" monitoring data and baseline survey assessments of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. some occurrences are in progress
PRP-4 Develop an implementation plan for aphanisma that prioritizes management actions for the next 5 year and details tasks, lead entities, responsibilities, and timelines, budgets. some occurrences are in progress
PRP-5 Submit project metadata, project datasets, and MSP Rare Plant Management Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2022, Completed Aphanisma Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
APHBLI-1 MON-IMP-IMG Beginning in 2017, inspect extant aphanisma occurrence(s) on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years, unless an occurrence is small (<100 individuals) or faces a high degree of threat, in which case monitor annually.
APHBLI-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the "IMG" monitoring at aphamisma occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
APHBLI-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at aphamisma occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
APHBLI-3 MON-SURV-SPEC In 2019, survey historic aphanisma locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
APHBLI-3 MON-SURV-SPEC In 2019, survey historic aphanisma locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
APHBLI-4 MGT-PRP-SBPL In 2021, begin preparing a section for aphanisma in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009; KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

regional NFO 2017, 2018, 2019, 2020, 2021 SL
MON-RES-SPEC ATHCUN-1

Management units: 3, 4, 5, 6, 9

Continue the research study of breeding burrowing owls, foraging, threats, artifiical and natural burrows, movements, and habitat assessments to inform management at existing occupied and future potential nodes. Include translocated owls in the study to determine effectiveness of translocation and to gather information to inform continued management at new nodes.

Action Statement Action status Projects
RES-1 Submit project metadata, survey data, and report with management recommendations to the MSP web portal. In progress
Criteria Deadline year
Burrowing Owl Surveys and Reports Completed by 2021. 2021
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SL
MON-IMP-IMG ATHCUN-3

Management units: 3, 4, 5, 6, 9

Annually inspect artificial and natural burrows and occupied habitat to determine management needs using a regional IMG protocol. The monitoring should include considerations for retrofitting existing artificial burrows with the most current design to maximize fledgling success, removal/closing of burrows at poorly performing sites, and addition of burrows to maximize success.

Action Statement Action status Projects
IMP-1 Conduct regional IMG monitoring protocol survey locations and habitat, assess status, and quantify potential threats. available for implementation
IMP-2 Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. available for implementation
IMP-3 Submit monitoring and management data to the regional MSP web portal. available for implementation
Criteria Deadline year
Surveys Completed Annually with management recommendations 2021
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-IMG ATHCUN-4

Management units: 3, 4, 5, 6, 9

Conduct management actions identified through the IMG regional protocol monitoring, including protecting populations from disturbance, removing invasive plants, cleaning, repairing, and fortifying burrows within the known occupied and suitable habitat, retrofitting existing artificial burrows with the most current design to maximize fledgling success, removal/closing of burrows at poorly performing sites, and addition of burrows to maximize success.

Action Statement Action status Projects
IMP-1 Perform management activities such as protecting populations from disturbance, removing invasive plants, cleaning, repairing, and fortifying burrows, retrofitting existing artificial burrows with the most current design to maximize fledgling success, removal/closing of burrows at poorly performing sites, and addition of burrows to maximize success.. some occurrences are in progress
IMP-2 Submit project metadata and management data to MSP web portal. some occurrences are in progress
Criteria Deadline year
Management Completed as Needed Based Upon Monitoring Recommendations 2021
regional NFO 2017 SL
MGT-PRP-MGTPL ATHCUN-5

Management units: 3, 4, 5, 6, 9

In 2017, finalize the Burrowing Owl Conservation and Management Plan that includes results from the research study and habitat assessments and recommendations for the establishment of at least two nodes and enhancement of existing occurrences to ensure persistence on Conserved Lands and establishment of a captive breeding population as a source for burrowing owls.

Action Statement Action status Projects
PRP-1 Consult with the Burrowing Owl Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to gather input into prioritized management actions. completed
PRP-2 Submit project metadata and Burrowing Owl Conservation and Management Plant to the MSP Web Portal.
Criteria Deadline year
Burrowing Owl Management Plan Completed in 2017 2021
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-MGTPL ATHCUN-6

Management units: 3, 4, 5, 6, 9

Beginning in 2017, implement highest priority management actions from the Burrowing Owl Conservation and Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP Web Portal. available for implementation
Criteria Deadline year
By 2021, =1 High Priority Management Action Implemented from the Burrowing Owl Conservation and Management Plan 2021
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SL
MON-IMP-MGTPL ATHCUN-7

Management units: 3, 4, 5, 6, 9

Beginning in 2017, monitor the effectiveness of management actions implemented for western burrowing owl on Conserved Lands.

Action Statement Action status Projects
IMP-1 Submit monitoring data and reports to MSP web portal waiting for precedent action
Criteria Deadline year
Monitoring Completed and Data and Report Submitted within one year of management actions 2021

Regional NFO 2018 SO
MGT-PRP-SBPL BACVAN-4

Management units: 3, 4, 6

In 2018, begin preparing a section for Encinitas baccharis in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009; KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Encinitas baccharis section in the MSP Species Seed Collection, Banking and Bulking Plan. some occurrences are in progress Wed Demo
PRP-2 Design the seed collection plan to incorporate genetic study results and with recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress
PRP-3 The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. some occurrences are in progress
PRP-6 Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2019, Completed Encinitas Baccharis Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
BACVAN-3 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Encinitas baccharis occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
BACVAN-6 MGT-PRP-MGTPL Begin preparing a section for Encinitas baccharis in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
Regional and/or Local NFO 2019, 2020, 2021 SO
MGT-IMP-SBPL BACVAN-5

Management units: 1, 7

In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Encinitas baccharis to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. waiting for precedent action
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2021, =1 Highest Priority Action Implemented for Encinitas Baccharis from the MSP Seed Collection, Banking, and Bulking Plan 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
BACVAN-4 MGT-PRP-SBPL In 2018, begin preparing a section for Encinitas baccharis in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009; KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
BACVAN-7 MGT-IMP-MGTPL Beginning in 2019, implement highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.
regional NFO 2018 SO
MGT-PRP-MGTPL BACVAN-6

Management units: 4, 5, 8

Begin preparing a section for Encinitas baccharis in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Encinitas baccharis section of the MSP Rare Plant Management Plan. some occurrences are in progress
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to Encinitas baccharis occurrences. some occurrences are in progress
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. some occurrences are in progress
PRP-4 Develop an implementation plan for Encinitas Baccharis that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. some occurrences are in progress
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2019, Completed Encinitas Baccharis Section of the MSP Rare Plant Management Plan 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
BACVAN-1 MON-IMP-IMG Beginning in 2017, inspect Encinitas baccharis occurrences on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to record abundance and collect habitat and threat covariate data to determine management needs. After 2017, repeat monitoring every 2 years.
BACVAN-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Encinitas baccharis occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
BACVAN-3 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Encinitas baccharis occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
BACVAN-4 MGT-PRP-SBPL In 2018, begin preparing a section for Encinitas baccharis in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009; KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
BACVAN-5 MGT-IMP-SBPL In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Encinitas baccharis to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
BACVAN-7 MGT-IMP-MGTPL Beginning in 2019, implement highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.
BACVAN-8 MON-IMP-MGTPL Beginning in 2019, monitor effectiveness of implementation of highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.
BACVAN-9 MON-RES-SPEC Determine the population dynamics of Encinitas baccharis in response to natural and altered fire frequencies that may affect successional processes and population dynamics. The study should begin when the next fire burns an Encinitas baccharis occurrence and include subsequently burned occurrences to research post-fire recovery mechanisms (e.g., resprouter vs. obligate seeder) and circumstances in which post-fire management is necessary to facilitate robust post-fire recovery. Use results to identify postfire management actions for Encinitas baccharis to assist in recovery of burned populations.
Regional and/or Local NFO 2019, 2020, 2021 SO
MGT-IMP-MGTPL BACVAN-7

Management units: 1, 7

Beginning in 2019, implement highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2021, =1 High Priority Management Action Implemented for Encinitas Baccharis from the MSP Rare Plant Management Plan 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
BACVAN-5 MGT-IMP-SBPL In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Encinitas baccharis to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
BACVAN-6 MGT-PRP-MGTPL Begin preparing a section for Encinitas baccharis in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BACVAN-8 MON-IMP-MGTPL Beginning in 2019, monitor effectiveness of implementation of highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2019, 2020, 2021 SO
MON-IMP-MGTPL BACVAN-8

Management units: 1, 7

Beginning in 2019, monitor effectiveness of implementation of highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
BACVAN-6 MGT-PRP-MGTPL Begin preparing a section for Encinitas baccharis in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or expand occurrences on Conserved Lands based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations to maintain large occurrences and enhance at least 3 small occurrences (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BACVAN-7 MGT-IMP-MGTPL Beginning in 2019, implement highest priority management actions identified in the Encinitas baccharis section of the MSP Rare Plant Management Plan.

NFO 2017 SS
MON-RES-SPEC BROFIL-3

Management units: 6, 7, 8

In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for thread-leaved brodiaea and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.

Action Statement Action status Projects
RES-1 Test soils at potential expansion sites and compare to occupied reference sites to determine site suitability based on soils. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-2 Prepare habitat suitability models under current environmental conditions and for different scenarios of climate change to delineate potential future habitat. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-3 Collect covariate data on vegetation composition and cover (alliance and association-level mapping), soils, invasive plants and other threats for selected populations. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-4 Prioritize locations for conservation, management, and future surveys based on predicted distributions and environmental correlates. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-5 Submit project metadata, monitoring data and report to MSP web portal. In progress Enhancing the Resilience of Edaphic Endemic Plants
Criteria Deadline year
Refined Models and Prioritized Future Survey Locations for thread-leaved brodiaea by 2018 2021
Threat Name Threat Code
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
BROFIL-5 MGT-PRP-MGTPL In 2020, begin preparing a section for thread-leaved brodiaea in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
Regional NFO 2019 SS
MON-SURV-SPEC BROFIL-4

Management units: 6, 7, 8

In 2019, survey historic thread-leaved brodiaea locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.

Action Statement Action status Projects
SURV-1 At each extant occurrence, map the extent of the occurrence, collect data on abundance, map adjacent suitable habitat for potential occurrence expansion, collect covariate data on threats including estimates of cover of invasive non-native plants and trampling. On hold
SURV-2 Submit project metadata, occurrence status, habitat mapping and assessment, and report to the MSP Web Portal. On hold
Criteria Deadline year
Surveys and Report Completed by 2020 2021
Code Obj. code Statement
BROFIL-5 MGT-PRP-MGTPL In 2020, begin preparing a section for thread-leaved brodiaea in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
regional NFO 2020 SS
MGT-PRP-MGTPL BROFIL-5

Management units: 6, 7, 8

In 2020, begin preparing a section for thread-leaved brodiaea in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.

Action Statement Action status Projects
PRP-1 Prioritize extant occurrences for management based upon "IMG" monitoring data and baseline survey assessments of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. some occurrences are in progress
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to thread-leaved brodiaea occurrences. some occurrences are in progress
PRP-3 Identify and prioritize sites for re-establishment of historic occurrences or that appear suitable for establishment of new occurrences. Specify the highest priority sites for establishing occurrences on Conserved Lands. some occurrences are in progress
PRP-4 Develop an implementation plan for thread-leaved brodiaea that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. some occurrences are in progress
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2021, Completed Section for Thread-leaved brodiaea in the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
BROFIL-1 MON-IMP-IMG Beginning in 2017, inspect conserved populations of thread-leaved brodiaea in (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs. After 2017, repeat monitoring every 2 years.
BROFIL-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the IMG monitoring at thread-leaved brodiaea occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
BROFIL-3 MON-RES-SPEC In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for thread-leaved brodiaea and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
BROFIL-4 MON-SURV-SPEC In 2019, survey historic thread-leaved brodiaea locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
BROFIL-6 MGT-IMP-MGTPL Beginning in 2021, begin implementing highest priority management actions identified in the thread-leaved brodiaea section of the MSP Rare Plant Management Plan.
BROFIL-7 MON-IMP-MGTPL Monitor effectiveness of implementation of highest priority management actions identified in the thread-leaved brodiaea section in the MSP Rare Plant Management Plan.
BROFIL-8 MGT-PRP-SBPL In 2020, begin preparing a section for Thread-leaved brodiaea in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the genetic study to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seed sources for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
regional and/or local NFO 2021 SS
MGT-IMP-MGTPL BROFIL-6

Management units: 6, 7, 8

Beginning in 2021, begin implementing highest priority management actions identified in the thread-leaved brodiaea section of the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2025, =1 High priority Management Action Implemented for Thread-leaved Brodiaea from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
BROFIL-5 MGT-PRP-MGTPL In 2020, begin preparing a section for thread-leaved brodiaea in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BROFIL-7 MON-IMP-MGTPL Monitor effectiveness of implementation of highest priority management actions identified in the thread-leaved brodiaea section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2021 SS
MON-IMP-MGTPL BROFIL-7

Management units: 6, 7, 8

Monitor effectiveness of implementation of highest priority management actions identified in the thread-leaved brodiaea section in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
BROFIL-5 MGT-PRP-MGTPL In 2020, begin preparing a section for thread-leaved brodiaea in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BROFIL-6 MGT-IMP-MGTPL Beginning in 2021, begin implementing highest priority management actions identified in the thread-leaved brodiaea section of the MSP Rare Plant Management Plan.
Regional NFO 2020 SS
MGT-PRP-SBPL BROFIL-8

Management units: 6, 7, 8

In 2020, begin preparing a section for Thread-leaved brodiaea in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the genetic study to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seed sources for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Thread-leaved brodiaea MSP Seed Collection, Banking and Bulking Plan. some occurrences are in progress
PRP-2 Design a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress
PRP-3 The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. waiting for precedent action
Criteria Deadline year
By 2021, completed section for Thread-leaved brodiaea in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
BROFIL-1 MON-IMP-IMG Beginning in 2017, inspect conserved populations of thread-leaved brodiaea in (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs. After 2017, repeat monitoring every 2 years.
BROFIL-3 MON-RES-SPEC In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for thread-leaved brodiaea and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
BROFIL-4 MON-SURV-SPEC In 2019, survey historic thread-leaved brodiaea locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
BROFIL-5 MGT-PRP-MGTPL In 2020, begin preparing a section for thread-leaved brodiaea in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BROFIL-9 MGT-IMP-SBPL In 2021, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Thread-leaved brodiaea to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences

regional and/or local NFO 2017, 2018, 2019 SO
MGT-IMP-IEX BROORC-4

Management units: 3

Beginning in 2017, establish 2 new Orcutt's brodiaea occurrences at Proctor Valley and Cal Terraces/Dennery Canyon. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence

Action Statement Action status Projects
IMP-1 Conduct invasive plant control and distribute seed to establish new Orcutt's brodiaea occurrences. in progress
IMP-2 Implement seed augmentation using seed collected and bulked by San Diego Zoo's Institute for Conservation Research. in progress
IMP-3 Submit project metadata, management datasets and report to the MSP Web Portal. in progress
Criteria Deadline year
By 2020, 2 New Occurrences of Orcutt's Brodiaea Established and Report Submitted 2021
Code Obj. code Statement
BROORC-6 MGT-IMP-SBPL From 2017-2019, collect Orcutt's brodiaea seed for conservation banking and bulk seed for establishment of new occurrences at Cal Terraces/Dennery Canyon and Proctor Valley. In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
BROORC-8 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's brodiaea in the MSP Rare Plant Management Plan.
BROORC-9 MON-IMP-MGTPL In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's brodiaea section in the MSP Rare Plant Management Plan.
Regional NFO 2020 SO
MGT-PRP-SBPL BROORC-5

Management units: 2, 3, 4, 6, 8

In 2020, begin preparing an Orcutt's brodiaea section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's brodiaea section in the MSP Seed Collection, Banking and Bulking Plan. some occurrences are in progress
PRP-2 Design the seed collection plan to include recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress
PRP-3 The seed collection plan should have guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. some occurrences are in progress
PRP-6 Submit project metadata and the MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2021, Completed Orcutt's Brodiaea Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
BROORC-1 MON-IMP-IMG From 2017-2021, inspect Orcutt's brodiaea occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
BROORC-3 MON-SURV-SPEC In 2019, survey historic Orcutt's brodiaea locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
BROORC-4 MGT-IMP-IEX Beginning in 2017, establish 2 new Orcutt's brodiaea occurrences at Proctor Valley and Cal Terraces/Dennery Canyon. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
BROORC-6 MGT-IMP-SBPL From 2017-2019, collect Orcutt's brodiaea seed for conservation banking and bulk seed for establishment of new occurrences at Cal Terraces/Dennery Canyon and Proctor Valley. In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
BROORC-7 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's brodiaea section in the MSP Rare Plant Management Plan to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
Regional and/or Local NFO 2021 SO
MGT-IMP-SBPL BROORC-6

Management units: 2, 3, 4, 6, 8

From 2017-2019, collect Orcutt's brodiaea seed for conservation banking and bulk seed for establishment of new occurrences at Cal Terraces/Dennery Canyon and Proctor Valley. In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. some occurrences are in progress
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2025, =1 Highest Priority Action Implemented for Orcutt's brodiaea from the MSP Seed Banking and Bulking Plan 2021
Code Obj. code Statement
BROORC-4 MGT-IMP-IEX Beginning in 2017, establish 2 new Orcutt's brodiaea occurrences at Proctor Valley and Cal Terraces/Dennery Canyon. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
BROORC-5 MGT-PRP-SBPL In 2020, begin preparing an Orcutt's brodiaea section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
BROORC-8 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's brodiaea in the MSP Rare Plant Management Plan.
regional NFO 2020, 2021 SO
MGT-PRP-MGTPL BROORC-7

Management units: 2, 3, 4, 6, 8

In 2020, begin preparing an Orcutt's brodiaea section in the MSP Rare Plant Management Plan to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's brodiaea section in the MSP Rare Plant Management Plan. some occurrences are in progress
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to Orcutt's brodiaea occurrences. some occurrences are in progress
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence status, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. some occurrences are in progress
PRP-4 Develop an implementation plan for Orcutt's brodiaea that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. some occurrences are in progress
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2021, Completed Orcutt's Brodiaea Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
BROORC-1 MON-IMP-IMG From 2017-2021, inspect Orcutt's brodiaea occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
BROORC-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Orcutt's brodiaea occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
BROORC-3 MON-SURV-SPEC In 2019, survey historic Orcutt's brodiaea locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
BROORC-4 MGT-IMP-IEX Beginning in 2017, establish 2 new Orcutt's brodiaea occurrences at Proctor Valley and Cal Terraces/Dennery Canyon. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
BROORC-5 MGT-PRP-SBPL In 2020, begin preparing an Orcutt's brodiaea section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
BROORC-6 MGT-IMP-SBPL From 2017-2019, collect Orcutt's brodiaea seed for conservation banking and bulk seed for establishment of new occurrences at Cal Terraces/Dennery Canyon and Proctor Valley. In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
BROORC-8 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's brodiaea in the MSP Rare Plant Management Plan.
BROORC-9 MON-IMP-MGTPL In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's brodiaea section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2021 SO
MGT-IMP-MGTPL BROORC-8

Management units: 2, 3, 4, 6, 8

In 2021, begin implementing highest priority management actions identified for Orcutt's brodiaea in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2025, =1 High Priority Management Action Implemented for Orcutt's Brodiaea from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
BROORC-6 MGT-IMP-SBPL From 2017-2019, collect Orcutt's brodiaea seed for conservation banking and bulk seed for establishment of new occurrences at Cal Terraces/Dennery Canyon and Proctor Valley. In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
BROORC-7 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's brodiaea section in the MSP Rare Plant Management Plan to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BROORC-9 MON-IMP-MGTPL In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's brodiaea section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2021 SO
MON-IMP-MGTPL BROORC-9

Management units: 2, 3, 4, 6, 8

In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's brodiaea section in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
BROORC-7 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's brodiaea section in the MSP Rare Plant Management Plan to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
BROORC-8 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's brodiaea in the MSP Rare Plant Management Plan.

regional and/or local POST 2017, 2018, 2019, 2020, 2021 SO
MGT-IMP-MGTPL CAMBRU-1

Management units: 2, 3, 4

From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.

Action Statement Action status Projects
IMP-1 Following best practices in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan, design cactus scrub enhancement and restoration projects to provide high quality nesting and foraging habitat with large patches of cacti >1 m tall in a mosaic of open scrub that provides sufficient food resources for reproduction and survival, especially during drought. As they become available, incoporate the results from the Cactus Wren Demography, Foraging and Arthropod Study to create restoration palettes that favor plant species associated with important arthropod food resources. Design planting layouts to maximize water availability by allocating a portion of the plantings to more mesic sites, such as ravines, at the bottom of slopes, and on northerly and easterly aspects. Control invasive nonnative plants to =20% absolute cover to reduce competition with native plants for water and light. some occurrences are in progress Otay River Valley Cactus Wren Habitat Restoration and Enhancement , Salt Creek Coastal Cactus Wren Habitat Restoration Project
IMP-2 Implement management actions, as needed, to reduce anthropogenic predation on wrens and their nests in fragmented habitats bordered by development where wrens are vulnerable to predation by cats, Cooper's hawks, corvids and other human-subsidized predators. Actions could include removing selected trees within or bordering cactus scrub that provide hunting, roosting, and nesting perches for hawks and corvids and avoiding cactus scrub restoration in areas where the terrain and location make wrens especially vulnerable to predation. Other measures could involve humanely removing feral cats from Conserved Lands and providing educational material and signage encouraging neighboring homeowners to keep their cats indoors so that wrens are protected and cats are safe from predation by wild animals, such as coyotes. some occurrences are in progress Otay River Valley Cactus Wren Habitat Restoration and Enhancement , Salt Creek Coastal Cactus Wren Habitat Restoration Project
Criteria Deadline year
By 2021, =3 High Priority Management Actions Implemented from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan 2021
Code Obj. code Statement
CAMBRU-2 MON-IMP-MGTPL From 2017-2021, collect data on the effectiveness of implementing high priority management actions from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan. In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for the combined Otay and San Diego/El Cajon genetic clusters (see occurrence table) in south San Diego County. These results will be used in 2022 to update management recommendations and success criteria for the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan.
CAMBRU-3 MON-SURV-SPEC From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-5 MON-RES-GEN From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
CAMBRU-6 MGT-IMP-NUR From 2017-2021, continue operation of the North San Diego County Cactus Nursery and support a South San Diego County Cactus Nursery to supply cactus to land managers to enhance, restore and create coastal cactus wren habitat. Grow cactus pads, segments and entire plants sufficient for restoration projects to expand and enhance cactus scrub habitat and as a source of plants for immediate habitat rehabilitation following severe wildfire.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SO
MON-IMP-MGTPL CAMBRU-2

Management units: 2, 3, 4

From 2017-2021, collect data on the effectiveness of implementing high priority management actions from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan. In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for the combined Otay and San Diego/El Cajon genetic clusters (see occurrence table) in south San Diego County. These results will be used in 2022 to update management recommendations and success criteria for the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan.

Action Statement Action status Projects
IMP-1 Collect vegetation data to document success of cactus scrub restoration projects. This can include monitoring the height, diameter and survival of planted cactus and the composition and percent cover of native and nonnative shrubs, forbs and grasses. Document wren use of restored cactus scrub. some occurrences are in progress
IMP-2 Submit restoration and enhancement project metadata, management datasets, and reports to the MSP Web Portal. in progress
IMP-3 Conduct a meta-analysis of habitat restoration data and cactus wren population survey data to determine whether short-term success criteria have been achieved for habitat restoration actions and for wren populations in south San Diego County. Based upon these results, prepare recommendations for the 2022-2031 management strategy for coastal cactus wren. These broad recommendations can be used in 2022 to update the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan with the next set of success criteria and specific, prioritized management actions. waiting for precedent action
IMP-4 Submit cactus wren habitat restoration and population meta-analysis datasets, results, and management strategy recommendations for south San Diego County to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Success Criteria 2013-2021: Restore =70 Acres of High Quality Cactus Scrub and Increase the Combined Otay and San Diego/El Cajon Genetic Clusters to =75 Territories on C 2021
Code Obj. code Statement
CAMBRU-1 MGT-IMP-MGTPL From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.
CAMBRU-3 MON-SURV-SPEC From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-5 MON-RES-GEN From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
CAMBRU-6 MGT-IMP-NUR From 2017-2021, continue operation of the North San Diego County Cactus Nursery and support a South San Diego County Cactus Nursery to supply cactus to land managers to enhance, restore and create coastal cactus wren habitat. Grow cactus pads, segments and entire plants sufficient for restoration projects to expand and enhance cactus scrub habitat and as a source of plants for immediate habitat rehabilitation following severe wildfire.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SO
MON-SURV-SPEC CAMBRU-3

Management units: 2, 3, 4, 6

From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.

Action Statement Action status Projects
SURV-1 Conduct 2 rounds of protocol surveys each year for coastal cactus wrens in mapped cactus at long term monitoring sites and expand monitoring sites, as needed, to include restoration sites and newly conserved cactus scrub. Use standardized protocols to document the number of wrens observed, age, sex, pairing and nesting status, and color band combinations, and to assess habitat for shrub overgrowth and crowding, invasive plants, unhealthy or dead cactus, and dominant shrub and cactus species. Update cactus mapping at restored and newly conserved sites. in progress
SURV-2 In conjunction with the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, focus on collecting banding status data to better understand cactus wren population dynamics, adult and juvenile survival, and dispersal capabilities in south San Diego County. unknown
SURV-3 Submit project metadata, cactus wren survey and habitat assessment datasets, analyses and survey reports to the MSP Web Portal. in progress
Criteria Deadline year
Cactus Wren Surveys and Habitat Assessments Completed 2017-2021 2021
Code Obj. code Statement
CAMBRU-1 MGT-IMP-MGTPL From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.
CAMBRU-2 MON-IMP-MGTPL From 2017-2021, collect data on the effectiveness of implementing high priority management actions from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan. In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for the combined Otay and San Diego/El Cajon genetic clusters (see occurrence table) in south San Diego County. These results will be used in 2022 to update management recommendations and success criteria for the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-5 MON-RES-GEN From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
CAMBRU-7 MGT-IMP-IEX In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
CAMBRU-10 MON-IMP-FMGT For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of coastal cactus wren occurrences affected by the wildfire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing postfire cactus scrub habitat recovery. Collect habitat recovery data at unoccupied cactus scrub sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover wren populations and important cactus scrub habitat patches.
CAMBRU-11 MGT-IMP-FMGT For at least the first 3 years following a wildfire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality cactus scrub to allow for recovery of coastal cactus wren occurrences affected by the wildfire.
regional and/or local NFO 2017, 2018, 2019 SO
MON-RES-SPEC CAMBRU-4

Management units: 2, 3, 4

From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.

Action Statement Action status Projects
RES-1 Capture, uniquely color band, and monitor cactus wrens regularly during the breeding season to collect data on territory and breeding status, nesting phenology, nest fate, number of eggs/nestlings/fledglings per nest, and annual productivity, dispersal and survival. Measure habitat quality at each territory by characterizing the vegetation and by sampling arthropod communities associated with bare ground and 8 plant species common to cactus scrub. Determine nestling diets by collecting fecal samples during banding and using DNA barcoding methods to identify the arthropod taxa fed to nestlings. in progress
RES-2 Identify arthropods important in the diet of nestling cactus wrens based on a DNA barcoding identification of arthropods in fecal samples obtained from the south San Diego County study, from the results of a similar study in Orange County, and from a literature search of adult and nestling cactus wren diets across their range. Evaluate the occurrence of arthropod taxa important to wren diets in association with 8 specific plant species and bare ground to determine those habitat attributes in cactus scrub that provide significant food resources for cactus wrens. Analyze wren reproductive parameters in relation to expected arthropod food availability based on the habitat attributes of each territory. Use the results to develop specific management recommendations for plant restoration palettes and for restoring the composition and cover of plants and bare ground that enhance food availablity for wrens. Determine how plants might be situated in the landscape to enhance arthropod food availability during droughts, such as planting a portion of plants in more mesic sites in ravines, at the bottom of slopes and on northerly and easterly aspects. in progress
RES-3 Project metadata, datasets, analyses, and report with specific management recommendations will be submitted to the MSP Web Portal. in progress
Criteria Deadline year
Coastal Cactus Wren Demography, Vegetation and Arthropod Study and Report with Management Recommendations Completed by 2020 2021
Code Obj. code Statement
CAMBRU-1 MGT-IMP-MGTPL From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.
CAMBRU-2 MON-IMP-MGTPL From 2017-2021, collect data on the effectiveness of implementing high priority management actions from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan. In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for the combined Otay and San Diego/El Cajon genetic clusters (see occurrence table) in south San Diego County. These results will be used in 2022 to update management recommendations and success criteria for the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan.
CAMBRU-3 MON-SURV-SPEC From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
CAMBRU-5 MON-RES-GEN From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
CAMBRU-7 MGT-IMP-IEX In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.
CAMBRU-8 MON-IMP-MGTPL From 2017-2021, collect data on the effectiveness of implementing high priority management actions to restore cactus scrub to expand coastal cactus wren populations and enhance connectivity within the San Pasqual Valley/Lake Hodges genetic cluster (see occurrence table). In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for north San Diego County. Use these results to develop a management strategy that will provide the basis for preparing a North County Coastal Cactus Wren Habitat Conservation and Management Plan in 2022.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
CAMBRU-10 MON-IMP-FMGT For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of coastal cactus wren occurrences affected by the wildfire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing postfire cactus scrub habitat recovery. Collect habitat recovery data at unoccupied cactus scrub sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover wren populations and important cactus scrub habitat patches.
CAMBRU-11 MGT-IMP-FMGT For at least the first 3 years following a wildfire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality cactus scrub to allow for recovery of coastal cactus wren occurrences affected by the wildfire.
regional and/or local NFO 2017, 2018, 2019 SO
MON-RES-GEN CAMBRU-5

Management units: 2, 3, 4, 6

From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.

Action Statement Action status Projects
RES-1 Collaborate with the Natural Community Coalition to repeat the 2012 Southern California Coastal Cactus Wren Genetics Study (Barr et al. 2013, 2015) for the Coastal Orange County-Camp Pendleton, San Diego/El Cajon, Otay, and San Pasqual genetic clusters. Evaluate whether the clusters with low effective population sizes and potential inbreeding have changed their levels of genetic diversity in the intervening 6 years with management to increase cactus scrub and improve connectivity, from translocating wrens between genetic clusters, or from population declines during a long and intense drought. in progress
RES-2 Analyze genetic and reproduction data from Orange County and San Diego County studies to determine if reproduction may be adversely affected by inbreeding or low genetic diversity. If lack of genetic diversity and inbreeding show signs of depressing productivity, then evaluate and prioritize specific management recommendations to increase gene flow, such as switching eggs or translocating individuals between genetic clusters over the short term and restoring habitat to expand populations and improve connectivity within and between genetic clusters over the long term. in progress
RES-3 Submit project metadata, datasets, analyses, and report with specific management recommendations to the MSP Web Portal. in progress
Criteria Deadline year
Genetic Study Completed and Report Submitted by 2020 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Loss of connectivityLOSCON
Code Obj. code Statement
CAMBRU-1 MGT-IMP-MGTPL From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.
CAMBRU-2 MON-IMP-MGTPL From 2017-2021, collect data on the effectiveness of implementing high priority management actions from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan. In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for the combined Otay and San Diego/El Cajon genetic clusters (see occurrence table) in south San Diego County. These results will be used in 2022 to update management recommendations and success criteria for the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan.
CAMBRU-3 MON-SURV-SPEC From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-7 MGT-IMP-IEX In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
CAMBRU-10 MON-IMP-FMGT For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of coastal cactus wren occurrences affected by the wildfire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing postfire cactus scrub habitat recovery. Collect habitat recovery data at unoccupied cactus scrub sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover wren populations and important cactus scrub habitat patches.
CAMBRU-11 MGT-IMP-FMGT For at least the first 3 years following a wildfire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality cactus scrub to allow for recovery of coastal cactus wren occurrences affected by the wildfire.
regional and/or local PRE 2017, 2018, 2019, 2020, 2021 SO
MGT-IMP-NUR CAMBRU-6

Management units: 2, 3, 4, 6

From 2017-2021, continue operation of the North San Diego County Cactus Nursery and support a South San Diego County Cactus Nursery to supply cactus to land managers to enhance, restore and create coastal cactus wren habitat. Grow cactus pads, segments and entire plants sufficient for restoration projects to expand and enhance cactus scrub habitat and as a source of plants for immediate habitat rehabilitation following severe wildfire.

Action Statement Action status Projects
IMP-1 Implement BMPs when harvesting and growing cactus at a nursery in preparation for transplant into natural lands for cactus restoration projects and to provide an emergency source of cactus following wildfire. some occurrences are in progress North County Cactus Nursery and Coastal Cactus Wren Habitat Restoration (2015-2018)
IMP-2 Grow and supply cactus pads, segments, and entire plants from locally harvested native cactus with a composition of species reflecting what naturally occurs in each geographic area. The North County Cactus Nursery should cactus to projects in MUs 6 and 8 and those areas in MU 4 dominated by prickly pear cactus. The South County Cactus Nursery should supply cactus to MUs 2 and 3 and to those areas in MU 4 dominated by coast cholla. The amount of cactus produced will be determined periodically based upon: management recommendations from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan; from ICR's Restoration Analyses for the San Pasqual Valley and Lake Hodges; an evaluation of planned and ongoing cactus restoration projects; and an assessment of cactus needed to be kept in reserve for future post-fire rehabilitation efforts. some occurrences are in progress North County Cactus Nursery and Coastal Cactus Wren Habitat Restoration (2015-2018)
IMP-3 Submit project metadata, nursery plans, and reports with information on harvesting, growing and distributing cactus for restoration projects to the MSP Web Portal. some occurrences are in progress North County Cactus Nursery and Coastal Cactus Wren Habitat Restoration (2015-2018)
Criteria Deadline year
Cactus Nurseries Established in North and South San Diego County to Provide Sufficient Cactus for Restoration and PostFire Rehabilitation 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
CAMBRU-1 MGT-IMP-MGTPL From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-7 MGT-IMP-IEX In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.
CAMBRU-11 MGT-IMP-FMGT For at least the first 3 years following a wildfire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality cactus scrub to allow for recovery of coastal cactus wren occurrences affected by the wildfire.
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SO
MGT-IMP-IEX CAMBRU-7

Management units: 5, 6

In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.

Action Statement Action status Projects
IMP-1 Following best practices, design cactus scrub enhancement and restoration projects to provide high quality nesting and foraging habitat with large patches of cacti >1 m tall in a mosaic of open scrub that provides sufficient food resources for reproduction and survival, especially during drought years when arthropod food resources are limiting. As they become available, incoporate the results from the Cactus Wren Demography, Foraging and Arthropod Study to create restoration palettes that favor plant species associated wtih important wren food resources. Design planting layouts to maximize water availability by allocating a portion of the plantings to more mesic sites, such as ravines, at the bottom of slopes, and on northerly and easterly aspects. Control invasive nonnative plants to =20% absolute cover to reduce competition with native plants for water and light. in progress Hodges Reservoir-Bernardo Bay Cactus Wren Habitat Restoration Grant Project
IMP-2 Implement management actions, as needed, to reduce anthropogenic predation on wrens and their nests in fragmented habitats bordered by development where wrens are vulnerable to predation by cats, Cooper's hawks, corvids and other human-subsidized predators. Actions could include removing selected trees within or bordering cactus scrub that provide hunting, roosting, and nesting perches for hawks and corvids and avoiding cactus scrub restoration in areas where the terrain and location make wrens especially vulnerable to predation. Other measures could involve humanely removing feral cats from Conserved Lands and providing educational material and signage encouraging neighboring homeowners to keep their cats indoors so that wrens are protected and cats are safe from predation by wild animals, such as coyotes. in progress Hodges Reservoir-Bernardo Bay Cactus Wren Habitat Restoration Grant Project
Criteria Deadline year
By 2021, =2 High Priority Management Actions Implemented from ICR's Restoration Analyses for the San Pasqual Valley and Lake Hodges 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
CAMBRU-3 MON-SURV-SPEC From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-5 MON-RES-GEN From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
CAMBRU-6 MGT-IMP-NUR From 2017-2021, continue operation of the North San Diego County Cactus Nursery and support a South San Diego County Cactus Nursery to supply cactus to land managers to enhance, restore and create coastal cactus wren habitat. Grow cactus pads, segments and entire plants sufficient for restoration projects to expand and enhance cactus scrub habitat and as a source of plants for immediate habitat rehabilitation following severe wildfire.
CAMBRU-8 MON-IMP-MGTPL From 2017-2021, collect data on the effectiveness of implementing high priority management actions to restore cactus scrub to expand coastal cactus wren populations and enhance connectivity within the San Pasqual Valley/Lake Hodges genetic cluster (see occurrence table). In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for north San Diego County. Use these results to develop a management strategy that will provide the basis for preparing a North County Coastal Cactus Wren Habitat Conservation and Management Plan in 2022.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SO
MON-IMP-MGTPL CAMBRU-8

Management units: 5, 6

From 2017-2021, collect data on the effectiveness of implementing high priority management actions to restore cactus scrub to expand coastal cactus wren populations and enhance connectivity within the San Pasqual Valley/Lake Hodges genetic cluster (see occurrence table). In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for north San Diego County. Use these results to develop a management strategy that will provide the basis for preparing a North County Coastal Cactus Wren Habitat Conservation and Management Plan in 2022.

Action Statement Action status Projects
IMP-1 Collect vegetation data to document success of cactus scrub restoration projects. This can include monitoring the height, diameter and survival of planted cactus and the composition and percent cover of native and nonnative shrubs, forbs and grasses. Document wren use of restored cactus scrub. some occurrences are in progress
IMP-2 Submit restoration and enhancement project metadata, management datasets, and reports to the MSP Web Portal. some occurrences are in progress
IMP-3 Conduct a meta-analysis of habitat restoration data and cactus wren population survey data to determine whether short-term success criteria have been achieved for habitat restoration actions and for wren populations in north San Diego County. Based upon these results, prepare recommendations for a 2022-2031 management strategy for coastal cactus wren. These broad recommendations can be used in 2022 to prepare a North San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan with specific, prioritized management actions. waiting for precedent action
IMP-4 Submit cactus wren habitat restoration and population meta-analysis datasets, results, and management strategy recommendations for north San Diego County to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Success Criteria 2013-2021: Restore =75 Acres of High Quality Cactus Scrub and Increase the San Pasqual Valley/Lake Hodges Genetic Cluster to =90 Territories on Conserve 2021
Code Obj. code Statement
CAMBRU-3 MON-SURV-SPEC From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
CAMBRU-4 MON-RES-SPEC From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
CAMBRU-5 MON-RES-GEN From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
CAMBRU-7 MGT-IMP-IEX In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.
CAMBRU-9 MGT-IMP-FMGT Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.

regional NFO 2018, 2019 SL
MGT-RSUP-MGT CHANIV-1

Management units: 1, 7

In 2018 and 2019, coordinate with land managers and the wildlife agencies to determine if there are gaps in monitoring and/or management that could use regional support and to develop joint management recommendations.

Action Statement Action status Projects
RSUP-1 Hold meetings with land managers and the wildlife agencies to identify any management and/or monitoring gaps that could use regional support and to develop joint management recommendations.
Criteria Deadline year
Gaps Identified and Recommendations Created in Coordination with Land Managers and Wildlife Agencies 2021
regional NFO 2017, 2018, 2019, 2020, 2021 SL
MON-IMP-MONPL CHANIV-2

Management units: 1, 7

From 2017 to 2021, continue the existing survey efforts for western snowy plover implemented by the wildlife agencies and military.

Action Statement Action status Projects
IMP-1 Submit monitoring data and management recommendations to the MSP web portal.
Criteria Deadline year
Western Snowy Plover Surveys and Reports Completed Annually 2021
local NFO 2020, 2021 SL
MGT-IMP-MGT CHANIV-3

Management units: 1, 7

Beginning in 2020, implement management actions on Conserved Lands as identified through monitoring and the coordination efforts with the land managers and wildlife agencies.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP web portal.
Criteria Deadline year
By 2021, at least 1 Management Actions Implemented for Western Snowy Plover 2021
local NFO 2020, 2021 SL
MON-IMP-MONPL CHANIV-4

Management units: 1, 7

Beginning in 2020, monitor the effectiveness of management actions implemented for western snowy plover on Conserved Lands.

Action Statement Action status Projects
IMP-1 Submit monitoring data and reports to MSP web portal.
Criteria Deadline year
Monitoring data submitted to MSP web portal within one year of management actions being completed. 2021

regional and/or local NFO 2017, 2018, 2019, 2020, 2021 SL
MON-IMP-IMG CHLMAR-1

Management units: 1

Beginning in 2017, annually inspect salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.

Action Statement Action status Projects
IMP-1 Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. some occurrences are in progress
IMP-2 Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
Surveys Completed Annually with Management Recommendations 2021
Threat Name Threat Code
Climate changeCLICHN
Human uses of the PreservesHUMUSE
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
CHLMAR-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
CHLMAR-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
CHLMAR-4 MON-DEV-MODL in 2018, develop models predicting habitat suitability under future climate scenarios and combine the habitat models with projected increases in sea level and urban development to evaluate and prioritize sites for establishing new occurrences of salt marsh bird's-beak. Formulate management recommendations to reduce risk and increase persistence of salt marsh bird's-beak populations under changing conditions of climate and land use.
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CHLMAR-6 MGT-IMP-SBPL From 2017-2019, collect salt marsh bird's-beak seed for conservation banking. In 2019, begin implementing high priority actions for salt marsh bird's-beak from the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CHLMAR-7 MGT-PRP-MGTPL In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.
CHLMAR-8 MGT-IMP-MGTPL In 2019, begin implementing highest priority management actions identified for salt marsh bird's-beak in the MSP Rare Plant Management Plan.
local NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-IMG CHLMAR-2

Management units: 1

Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.

Action Statement Action status Projects
IMP-1 Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. available for implementation
IMP-2 Submit project metadata and management data to the MSP Web Portal. available for implementation
Criteria Deadline year
Routine Management Completed as Needed Based Upon Monitoring Recommendations 2021
Threat Name Threat Code
Climate changeCLICHN
Human uses of the PreservesHUMUSE
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
CHLMAR-1 MON-IMP-IMG Beginning in 2017, annually inspect salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Regional NFO 2018 SL
MON-DEV-MODL CHLMAR-4

Management units: 1

in 2018, develop models predicting habitat suitability under future climate scenarios and combine the habitat models with projected increases in sea level and urban development to evaluate and prioritize sites for establishing new occurrences of salt marsh bird's-beak. Formulate management recommendations to reduce risk and increase persistence of salt marsh bird's-beak populations under changing conditions of climate and land use.

Action Statement Action status Projects
DEV-1 Work with land managers, species experts, scientists and other stakeholders to identify opportunities to manage for long-term persistence of salt marsh bird's-beak under changing climate and land use conditions. On hold
DEV-2 Submit project metadata, models, data layers and report with management recommendation to the MSP Web Portal. On hold
Criteria Deadline year
Modeling and Management Recommendations Completed by 2019 2021
Threat Name Threat Code
Climate changeCLICHN
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
CHLMAR-1 MON-IMP-IMG Beginning in 2017, annually inspect salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
CHLMAR-3 MON-RES-GEN In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for salt marsh bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing to enhance existing occurrences and establish new occurrences.
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CHLMAR-7 MGT-PRP-MGTPL In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.
Regional NFO 2018 SL
MGT-PRP-SBPL CHLMAR-5

Management units: 1

Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-2 Prepare the seed collection plan to incorporate genetic study results and with recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-3 The seed collection plan should have guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-6 Submit project metadata and the MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
Criteria Deadline year
By 2019, Completed Salt Marsh Bird's-beak Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
CHLMAR-1 MON-IMP-IMG Beginning in 2017, annually inspect salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
CHLMAR-3 MON-RES-GEN In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for salt marsh bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing to enhance existing occurrences and establish new occurrences.
CHLMAR-4 MON-DEV-MODL in 2018, develop models predicting habitat suitability under future climate scenarios and combine the habitat models with projected increases in sea level and urban development to evaluate and prioritize sites for establishing new occurrences of salt marsh bird's-beak. Formulate management recommendations to reduce risk and increase persistence of salt marsh bird's-beak populations under changing conditions of climate and land use.
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CHLMAR-6 MGT-IMP-SBPL From 2017-2019, collect salt marsh bird's-beak seed for conservation banking. In 2019, begin implementing high priority actions for salt marsh bird's-beak from the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CHLMAR-7 MGT-PRP-MGTPL In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.
Regional and/or Local NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-SBPL CHLMAR-6

Management units: 1

From 2017-2019, collect salt marsh bird's-beak seed for conservation banking. In 2019, begin implementing high priority actions for salt marsh bird's-beak from the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
Criteria Deadline year
By 2022, =2 Highest Priority Actions Implemented for Salt Marsh Bird's-beak from the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CHLMAR-7 MGT-PRP-MGTPL In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.
CHLMAR-8 MGT-IMP-MGTPL In 2019, begin implementing highest priority management actions identified for salt marsh bird's-beak in the MSP Rare Plant Management Plan.
regional NFO 2018, 2019 SL
MGT-PRP-MGTPL CHLMAR-7

Management units: 1

In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the salt marsh bird's-beak section in the MSP Rare Plant Management Plan. some occurrences are in progress
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to salt marsh bird's-beak occurrences. some occurrences are in progress
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence status, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. some occurrences are in progress
PRP-4 Develop an implementation plan for salt marsh bird's-beak that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. some occurrences are in progress
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2019, Completed Salt Marsh Bird's-beak Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
CHLMAR-1 MON-IMP-IMG Beginning in 2017, annually inspect salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
CHLMAR-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
CHLMAR-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
CHLMAR-3 MON-RES-GEN In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for salt marsh bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing to enhance existing occurrences and establish new occurrences.
CHLMAR-4 MON-DEV-MODL in 2018, develop models predicting habitat suitability under future climate scenarios and combine the habitat models with projected increases in sea level and urban development to evaluate and prioritize sites for establishing new occurrences of salt marsh bird's-beak. Formulate management recommendations to reduce risk and increase persistence of salt marsh bird's-beak populations under changing conditions of climate and land use.
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CHLMAR-6 MGT-IMP-SBPL From 2017-2019, collect salt marsh bird's-beak seed for conservation banking. In 2019, begin implementing high priority actions for salt marsh bird's-beak from the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CHLMAR-8 MGT-IMP-MGTPL In 2019, begin implementing highest priority management actions identified for salt marsh bird's-beak in the MSP Rare Plant Management Plan.
CHLMAR-9 MON-IMP-MGTPL In 2019, begin monitoring effectiveness of implementation of highest priority management actions identified in the salt marsh bird's-beak section in the MSPRare Plant Management Plan.
Regional and/or Local NFO 2019, 2020, 2021 SL
MGT-IMP-MGTPL CHLMAR-8

Management units: 1

In 2019, begin implementing highest priority management actions identified for salt marsh bird's-beak in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2022, =2 High Priority Management Actions Implemented for Salt Marsh Bird's-beak from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
CHLMAR-5 MGT-PRP-SBPL Prepare a salt marsh bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from the 2016-2017 genetics study and from 2017-2019 seed collection and banking efforts conducted by San Diego Zoo's Institute for Conservation Research to guide collection and storing of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CHLMAR-6 MGT-IMP-SBPL From 2017-2019, collect salt marsh bird's-beak seed for conservation banking. In 2019, begin implementing high priority actions for salt marsh bird's-beak from the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CHLMAR-7 MGT-PRP-MGTPL In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.
CHLMAR-9 MON-IMP-MGTPL In 2019, begin monitoring effectiveness of implementation of highest priority management actions identified in the salt marsh bird's-beak section in the MSPRare Plant Management Plan.
Regional and/or Local NFO 2019, 2020, 2021 SL
MON-IMP-MGTPL CHLMAR-9

Management units: 1

In 2019, begin monitoring effectiveness of implementation of highest priority management actions identified in the salt marsh bird's-beak section in the MSPRare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
CHLMAR-7 MGT-PRP-MGTPL In 2018, begin preparing a salt marsh bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and enhance large occurrences, enhance and expand at least 3 small occurrences, and establish at least 1 new occurrence on Conserved Lands (see occurrence table). Management actions should be based upon an assessment of data on occurrence status, habitat and threats and include recommendations for creating salt marsh habitat and establishing new occurrences in response to a projected rise in sea level and for re-establishing historic occurrences as necessary for gene flow and long term persistence. Include recommendations from the 2017 genetics study, MSP Seed Collection, Banking and Bulking Plan, relevant best management practices (BMPs), and for monitoring the effectiveness of management actions.
CHLMAR-8 MGT-IMP-MGTPL In 2019, begin implementing highest priority management actions identified for salt marsh bird's-beak in the MSP Rare Plant Management Plan.

Regional NFO 2019 SL
MGT-PRP-SBPL CLICHA-3

Management units: 3, 4

In 2019, begin preparing a San Miguel savory section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the San Miguel savory section in the MSP Seed Collection, Banking and Bulking Plan. On hold
PRP-2 Prepare the seed collection plan to include recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. On hold
PRP-3 The seed collection plan should have guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. On hold
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). On hold
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. On hold
PRP-6 Submit project metadata and the MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. On hold
Criteria Deadline year
By 2020, Completed San Miguel Savory Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
CLICHA-1 MON-IMP-IMG Beginning in 2018, inspect San Miguel savory occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2018, repeat monitoring every 2 years.
CLICHA-4 MGT-IMP-SBPL In 2020, begin implementing high priority actions for San Miguel savory in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CLICHA-5 MGT-PRP-MGTPL In 2019, begin preparing a San Miguel savory section in the MSP Rare Plant Management Plan that prioritizes management actions to enhance at least 3 occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare prioritized management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, if determined to be necessary for gene flow and population persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
Regional and/or Local NFO 2020, 2021 SL
MGT-IMP-SBPL CLICHA-4

Management units: 3, 4

In 2020, begin implementing high priority actions for San Miguel savory in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. waiting for precedent action
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2024, =1 Highest Priority Action Implemented for San Miguel Savory from the MSP Seed Banking and Bulking Plan 2021
Code Obj. code Statement
CLICHA-3 MGT-PRP-SBPL In 2019, begin preparing a San Miguel savory section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CLICHA-6 MGT-IMP-MGTPL In 2020, begin implementing highest priority management actions identified for San Miguel savory in the MSP Rare Plant Management Plan.
regional NFO 2019, 2020 SL
MGT-PRP-MGTPL CLICHA-5

Management units: 3, 4

In 2019, begin preparing a San Miguel savory section in the MSP Rare Plant Management Plan that prioritizes management actions to enhance at least 3 occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare prioritized management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, if determined to be necessary for gene flow and population persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the San Miguel savory section in the MSP Rare Plant Management Plan. on hold
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to San Miguel savory occurrences. on hold
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence status, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. on hold
PRP-4 Develop an implementation plan for San Miguel savory that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. on hold
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. on hold
Criteria Deadline year
By 2020, Completed San Miguel Savory Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
CLICHA-1 MON-IMP-IMG Beginning in 2018, inspect San Miguel savory occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2018, repeat monitoring every 2 years.
CLICHA-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring in 2016, 2018, and 2020 at San Miguel savory occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
CLICHA-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring in 2016, 2018, and 2020 at San Miguel savory occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
CLICHA-3 MGT-PRP-SBPL In 2019, begin preparing a San Miguel savory section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
CLICHA-4 MGT-IMP-SBPL In 2020, begin implementing high priority actions for San Miguel savory in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CLICHA-6 MGT-IMP-MGTPL In 2020, begin implementing highest priority management actions identified for San Miguel savory in the MSP Rare Plant Management Plan.
CLICHA-7 MON-IMP-MGTPL In 2020, begin monitoring effectiveness of implementation of highest priority management actions identified in the San Miguel savory section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2020, 2021 SL
MGT-IMP-MGTPL CLICHA-6

Management units: 3, 4

In 2020, begin implementing highest priority management actions identified for San Miguel savory in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2024, =1 High Priority Management Action Implemented for San Miguel Savory Section from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
CLICHA-4 MGT-IMP-SBPL In 2020, begin implementing high priority actions for San Miguel savory in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
CLICHA-5 MGT-PRP-MGTPL In 2019, begin preparing a San Miguel savory section in the MSP Rare Plant Management Plan that prioritizes management actions to enhance at least 3 occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare prioritized management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, if determined to be necessary for gene flow and population persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
CLICHA-7 MON-IMP-MGTPL In 2020, begin monitoring effectiveness of implementation of highest priority management actions identified in the San Miguel savory section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2020, 2021 SL
MON-IMP-MGTPL CLICHA-7

Management units: 3, 4

In 2020, begin monitoring effectiveness of implementation of highest priority management actions identified in the San Miguel savory section in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
CLICHA-5 MGT-PRP-MGTPL In 2019, begin preparing a San Miguel savory section in the MSP Rare Plant Management Plan that prioritizes management actions to enhance at least 3 occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare prioritized management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, if determined to be necessary for gene flow and population persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence.
CLICHA-6 MGT-IMP-MGTPL In 2020, begin implementing highest priority management actions identified for San Miguel savory in the MSP Rare Plant Management Plan.

regional NFO 2018 SS
MGT-PRP-MGTPL DEICON-6

Management units: 3

In 2018, begin preparing an Otay tarplant section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for Otay tarplant in the MSP Rare Plant Management Plan. some occurrences are in progress
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to Otay tarplant occurrences. some occurrences are in progress
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. some occurrences are in progress
PRP-4 Develop an implementation plan for Otay tarplant that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. some occurrences are in progress
PRP-5 Submit project metadata, project datasets, and the MSP Rare Plant Management Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2019, Completed Otay Tarplant Section in the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
DEICON-1 MON-IMP-IMG In 2017, begin annual inspections of extant occurrences of Otay tarplant on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record spatial extent, estimate abundance, and collect habitat and threat covariate data to determine management needs.
DEICON-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the annual IMG monitoring at Otay tarplant occurrences on Conserved Lands (see occurrence table) . Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
DEICON-3 MGT-DEV-BMP In 2017 continue the collaboration with the South County Grasslands Project initiated in 2014 to develop BMPs for landscape-scale restoration of Otay tarplant habitat in MU3 that includes testing methods of seeding and invasive plant control so that nonnative plants and thatch are reduced to less than 20% relative cover and thatch to <5 cm tall and native plants to at least 25% relative cover. These percent cover criteria could be revised based on data collected from an acceptable reference site.
DEICON-4 MON-RES-GEN In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Otay tarplant occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
DEICON-5 MGT-IMP-IEX Beginning in 2018, and continuing for 3 years at the 3 Otay tarplant restoration sites initiated under the South County Grasslands project, use BMPs to maintain the maximum occupied extent and a surrounding buffer area equal to 25% of this extent by preventing ground disturbance and reducing nonnative plants and thatch to less than 20% total cover and thatch to <5 cm tall.
DEICON-7 MGT-IMP-MGTPL In 2019, begin implementation of highest priority management actions for Otay tarplant identified in the MSP Rare Plant Management Plan.
DEICON-8 MON-IMP-MGTPL In 2019, begin monitoring the effectiveness of implementation of highest priority management actions identified in the Otay tarplant section in the MSP Rare Plant Management Plan.
DEICON-9 MGT-PRP-SBPL In 2018, begin preparing a section for Otay tarplant in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009, KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for:collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Regional and/or Local NFO 2019, 2020, 2021 SS
MGT-IMP-MGTPL DEICON-7

Management units: 3

In 2019, begin implementation of highest priority management actions for Otay tarplant identified in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata and management datasets, report to MSP web portal waiting for precedent action
Criteria Deadline year
By 2023, =1 High Priority Management Action Implemented for Otay tarplant from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
DEICON-6 MGT-PRP-MGTPL In 2018, begin preparing an Otay tarplant section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.
DEICON-8 MON-IMP-MGTPL In 2019, begin monitoring the effectiveness of implementation of highest priority management actions identified in the Otay tarplant section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2019, 2020, 2021 SS
MON-IMP-MGTPL DEICON-8

Management units: 3

In 2019, begin monitoring the effectiveness of implementation of highest priority management actions identified in the Otay tarplant section in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
DEICON-6 MGT-PRP-MGTPL In 2018, begin preparing an Otay tarplant section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.
DEICON-7 MGT-IMP-MGTPL In 2019, begin implementation of highest priority management actions for Otay tarplant identified in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021 SS
MGT-IMP-SBPL DEICON-10

Management units: 3

In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Otay tarplant to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. some occurrences are in progress
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2023, > 1 Highest Priority Action Implemented for Otay Tarplant from the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
DEICON-9 MGT-PRP-SBPL In 2018, begin preparing a section for Otay tarplant in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009, KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for:collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Regional NFO 2017 SS
MON-RES-SPEC DEICON-11

Management units: 3

In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for Otay tarplant and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.

Action Statement Action status Projects
RES-1 Test soils at potential expansion sites and compare to occupied reference sites to determine site suitability based on soils. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-2 Prepare habitat suitability models under current environmental conditions and for different scenarios of climate change to delineate potential future habitat. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-3 Collect covariate data on vegetation composition and cover (alliance and association-level mapping), soils, invasive plants and other threats for selected populations. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-4 Prioritize locations for conservation, management, and future surveys based on predicted distributions and environmental correlates. In progress Enhancing the Resilience of Edaphic Endemic Plants
RES-5 Submit project metadata, monitoring data, habitat models, analyses, and report to MSP web portal. In progress Enhancing the Resilience of Edaphic Endemic Plants
Criteria Deadline year
Refined Models and Prioritized Future Survey Locations for Otay Tarplant by 2018 2021
Threat Name Threat Code
Climate changeCLICHN
Invasive plantsINVPLA
Loss of connectivityLOSCON
Urban developmentURBDEV
Code Obj. code Statement
DEICON-10 MGT-IMP-SBPL In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Otay tarplant to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Regional NFO 2020 SL
MGT-PRP-SBPL DICORC-6

Management units: 1, 3

In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research and from the 2016-2017 genetic study to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-2 Prepare the seed collection plan to incorporate genetic study results and with recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-3 The seed collection plan should have guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
PRP-6 Submit project metadata and the MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
Criteria Deadline year
By 2021, Completed Orcutt's Bird's-beak Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
DICORC-1 MON-IMP-IMG From 2017 to 2021, inspect Orcutt's bird's-beak occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
DICORC-3 MON-RES-GEN In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Orcutt's bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
DICORC-5 MGT-IMP-IEX From 2017 to 2019, enhance Orcutt's bird's-beak at the Cal Terraces/Dennery Canyon occurrence (see occurrence table). Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than or equal to 20% absolute cover within the occurrence’s occupied extent and adjacent suitable habitat.
DICORC-7 MGT-IMP-SBPL From 2017-2019, collect Orcutt's bird's-beak seed for conservation banking and bulk seed for enhancing and expanding the Cal Terraces/Dennery Canyon occurrence (see occurrence table). In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
DICORC-8 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare management recommendations for re-establishment of historic occurrences or establishment of new occurrences if determined to be necessary for gene flow and for long term persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
Regional and/or Local NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-SBPL DICORC-7

Management units: 1, 3

From 2017-2019, collect Orcutt's bird's-beak seed for conservation banking and bulk seed for enhancing and expanding the Cal Terraces/Dennery Canyon occurrence (see occurrence table). In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. some occurrences are in progress California Plant Rescue (CaPR) - San Diego Zoo Wildlife Alliance's Native Plant Seed Bank
Criteria Deadline year
By 2025, =1 Highest Priority Action Implemented for Orcutt'sBird's-beak from the MSP Seed Banking and Bulking Plan 2021
Code Obj. code Statement
DICORC-5 MGT-IMP-IEX From 2017 to 2019, enhance Orcutt's bird's-beak at the Cal Terraces/Dennery Canyon occurrence (see occurrence table). Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than or equal to 20% absolute cover within the occurrence’s occupied extent and adjacent suitable habitat.
DICORC-6 MGT-PRP-SBPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research and from the 2016-2017 genetic study to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
DICORC-8 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare management recommendations for re-establishment of historic occurrences or establishment of new occurrences if determined to be necessary for gene flow and for long term persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
DICORC-9 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's bird's-beak in the MSP Rare Plant Management Plan.
regional NFO 2020 SL
MGT-PRP-MGTPL DICORC-8

Management units: 1, 3

In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare management recommendations for re-establishment of historic occurrences or establishment of new occurrences if determined to be necessary for gene flow and for long term persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's bird's-beak section in the MSP Rare Plant Management Plan. on hold
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to Orcutt's bird's-beak occurrences. on hold
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence status, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. on hold
PRP-4 Develop an implementation plan for Orcutt's bird's-beak that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. on hold
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. on hold
Criteria Deadline year
By 2021, Completed Orcutt's Bird's-beak Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
DICORC-1 MON-IMP-IMG From 2017 to 2021, inspect Orcutt's bird's-beak occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
DICORC-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Orcutt's bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
DICORC-3 MON-RES-GEN In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Orcutt's bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
DICORC-4 MON-SURV-SPEC In 2019, survey historic Orcutt's bird's-beak locations to determine occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
DICORC-5 MGT-IMP-IEX From 2017 to 2019, enhance Orcutt's bird's-beak at the Cal Terraces/Dennery Canyon occurrence (see occurrence table). Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than or equal to 20% absolute cover within the occurrence’s occupied extent and adjacent suitable habitat.
DICORC-6 MGT-PRP-SBPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research and from the 2016-2017 genetic study to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
DICORC-7 MGT-IMP-SBPL From 2017-2019, collect Orcutt's bird's-beak seed for conservation banking and bulk seed for enhancing and expanding the Cal Terraces/Dennery Canyon occurrence (see occurrence table). In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
DICORC-9 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's bird's-beak in the MSP Rare Plant Management Plan.
DICORC-10 MON-IMP-MGTPL In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's bird's-beak section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2021 SL
MGT-IMP-MGTPL DICORC-9

Management units: 1, 7

In 2021, begin implementing highest priority management actions identified for Orcutt's bird's-beak in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2025, =1 High Priority Management Action Implemented for Orcutt's Bird's-beak from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
DICORC-6 MGT-PRP-SBPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research and from the 2016-2017 genetic study to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
DICORC-7 MGT-IMP-SBPL From 2017-2019, collect Orcutt's bird's-beak seed for conservation banking and bulk seed for enhancing and expanding the Cal Terraces/Dennery Canyon occurrence (see occurrence table). In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
DICORC-8 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare management recommendations for re-establishment of historic occurrences or establishment of new occurrences if determined to be necessary for gene flow and for long term persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
DICORC-10 MON-IMP-MGTPL In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's bird's-beak section in the MSP Rare Plant Management Plan.
regional and/or local NFO 2021 SL
MON-IMP-MGTPL DICORC-10

Management units: 1, 7

In 2021, monitor effectiveness of implementation of highest priority management actions identified in the Orcutt's bird's-beak section in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
DICORC-6 MGT-PRP-SBPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should include recommendations from 2017-2019 seed collection and bulking efforts conducted by San Diego Zoo's Institute for Conservation Research and from the 2016-2017 genetic study to collect and store seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
DICORC-7 MGT-IMP-SBPL From 2017-2019, collect Orcutt's bird's-beak seed for conservation banking and bulk seed for enhancing and expanding the Cal Terraces/Dennery Canyon occurrence (see occurrence table). In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
DICORC-8 MGT-PRP-MGTPL In 2020, begin preparing an Orcutt's bird's-beak section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain large occurrences and expand at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Prepare management recommendations for re-establishment of historic occurrences or establishment of new occurrences if determined to be necessary for gene flow and for long term persistence. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
DICORC-9 MGT-IMP-MGTPL In 2021, begin implementing highest priority management actions identified for Orcutt's bird's-beak in the MSP Rare Plant Management Plan.

regional NFO 2017, 2018, 2019 SL
MON-RES-SPEC EMPTRA-1

Management units: 1, 4, 6, 8, 9, 10, 11

In 2017-2019, continue the 5-year breeding bird study begun by USGS in 2015 of southwestern willow flycatcher in the San Luis Rey River and other drainages to determine the status in the MSPA and impacts to riparian habitat from SHB/Fusarium complex and other threats. Prepare site-specific management recommendations based on survey results.

Action Statement Action status Projects
RES-1 Submit monitoring data and management recommendations to MSP web portal In progress
Criteria Deadline year
Southwestern Willow Flycatcher Surveys and Reports Completed by 2020 2021
regional NFO 2020, 2021 SL
MGT-PRP-MGTPL EMPTRA-2

Management units: 1, 4, 6, 8, 9, 10, 11

In 2020-2021, prepare a management plan for southwestern willow flycatcher based on survey recommendations and that includes provisions for reducing potential impacts of SHB/Fusarium infestation in occupied or potential habitat. Incorporate SHB/Fusarium monitoring results into the management plan, particularly along the San Luis Rey River.

Action Statement Action status Projects
PRP-1 Prioritize management actions, focusing on reducing threats and expanding occurrences in areas most likely to remain viable over the long-term in the context of future land development. Available for implementation
PRP-2 Develop an implementation plan for southwestern willow flyycatcher that prioritizes management actions for the next five years. Available for implementation
PRP-3 Submit management plan to MSP web portal Available for implementation
Criteria Deadline year
Management Plan for Southwestern Willow Flycatcher prepared by end 2021 2021
regional NFO 2021 SL
MGT-IMP-MGTPL EMPTRA-3

Management units: 1, 4, 6, 8, 9, 10, 11

Beginning in 2021, implement the highest priority management actions for southwestern willow flycatcher on Conserved Lands.

Action Statement Action status Projects
IMP-1 Management actions to be determined by the management plan. waiting for precedent action
IMP-2 Submit project data and management actions to MSP web portal waiting for precedent action
Criteria Deadline year
Management actions initiated for Southwestern Willow Flycatcher 2021
regional NFO 2021 SL
MON-IMP-MGTPL EMPTRA-4

Management units: 1, 4, 6, 8, 9, 10, 11

Beginning in 2021, monitor the effectiveness of management actions implemented for southwestern willow flycatcher on Conserved Lands

Action Statement Action status Projects
IMP-1 Submit monitoring data and reports to MSP web portal waiting for precedent action
Criteria Deadline year
Monitoring completed and data and report submitting within 1 year of management actions being completed. 2021

Regional NFO 2021 SL
MGT-PRP-SBPL ERYAMM-4

Management units: 1, 6, 7

In 2021, begin preparing a section for coast wallflower in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009; KEW 2016) to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds to provide source material with consideration of potential genetic consequences; for management oriented research; seed bulking; and out-planting to augment extant occurrences or establish new occurrences.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the coast wallflower section in the MSP Seed Collection, Banking and Bulking Plan. some occurrences are in progress
PRP-2 Prepare a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. some occurrences are in progress
PRP-3 The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. some occurrences are in progress
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). some occurrences are in progress
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. some occurrences are in progress
PRP-6 Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to the MSP Web Portal. some occurrences are in progress
Criteria Deadline year
By 2022, Completed Coast Wallflower Section in MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
ERYAMM-1 MON-IMP-IMG Beginning in 2017, inspect occurrences of coast wallflower on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to record status and to collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years.
ERYAMM-3 MON-SURV-SPEC In 2019, conduct baseline surveys of historic coast wallflower locations to determine current occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats covariates and determine management needs.
ERYAMM-5 MGT-PRP-MGTPL In 2021, begin preparing a section for coast wallflower in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
regional NFO 2021 SL
MGT-PRP-MGTPL ERYAMM-5

Management units: 1, 6, 7

In 2021, begin preparing a section for coast wallflower in the MSP Rare Plant Management Plan that prioritizes management actions to maintain and expand conserved occurrences based upon an assessment of data on occurrence status, habitat and threats. Prioritize management recommendations for re-establishment of historic occurrences or establishment of new occurrences in suitable habitat, as needed, to achieve at least 4 occurrences with self-sustaining populations on Conserved Lands (see occurrence table). Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence

Action Statement Action status Projects
PRP-1 Prioritize extant occurrences for management based upon "IMG" monitoring data and baseline survey assessments of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. on hold
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to coast wallflower occurrences. on hold
PRP-3 Identify and prioritize sites for re-establishment of historic occurrences or that appear suitable for establishment of new occurrences. Specify the highest priority sites for establishing occurrences to reach the goal of at least 4 extant occurrences on Conserved Lands. on hold
PRP-4 Develop an implementation plan for coast wallflower that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. on hold
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to MSP Web Portal. on hold
Criteria Deadline year
By 2022, Completed Coast Wallflower Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
ERYAMM-1 MON-IMP-IMG Beginning in 2017, inspect occurrences of coast wallflower on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to record status and to collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years.
ERYAMM-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at coastal wallflower occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
ERYAMM-3 MON-SURV-SPEC In 2019, conduct baseline surveys of historic coast wallflower locations to determine current occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats covariates and determine management needs.
ERYAMM-4 MGT-PRP-SBPL In 2021, begin preparing a section for coast wallflower in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009; KEW 2016) to provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds to provide source material with consideration of potential genetic consequences; for management oriented research; seed bulking; and out-planting to augment extant occurrences or establish new occurrences.

Regional and/or Local NFO 2018, 2019, 2020, 2021 VF
MON-IMP-MONPL ERYARI-1

Management units: 3, 6

Beginning in 2018, conduct annual surveys for San Diego button-celery in occupied, historically occupied and potentially suitable vernal pools to determine cover clases in each basin and cover of each nonnative species using a standardize protocol as defined in the VPMMP (City of San Diego 2015). Nonnative cover classes will be combined to determine if management triggers for Level 1, 2 or 3 management are met. Management recommendations will be made, noting individual nonnative species that pose a threat to direct specific management actions. Management actions will be implemented annually as part of the general vernal pool habitat management objectives for different management levels (ML1, ML2, ML3).

Action Statement Action status Projects
IMP-1 Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. On hold
Criteria Deadline year
Annual Surveys Completed with Management Recommendations 2021
Threat Name Threat Code
Altered hydrologyALTHYD
Climate changeCLICHN
Human uses of the PreservesHUMUSE
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
NAVFOS-1 MON-IMP-MONPL Beginning in 2018, conduct annual surveys for spreading navarretia in occupied, historically occupied and potentially suitable vernal pools to determine cover clases in each basin and cover of each nonnative species using a standardize protocol as defined in the VPMMP (City of San Diego 2015). Nonnative cover classes will be combined to determine if management triggers for Level 1, 2 or 3 management are met. Management recommendations will be made, noting individual nonnative species that pose a threat to direct specific management actions. Management actions will be implemented annually as part of the general vernal pool habitat management objectives for different management levels (ML1, ML2, ML3).
ORCCAL-1 MON-IMP-MONPL Beginning in 2018, conduct annual surveys for California Orcutt grass in occupied, historically occupied and potentially suitable vernal pools to determine cover clases in each basin and cover of each nonnative species using a standardize protocol as defined in the VPMMP (City of San Diego 2015). Nonnative cover classes will be combined to determine if management triggers for Level 1, 2 or 3 management are met. Management recommendations will be made, noting individual nonnative species that pose a threat to direct specific management actions. Management actions will be implemented annually as part of the general vernal pool habitat management objectives for different management levels (ML1, ML2, ML3).
POGABR-1 MON-IMP-MONPL Beginning in 2018, conduct annual surveys for San Diego mesa mint in occupied, historically occupied and potentially suitable vernal pools to determine cover clases in each basin and cover of each nonnative species using a standardize protocol as defined in the VPMMP (City of San Diego 2015). Nonnative cover classes will be combined to determine if management triggers for Level 1, 2 or 3 management are met. Management recommendations will be made, noting individual nonnative species that pose a threat to direct specific management actions. Management actions will be implemented annually as part of the general vernal pool habitat management objectives for different management levels (ML1, ML2, ML3).
POGNUD-1 MON-IMP-MONPL Beginning in 2018, conduct annual surveys for Otay mesa mint in occupied, historically occupied and potentially suitable vernal pools to determine cover clases in each basin and cover of each nonnative species using a standardize protocol as defined in the VPMMP (City of San Diego 2015). Nonnative cover classes will be combined to determine if management triggers for Level 1, 2 or 3 management are met. Management recommendations will be made, noting individual nonnative species that pose a threat to direct specific management actions. Management actions will be implemented annually as part of the general vernal pool habitat management objectives for different management levels (ML1, ML2, ML3).
VERPOO-1 MON-SURV-VEG Beginning in 2018, conduct annual qualitative monitoring of all vernal pools on Conserved Lands in the MSPA to document threats such as trampling, dumping and invasive plants, and as defined in the City of San Diego's Vernal Pool Managment and Monitoring Plan (VPMMP; City of San Diego 2015). Qualitative surveys should be conducted during the wet season using standardized protocols and should assess threats, whether pools are inundated, and verify fairy shrimp viability and reproduction. Three visits should be made during the wet season to determine pool inundation. The monitoring results should be used to determine the overall disturbance category (i.e., Levels 1-3), formulate management recommendations and to determine whether more comprehensive threats monitoring is required.
VERPOO-2 MON-SURV-VEG Beginning in 2018, conduct baseline hydrological surveys of vernal pools on Conserved Lands in the MSPA to characterize the hydrology of each basin within a vernal pool complex and prepare a report with survey results for each pool complex. Use a standardized methodology and protocol to determine maximum pool depth, define pool inlet and outlets, and geomorphic setting of the complex, as described in the VPMMP (City of San Diego 2015).
VERPOO-3 MON-EVAL-DIST Starting in 2018, conduct a topographic disturbance assessment if annual qualitiative monitoring indicates there is topographical and/or hydrological disturbance at a vernal pool (see City of San Diego VPMMP). Measure maximum pool depth for each basin, determine inlet and outlet locations. These data can be compared against baseline hydrological survey data to inform management recommendations. If there is a need to reconstruct a basin because of disturbance, then monitoring should be repeated to determine if the restored pool has achieved hydrological function.
VERPOO-4 MGT-IMP-VPML1 Beginning in 2018, conduct annual routine stewardship management to maintain vernal pool habitat and existing MSP species populations as defined in the VPMMP (City of San Diego 2015). Level 1 pools are those where little maintenance is needed, other than routine access patrols and enforcement, removal of trash and debris, edge effects maintenance (e.g., offsite erosion control and irrigation management), maintaining fencing and signage, reparing trespass damage, repairing minor topographic disturbances, and controlling invasive plants for MSP species and general habitat maintenance (2 visits per spring).
VERPOO-5 MGT-IMP-VPML2 Beginning in 2018, conduct Level 2 management to enhance and stabilize vernal pool habitat and MSP species that monitoring has shown to be in decline based on VPMMP (City of San Diego 2015) management triggers. Level 2 management includes implementing all Level 1 actions in addition to other more intensive management. This more intensive management includes mechanized and hand repair to baseline conditions those moderate topographic disturbances that affect pool integrity, ponding potential and overall size as defined in the VPMMP (City of San Diego 2015). Vernal pools with MSP species should be dethatched as needed to clear thatch from vernal pool basins and in = 20-foot surrounding site-specific management buffers followed up with invasive plant control 2 times in the spring. General invasive plant control should be conducted in other vernal pool basins and/or associated upland watersheds, with the number of visits increased to 3 per year. For Level 2 management, seed banking, bulking and redistribution may be needed to enhance declining populations of MSP plant species. For declining MSP fairy shrimp populations, additional monitoring is required to determine what is causing the decline followed by management to mitigate the threat. Shrimp cysts may need to be collected from other pools in the complex and redistributed into the impacted pool, although with no collection from pools containing Lindahl's fairy shrimp. Off-site cyst collection may be implemented if there is no on-site cyst bank or it is too depauperate.
VERPOO-6 MGT-IMP-VPML3 Beginning in 2018, conduct Level 3 management to restore vernal pool habitat and MSP species that monitoring has shown to be in decline or in very poor condition based on VPMMP (City of San Diego 2015) management triggers. Level 3 management includes implementing all Level 1 actions in addition to other more intensive management. This more intensive management includes restoring existing pools to increase populaitons of MSP species, mechanized and hand repair to baseline conditions those extensive topographic disturbances that affect pool integrity, ponding potential and overall size as defined in the VPMMP (City of San Diego 2015). Vernal pools with MSP species should be dethatched as needed to clear thatch from vernal pool basins and in a 35-foot watershed management buffer followed up with invasive plant control 4 times in the spring. General invasive plant control should be conducted in other vernal pool basins and/or associated upland watersheds, with the number of visits increased to 4 per year. For Level 3 management, some MSP species may be absent from the seed bank, requiring off-site collection from genetically appropriate populations, bulking and redistribution to restore the MSP species seed bank. Container plantings may also be needed to restore MSP species. For declining MSP fairy shrimp populations, additional monitoring is required to determine what is causing the decline followed by management to mitigate the threat. Shrimp cysts may need to be collected from other pools in the complex and redistributed into the impacted pool, although with no collection from pools containing Lindahl's fairy shrimp. Off-site cyst collection may be implemented if there is no on-site cyst bank or it is too depauperate.

regional NFO 2017, 2018 SL
MON-DEV-MODL EUPEDI-1

Management units: 3, 4, 6, 9

In 2017-2018, develop habitat suitability models for Quino checkerspot, host plants, and nectaring plants under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans.

Action Statement Action status Projects
DEV-1 Submit project metadata, modeling datasets, results and report to the MSP Web Portal. In progress
Criteria Deadline year
Quino Checkerspot Current and Future Climate Habitat Models and Report Completed in 2017 2021
Code Obj. code Statement
EUPEDI-6 MGT-PRP-MGTPL In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
regional NFO 2017, 2018, 2019 SL
MON-PRP-MONPL EUPEDI-2

Management units: 3, 4, 6, 9

Beginning in 2017, prepare a long-term Quino checkerspot metapopulation monitoring plan to track population distribution, abundance, and phenology, and to assess habitats and threats at checkerspot occurrences (see occurrence table), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to include specific monitoring questions, the sampling frame within the MSPA, monitoring methods, a statistically valid sampling design, sampling locations, timeline, and standardized protocols for determining the status and abundance of larval and adult butterflies and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations. The monitoring plan will be piloted with field surveys in 2018 to determine if adjustments need to be made and will be finalized in 2019 and then added to the final management plan in 2021 to create a comprehensive Quino Checkerspot Management and Monitoring Plan.

Action Statement Action status Projects
PRP-1 Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop the monitoring plan. in progress
PRP-2 Include fire risk and climate change modeling results to provide management recommendations in relation to fire and climate refugia and to reduce fire risk at occurrences. in progress
PRP-3 Submit project metadata, datasets and Quino Checkerspot Monitoring Plan to the MSP Web Portal. in progress
Criteria Deadline year
Quino Checkerspot Metapopulation Monitoring Plan Completed in 2019 2019
Code Obj. code Statement
EUPEDI-1 MON-DEV-MODL In 2017-2019, develop habitat suitability models for Quino checkerspot, host plants, and nectaring plants under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans.
EUPEDI-1 MON-DEV-MODL In 2017-2018, develop habitat suitability models for Quino checkerspot, host plants, and nectaring plants under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans.
EUPEDI-3 MON-IMP-MONPL In 2018 conduct pilot monitoring to evaluate monitoring methodology and sampling design and locations, and prepare recommendations for any adjustments to the monitoring plan. From 2019 to 2021, implement monitoring annually and submit data with management recommendations.
regional NFO 2018, 2019, 2020, 2021 SL
MON-IMP-MONPL EUPEDI-3

Management units: 3, 4, 6, 9

In 2018 conduct pilot monitoring to evaluate monitoring methodology and sampling design and locations, and prepare recommendations for any adjustments to the monitoring plan. From 2019 to 2021, implement monitoring annually and submit data with management recommendations.

Action Statement Action status Projects
IMP-1 Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Monitoring Implemented and Data with Recommendations Submitted Annually 2021
regional NFO 2017, 2018 SL
MGT-PRP-SBPL EUPEDI-4

Management units: 3, 4, 6, 9

In 2017-2018, develop a section for Quino checkerpot nectaring forbs and host plants in the MSP Seed Collection, Banking and Bulking Plan to enhance and restore habitat for the butterfly. The plan should incorporate best science and management practices (e.g., Wall 2009; KEW 2016) to provide guidelines for collecting and providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds to provide source material with consideration of potential genetic consequences; for management oriented research; seed bulking; and out-planting to augment extant occurrences or establish new occurrences of Quino checkerspot.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Quino checkerspot section in the MSP Seed Collection, Banking and Bulking Plan. on hold
PRP-2 Design a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. waiting for precedent action
PRP-3 The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. waiting for precedent action
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). waiting for precedent action
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. waiting for precedent action
PRP-6 Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By end 2017, Completed Quino Checkerspot Section in MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
EUPEDI-5 MGT-IMP-SBPL In 2018, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot to collect and store seeds to provide propagules as needed for management oriented research, existing population enhancement and establishment of new butterfly occurrences.
EUPEDI-6 MGT-PRP-MGTPL In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
regional NFO 2018, 2019, 2020, 2021 SL
MGT-IMP-SBPL EUPEDI-5

Management units: 3, 4, 6, 9

In 2018, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot to collect and store seeds to provide propagules as needed for management oriented research, existing population enhancement and establishment of new butterfly occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for butterfly habitat enhancement, expansion, and restoration projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. waiting for precedent action
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2021, =1 Highest Priority Action Implemented for Quino checkerspot from the MSP Seed Collection, Banking, and Bulking Plan 2021
Code Obj. code Statement
EUPEDI-4 MGT-PRP-SBPL In 2017-2018, develop a section for Quino checkerpot nectaring forbs and host plants in the MSP Seed Collection, Banking and Bulking Plan to enhance and restore habitat for the butterfly. The plan should incorporate best science and management practices (e.g., Wall 2009; KEW 2016) to provide guidelines for collecting and providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds to provide source material with consideration of potential genetic consequences; for management oriented research; seed bulking; and out-planting to augment extant occurrences or establish new occurrences of Quino checkerspot.
EUPEDI-6 MGT-PRP-MGTPL In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
regional NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-PRP-MGTPL EUPEDI-6

Management units: 3, 4, 6, 9

In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.

Action Statement Action status Projects
PRP-1 Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop prioritized management actions. waiting for precedent action
PRP-2 Include fire risk and climate change modeling results to provide management recommendations in relation to fire and climate refugia and to reduce fire risk at occurrences. waiting for precedent action
PRP-3 Submit project metadata and management and monitoring plan to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Quino Checkerspot Management and Monitoring Plan Completed in 2021 2021
Code Obj. code Statement
EUPEDI-1 MON-DEV-MODL In 2017-2019, develop habitat suitability models for Quino checkerspot, host plants, and nectaring plants under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans.
EUPEDI-1 MON-DEV-MODL In 2017-2018, develop habitat suitability models for Quino checkerspot, host plants, and nectaring plants under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans.
EUPEDI-4 MGT-PRP-SBPL In 2017-2018, develop a section for Quino checkerpot nectaring forbs and host plants in the MSP Seed Collection, Banking and Bulking Plan to enhance and restore habitat for the butterfly. The plan should incorporate best science and management practices (e.g., Wall 2009; KEW 2016) to provide guidelines for collecting and providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds to provide source material with consideration of potential genetic consequences; for management oriented research; seed bulking; and out-planting to augment extant occurrences or establish new occurrences of Quino checkerspot.
EUPEDI-9 MGT-IMP-CAPR From 2017 to 2021, support existing efforts by the wildlife agencies to collect eggs and captive rear larvae to use in reestablishing and augmenting wild Quino checkerspot populations. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
regional and/or local NFO 2018, 2019, 2020, 2021 SL
MGT-IMP-MGTPL EUPEDI-7

Management units: 3, 4, 6, 9

Beginning in 2018, implement highest priority management actions for Quino checkerspot on Conserved Lands.

Action Statement Action status Projects
IMP-1 Management actions to be determined by the Quino Checkerspot Management Plan. waiting for precedent action Quino Habitat Restoration
IMP-2 Submit project metadata and management data to MSP web portal waiting for precedent action Quino Habitat Restoration
Criteria Deadline year
=1 Management actions implemented for Quino checkerspot by 2021 2021
Code Obj. code Statement
EUPEDI-6 MGT-PRP-MGTPL In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
regional and/or local NFO 2018, 2019, 2020, 2021 SL
MON-IMP-MGTPL EUPEDI-8

Management units: 3, 4, 6, 9

From 2018 to 2021, monitor the effectiveness of management actions implemented for Quino checkerspot on Conserved Lands

Action Statement Action status Projects
IMP-1 Submit metadata, monitoring data and reports to MSP web portal waiting for precedent action
Criteria Deadline year
Effectiveness Monitoring Completed within 1 Year of Management Actions 2021
Code Obj. code Statement
EUPEDI-7 MGT-IMP-MGTPL Beginning in 2018, implement highest priority management actions for Quino checkerspot on Conserved Lands.
regional NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-CAPR EUPEDI-9

Management units: 3, 4, 6, 9

From 2017 to 2021, support existing efforts by the wildlife agencies to collect eggs and captive rear larvae to use in reestablishing and augmenting wild Quino checkerspot populations. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.

Action Statement Action status Projects
IMP-1 Support the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers, San Diego Zoo Global and other stakeholders to implement the captive rearing. in progress
IMP-2 Submit project metadata and management data to MSP web portal. in progress
Criteria Deadline year
Captive Rearing Implemented and Report Submitted by 2021 2021
Code Obj. code Statement
EUPEDI-6 MGT-PRP-MGTPL In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
EUPEDI-10 MGT-IMP-TRAN From 2017 to 2021, support existing efforts by the wildlife agenices to translocate captive bred Quino checkerspot larvae to historically occupied habitat.
EUPEDI-11 MON-IMP-TRAN From 2017 to 2021, support efforts by the wildlife agencies to monitor the effectivenss of translocated captive bred Quinoo checkerspot larvae. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
regional NFO 2017, 2018, 2019, 2020, 2021 SL
MGT-IMP-TRAN EUPEDI-10

Management units: 3, 4, 6, 9

From 2017 to 2021, support existing efforts by the wildlife agenices to translocate captive bred Quino checkerspot larvae to historically occupied habitat.

Action Statement Action status Projects
IMP-1 Support the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers, San Diego Zoo Global and other stakeholders to implement the translocation project. in progress
IMP-1 Support the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers, San Diego Zoo Global and other stakeholders to implement the translocation project. in progress
IMP-2 Submit project metadata and management data to MSP web portal. in progress
Criteria Deadline year
Translocation Implemented by 2020 2021
Code Obj. code Statement
EUPEDI-6 MGT-PRP-MGTPL In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
EUPEDI-9 MGT-IMP-CAPR From 2017 to 2021, support existing efforts by the wildlife agencies to collect eggs and captive rear larvae to use in reestablishing and augmenting wild Quino checkerspot populations. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
EUPEDI-11 MON-IMP-TRAN From 2017 to 2021, support efforts by the wildlife agencies to monitor the effectivenss of translocated captive bred Quinoo checkerspot larvae. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
regional NFO 2017, 2018, 2019, 2020, 2021 SL
MON-IMP-TRAN EUPEDI-11

Management units: 3, 4, 6, 9

From 2017 to 2021, support efforts by the wildlife agencies to monitor the effectivenss of translocated captive bred Quinoo checkerspot larvae. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, monitoring data and reportto MSP web portal in progress
Criteria Deadline year
Translocation Monitoring Completed and Report Submitted by 2021 2021
Code Obj. code Statement
EUPEDI-9 MGT-IMP-CAPR From 2017 to 2021, support existing efforts by the wildlife agencies to collect eggs and captive rear larvae to use in reestablishing and augmenting wild Quino checkerspot populations. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
EUPEDI-10 MGT-IMP-TRAN From 2017 to 2021, support existing efforts by the wildlife agenices to translocate captive bred Quino checkerspot larvae to historically occupied habitat.

regional NFO 2017, 2020 SL
MON-SURV-SPEC EYPHAR-1

Management units: 3, 4, 5, 6, 8, 11

In 2017 and 2020, conduct host plant (San Diego sedge), adult, larval and hibernaculum surveys, and habitat assessments for Harbison's dun skipper that were initiated in 2013 in the MSPA (see Table of Occurrences) to further document the butterfly's current distribution and population size, define habitat requirements, and to assess habitat and threats at survey sites.

Action Statement Action status Projects
SURV-1 Search for Harvison's dun skipper adults, butterfly hiberniculum, larvae and host plants (San Diego sedge) at known occupied habitat, historically occupied habitat and in suitable potential habitat, to determine the extent of the butterfly's range, population sizes, and to better understand habitat relationships. Use a standardized protocol to collect habitat and threats covariate data at each site for developing and prioritizing management actions. In progress
SURV-2 Submit project metadata, datasets, analyses and report with management recommendations to the MSP Web Portal. In progress
Criteria Deadline year
Harbison's Dun Skipper Surveys and Reports Completed in 2018 and 2021 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Altered hydrologyALTHYD
Climate changeCLICHN
Invasive animalsINVANI
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
EYPHAR-2 MON-RES-GEN In 2017, in conjunction with adult surveys and the marking study for Harbison's dun skipper (see Table of Occurrences), capture adult butterflies and collect non-lethal genetic samples (i.e., legs) to analyze population genetic structure, dispersal and connectivity between populations, and genetic diversity. Use the analytical results to develop management recommendations to improve connectivity and to maintain or enhance genetic diversity at Harbison's dun skipper occurrences.
EYPHAR-3 MON-RES-SPEC In 2017, conduct a marking study of adult Harbison's dun skippers during the flight season to determine connectivity within habitat patches in a watershed. Design the study to obtain information on local movement patterns, flight season phenology, demography, detection probabilities, longevity, individual behavior, nectaring sources, and relationship between maximum counts and local population size. The results of this study should be used to develop specific management recommendations to be incorporated in the Harbison's Dun Skipper Management Plan.
EYPHAR-4 MON-DEV-MODL In 2017, develop habitat suitability models for Harbison's dun skipper, the host plant (San Diego sedge), and oak woodlands under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential fire and climate refugia. The results of this modeling will be considered in the development of monitoring and management plans.
EYPHAR-5 MGT-PRP-MGTPL In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.
regional PRE 2017 SL
MON-DEV-MODL EYPHAR-4

Management units: 3, 4, 5, 6, 8, 11

In 2017, develop habitat suitability models for Harbison's dun skipper, the host plant (San Diego sedge), and oak woodlands under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential fire and climate refugia. The results of this modeling will be considered in the development of monitoring and management plans.

Action Statement Action status Projects
DEV-1 Submit project metadata, modeling datasets, results and report to the MSP Web Portal. In progress
Criteria Deadline year
Harbison's Dun Skipper Current and Future Climate Habitat Models and Report Completed in 2017 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive animalsINVANI
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
EYPHAR-5 MGT-PRP-MGTPL In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.
EYPHAR-8 MGT-IMP-IGNPL Beginning in 2019, implement high priority MSP 2018 Wildfire Ignition Reduction Plan measures developed for Harbison's Dun Skipper to reduce the probability of ignition at most at-risk occurrences.
regional PRE 2017 SL
MGT-PRP-MGTPL EYPHAR-5

Management units: 3, 4, 5, 6, 8, 11

In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.

Action Statement Action status Projects
PRP-1 Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop prioritized management actions. In progress
PRP-2 Submit project metadata and Harbison's Dun Skipper Management Plant to the MSP Web Portal. In progress
Criteria Deadline year
Harbison's Dun Skipper Management Plan Completed in 2017 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Altered hydrologyALTHYD
Climate changeCLICHN
Invasive animalsINVANI
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
EYPHAR-1 MON-SURV-SPEC In 2017 and 2020, conduct host plant (San Diego sedge), adult, larval and hibernaculum surveys, and habitat assessments for Harbison's dun skipper that were initiated in 2013 in the MSPA (see Table of Occurrences) to further document the butterfly's current distribution and population size, define habitat requirements, and to assess habitat and threats at survey sites.
EYPHAR-2 MON-RES-GEN In 2017, in conjunction with adult surveys and the marking study for Harbison's dun skipper (see Table of Occurrences), capture adult butterflies and collect non-lethal genetic samples (i.e., legs) to analyze population genetic structure, dispersal and connectivity between populations, and genetic diversity. Use the analytical results to develop management recommendations to improve connectivity and to maintain or enhance genetic diversity at Harbison's dun skipper occurrences.
EYPHAR-3 MON-RES-SPEC In 2017, conduct a marking study of adult Harbison's dun skippers during the flight season to determine connectivity within habitat patches in a watershed. Design the study to obtain information on local movement patterns, flight season phenology, demography, detection probabilities, longevity, individual behavior, nectaring sources, and relationship between maximum counts and local population size. The results of this study should be used to develop specific management recommendations to be incorporated in the Harbison's Dun Skipper Management Plan.
EYPHAR-4 MON-DEV-MODL In 2017, develop habitat suitability models for Harbison's dun skipper, the host plant (San Diego sedge), and oak woodlands under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential fire and climate refugia. The results of this modeling will be considered in the development of monitoring and management plans.
EYPHAR-5 MGT-PRP-MGTPL In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.
EYPHAR-6 MGT-IMP-MGTPL Beginning in 2018, implement highest priority management actions identified in the Harbison's Dun Skipper Management Plan.
EYPHAR-7 MON-IMP-MGTPL Beginning in 2018, monitor effectiveness of implementation of highest priority management actions identified in the Harbison's Dun Skipper Management Plan.
EYPHAR-8 MGT-IMP-IGNPL Beginning in 2019, implement high priority MSP 2018 Wildfire Ignition Reduction Plan measures developed for Harbison's Dun Skipper to reduce the probability of ignition at most at-risk occurrences.
EYPHAR-9 MON-IMP-FMGT For at least the first 3 years following a wildfire, monitor recovery of Harbison's dun skipper occurrences and habitat affected by fire. Use a standardized postfire protocol to document the butterfly's distribution and abundance over time and to characterize habitat recovery and threats following a wildfire. Postfire monitoring should encompass occupied dun skipper sites and unoccupied sites that are important for enhancing connectivity or for future population expansion. The postfire monitoring should identify and prioritize management actions to assist in recovery of Harbison's dun skipper populations and important habitat patches.
EYPHAR-10 MGT-IMP-FMGT For at least the first 3 years following a fire, implement management actions identified by postfire monitoring as necessary to protect and recover Harbison's dun skipper occurrences and habitat impacted by wildfire.
regional PRE 2018, 2019, 2020, 2021 SL
MGT-IMP-MGTPL EYPHAR-6

Management units: 3, 4, 5, 6, 8, 11

Beginning in 2018, implement highest priority management actions identified in the Harbison's Dun Skipper Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2022, =1 High Priority Management Action Implemented from the Harbison's Dun Skipper Management Plan 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Altered hydrologyALTHYD
Climate changeCLICHN
Invasive animalsINVANI
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
EYPHAR-5 MGT-PRP-MGTPL In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.
EYPHAR-7 MON-IMP-MGTPL Beginning in 2018, monitor effectiveness of implementation of highest priority management actions identified in the Harbison's Dun Skipper Management Plan.
regional PRE 2018, 2019, 2020, 2021 SL
MON-IMP-MGTPL EYPHAR-7

Management units: 3, 4, 5, 6, 8, 11

Beginning in 2018, monitor effectiveness of implementation of highest priority management actions identified in the Harbison's Dun Skipper Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Altered hydrologyALTHYD
Climate changeCLICHN
Invasive animalsINVANI
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
EYPHAR-5 MGT-PRP-MGTPL In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.
EYPHAR-6 MGT-IMP-MGTPL Beginning in 2018, implement highest priority management actions identified in the Harbison's Dun Skipper Management Plan.

Regional NFO 2017 SL
MGT-PRP-SBPL HAZORC-3

Management units: 6, 7

In 2017, begin preparing an Orcutt's hazardia section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2014 genetic study to provide guidance for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's hazardia section in the MSP Seed Collection, Banking and Bulking Plan. Available for implementation
PRP-2 Design the seed collection plan to include recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. Available for implementation
PRP-3 The seed collection plan should have guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. Available for implementation
PRP-4 Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). Available for implementation
PRP-5 Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. Available for implementation
PRP-6 Submit project metadata and the MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. Available for implementation
Criteria Deadline year
By 2018, Completed Orcutt's Hazardia Section in the MSP Seed Collection, Banking and Bulking Plan 2021
Code Obj. code Statement
HAZORC-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through 2016, 2018 and 2020 IMG monitoring of Orcutt's hazardia occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
HAZORC-4 MGT-IMP-SBPL In 2018, begin implementing high priority actions for Orcutt's hazardia in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
HAZORC-5 MGT-PRP-MGTPL In 2017, begin preparing an Orcutt's hazardia section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or enhance occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
HAZORC-6 MGT-IMP-MGTPL In 2018, begin implementing highest priority management actions identified for Orcutt's hazardia in the MSP Rare Plant Management Plan.
HAZORC-7 MON-IMP-MGTPL In 2018, begin monitoring effectiveness of implementation of highest priority management actions identified in the Orcutt's hazardia section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2018, 2019, 2020, 2021 SL
MGT-IMP-SBPL HAZORC-4

Management units: 6, 7

In 2018, begin implementing high priority actions for Orcutt's hazardia in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.

Action Statement Action status Projects
IMP-1 Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. waiting for precedent action
IMP-2 Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2022, =1 Highest Priority Action Implemented for Orcutt's hazardia from the MSP Seed Banking and Bulking Plan 2021
Code Obj. code Statement
HAZORC-3 MGT-PRP-SBPL In 2017, begin preparing an Orcutt's hazardia section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2014 genetic study to provide guidance for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
HAZORC-6 MGT-IMP-MGTPL In 2018, begin implementing highest priority management actions identified for Orcutt's hazardia in the MSP Rare Plant Management Plan.
regional NFO 2017 SL
MGT-PRP-MGTPL HAZORC-5

Management units: 6, 7

In 2017, begin preparing an Orcutt's hazardia section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or enhance occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence

Action Statement Action status Projects
PRP-1 Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's brodiaea section in the MSP Rare Plant Management Plan. available for implementation
PRP-2 Develop a conceptual model that identifies management actions to effectively reduce threats to Orcutt's hazardia occurrences. available for implementation
PRP-3 Prioritize occurrences for management based upon an assessment of occurrence status, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. available for implementation
PRP-4 Develop an implementation plan for Orcutt's hazardia that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. available for implementation
PRP-5 Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. available for implementation
Criteria Deadline year
By 2018, Completed Orcutt's Hazardia Section in MSP Rare Plant Management Plan 2021
Code Obj. code Statement
HAZORC-1 MON-IMP-IMG In 2018, inspect Orcutt's hazardia occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2018, repeat monitoring every 2 years.
HAZORC-2 MGT-IMP-IMG Beginning in 2017, conduct routine management actions identified through 2016, 2018 and 2020 IMG monitoring of Orcutt's hazardia occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
HAZORC-3 MGT-PRP-SBPL In 2017, begin preparing an Orcutt's hazardia section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2014 genetic study to provide guidance for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
HAZORC-4 MGT-IMP-SBPL In 2018, begin implementing high priority actions for Orcutt's hazardia in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
HAZORC-6 MGT-IMP-MGTPL In 2018, begin implementing highest priority management actions identified for Orcutt's hazardia in the MSP Rare Plant Management Plan.
HAZORC-7 MON-IMP-MGTPL In 2018, begin monitoring effectiveness of implementation of highest priority management actions identified in the Orcutt's hazardia section in the MSP Rare Plant Management Plan.
Regional and/or Local NFO 2018, 2019, 2020, 2021 SL
MGT-IMP-MGTPL HAZORC-6

Management units: 6, 7

In 2018, begin implementing highest priority management actions identified for Orcutt's hazardia in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management datasets, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
By 2022, =1 High Priority Management Action Implemented for Orcutt's Brodiaea from the MSP Rare Plant Management Plan 2021
Code Obj. code Statement
HAZORC-5 MGT-PRP-MGTPL In 2017, begin preparing an Orcutt's hazardia section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or enhance occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
HAZORC-7 MON-IMP-MGTPL In 2018, begin monitoring effectiveness of implementation of highest priority management actions identified in the Orcutt's hazardia section in the MSP Rare Plant Management Plan.
regional and/or local NFO 2018, 2019, 2020, 2021 SL
MON-IMP-MGTPL HAZORC-7

Management units: 6, 7

In 2018, begin monitoring effectiveness of implementation of highest priority management actions identified in the Orcutt's hazardia section in the MSP Rare Plant Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined 2021
Code Obj. code Statement
HAZORC-5 MGT-PRP-MGTPL In 2017, begin preparing an Orcutt's hazardia section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or enhance occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
HAZORC-6 MGT-IMP-MGTPL In 2018, begin implementing highest priority management actions identified for Orcutt's hazardia in the MSP Rare Plant Management Plan.

regional POST 2017, 2018, 2019 SL
MON-SURV-SPEC LYCHER-1

Management units: 2, 3, 4, 6, 10, 11

In 2017-2019, continue surveys for adult Hermes copper (see occurrence table) and habitat assessments begun in 2016 to document the butterfly's current distribution and abundance and to assess habitat and threats at survey sites. Prepare site-specific management recommendations based on survey results and habitat assessments.

Action Statement Action status Projects
SURV-1 Search for adult Hermes copper butterflies and host plants (spiny redbery) at known occupied habitat, historically occupied habitat, habitat recovering from wildfire, and suitable habitat with potential to support the butterfly to determine the extent of the range, population sizes, and to better understand habitat relationships. Use a standardized protocol to collect habitat and threats covariate data at each site for developing and prioritizing management actions. in progress
SURV-2 Submit project metadata, datasets, analyses and report with management recommendations to the MSP Web Portal. in progress
Criteria Deadline year
Hermes Copper Surveys and Reports Completed in 2017 and 2018 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
LYCHER-3 MON-IMP-TRAN From 2017 to 2021, continue monitoring the effectiveness of Hermes Copper translocation experiments begun in 2014 at Hollenbeck Canyon Wildlife Area (see Table of Occurrences). Extend the monitoring for 2 years after the last egg is translocated to determine whether a population has been established.
LYCHER-6 MGT-PRP-MGTPL In 2017, complete a 5 year Hermes Copper Management Plan that includes the results from butterfly surveys and habitat assessments and genetic, marking and translocation studies to develop a management strategy and to identify and prioritize site specific management actions. The plan should employ the modeling results to identify potential fire and climate refugia that may be suitable sites for future translocations and provide specific recommendations for reducing fire risk at occurrences at highest risk.
LYCHER-9 MON-PRP-MONPL In 2018, develop a monitoring plan to track long term distribution, abundance, and phenology, and to assess habitats and threats at Hermes copper occurrences (see Table of Occurrences), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to develop specific questions, monitoring methods, a statistically valid sampling design, sampling locations, and standardized protocols for determining the status and abundance of the butterfly and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations.
regional PRE 2017 SL
MON-DEV-MODL LYCHER-5

Management units: 2, 3, 4, 6, 10, 11

In 2017, develop habitat suitability models for Hermes copper and the host plant (spiny redberry), and the primary nectaring plant (California buckwheat) under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans for this butterfly.

Action Statement Action status Projects
DEV-1 Submit project metadata, modeling datasets, results and report to the MSP Web Portal. In progress
Criteria Deadline year
Hermes Copper Current and Future Climate Habitat Models and Report Completed in 2017 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Urban developmentURBDEV
Code Obj. code Statement
LYCHER-6 MGT-PRP-MGTPL In 2017, complete a 5 year Hermes Copper Management Plan that includes the results from butterfly surveys and habitat assessments and genetic, marking and translocation studies to develop a management strategy and to identify and prioritize site specific management actions. The plan should employ the modeling results to identify potential fire and climate refugia that may be suitable sites for future translocations and provide specific recommendations for reducing fire risk at occurrences at highest risk.
LYCHER-9 MON-PRP-MONPL In 2018, develop a monitoring plan to track long term distribution, abundance, and phenology, and to assess habitats and threats at Hermes copper occurrences (see Table of Occurrences), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to develop specific questions, monitoring methods, a statistically valid sampling design, sampling locations, and standardized protocols for determining the status and abundance of the butterfly and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations.
regional PRE 2017 SL
MGT-PRP-MGTPL LYCHER-6

Management units: 2, 3, 4, 6, 10, 11

In 2017, complete a 5 year Hermes Copper Management Plan that includes the results from butterfly surveys and habitat assessments and genetic, marking and translocation studies to develop a management strategy and to identify and prioritize site specific management actions. The plan should employ the modeling results to identify potential fire and climate refugia that may be suitable sites for future translocations and provide specific recommendations for reducing fire risk at occurrences at highest risk.

Action Statement Action status Projects
PRP-1 Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop prioritized management actions. completed
PRP-2 Include fire risk and climate change modeling results to provide management recommendations in relation to fire and climate refugia and to reduce fire risk at occurrences. completed
PRP-3 Submit project metadata and Herme's Copper Management Plant to the MSP Web Portal. completed
Criteria Deadline year
Hermes Copper Management Plan Completed in 2017 2021
Code Obj. code Statement
LYCHER-1 MON-SURV-SPEC In 2017-2019, continue surveys for adult Hermes copper (see occurrence table) and habitat assessments begun in 2016 to document the butterfly's current distribution and abundance and to assess habitat and threats at survey sites. Prepare site-specific management recommendations based on survey results and habitat assessments.
LYCHER-3 MON-IMP-TRAN From 2017 to 2021, continue monitoring the effectiveness of Hermes Copper translocation experiments begun in 2014 at Hollenbeck Canyon Wildlife Area (see Table of Occurrences). Extend the monitoring for 2 years after the last egg is translocated to determine whether a population has been established.
LYCHER-4 MGT-DEV-BMP In 2017, continue development of BMPs begun in 2013 for captive rearing Hermes Copper at the San Diego Zoo. Attempt to determine optimal conditions for rearing Hermes copper in captivity to provide a source of butterflies for translocations to re-establish populations at sites where the butterfly has been extirpated or to establish new populations in suitable habitat.
LYCHER-5 MON-DEV-MODL In 2017, develop habitat suitability models for Hermes copper and the host plant (spiny redberry), and the primary nectaring plant (California buckwheat) under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans for this butterfly.
LYCHER-7 MGT-IMP-MGTPL In 2018, begin implementing high priority management actions from the Hermes Copper Management Plan.
LYCHER-7 MGT-IMP-MGTPL In 2018, begin implementing high priority management actions from the Hermes Copper Management Plan.
LYCHER-13 MGT-IMP-FMGT For at least the first 3 years following a fire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality habitat to allow for recovery of Hermes copper occurrences impacted by wildfire.
regional PRE 2018, 2019, 2020, 2021 SL
MGT-IMP-MGTPL LYCHER-7

Management units: 2, 3, 4, 6, 10, 11

In 2018, begin implementing high priority management actions from the Hermes Copper Management Plan.

Action Statement Action status Projects
IMP-1 Submit project metadata, management datasets, and report to the MSP Web Portal. available for implementation
Criteria Deadline year
By 2021, =1 High Priority Management Action Implemented from the Hermes Copper Management Plan 2021
Code Obj. code Statement
LYCHER-2 MGT-IMP-TRAN From 2017 to 2019, continue Hermes Copper translocation experiments begun in 2014 to test the effectiveness of releasing eggs and larvae to repopulate the Hollenbeck Canyon Wildlife Area (see Table of Occurrences) where the original population was extirpated by fire.
LYCHER-3 MON-IMP-TRAN From 2017 to 2021, continue monitoring the effectiveness of Hermes Copper translocation experiments begun in 2014 at Hollenbeck Canyon Wildlife Area (see Table of Occurrences). Extend the monitoring for 2 years after the last egg is translocated to determine whether a population has been established.
LYCHER-6 MGT-PRP-MGTPL In 2017, complete a 5 year Hermes Copper Management Plan that includes the results from butterfly surveys and habitat assessments and genetic, marking and translocation studies to develop a management strategy and to identify and prioritize site specific management actions. The plan should employ the modeling results to identify potential fire and climate refugia that may be suitable sites for future translocations and provide specific recommendations for reducing fire risk at occurrences at highest risk.
LYCHER-8 MON-IMP-MGTPL Beginning in 2018, monitor effectiveness of implementation of highest priority management actions identified in the Hermes Copper Management Plan.
LYCHER-13 MGT-IMP-FMGT For at least the first 3 years following a fire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality habitat to allow for recovery of Hermes copper occurrences impacted by wildfire.
regional PRE 2018, 2019, 2020, 2021 SL
MON-IMP-MGTPL LYCHER-8

Management units: 2, 3, 4, 6, 10, 11

Beginning in 2018, monitor effectiveness of implementation of highest priority management actions identified in the Hermes Copper Management Plan.

Action Statement Action status Projects
IMP-1 Submit metadata, management effectiveness datasets, analyses, and report to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Effectiveness of High Priority Management Actions Determined and Report Completed 2021
Code Obj. code Statement
LYCHER-6 MGT-PRP-MGTPL In 2017, complete a 5 year Hermes Copper Management Plan that includes the results from butterfly surveys and habitat assessments and genetic, marking and translocation studies to develop a management strategy and to identify and prioritize site specific management actions. The plan should employ the modeling results to identify potential fire and climate refugia that may be suitable sites for future translocations and provide specific recommendations for reducing fire risk at occurrences at highest risk.
LYCHER-7 MGT-IMP-MGTPL In 2018, begin implementing high priority management actions from the Hermes Copper Management Plan.
LYCHER-7 MGT-IMP-MGTPL In 2018, begin implementing high priority management actions from the Hermes Copper Management Plan.
LYCHER-9 MON-PRP-MONPL In 2018, develop a monitoring plan to track long term distribution, abundance, and phenology, and to assess habitats and threats at Hermes copper occurrences (see Table of Occurrences), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to develop specific questions, monitoring methods, a statistically valid sampling design, sampling locations, and standardized protocols for determining the status and abundance of the butterfly and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations.
LYCHER-10 MON-IMP-MONPL In 2020, begin implementing long term Hermes copper monitoring as specified in the Hermes Copper Monitoring Plan. Prepare a report detailing butterfly and habitat assessment results and with site specific management recommendations.
LYCHER-12 MON-IMP-FMGT For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of Hermes copper occurrences impacted by fire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing Hermes copper habitat recovery following a fire. Postfire monitoring should include collecting habitat recovery data at unoccupied sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover Hermes copper populations and important habitat patches.
regional NFO 2018 SL
MON-PRP-MONPL LYCHER-9

Management units: 2, 3, 4, 6, 10, 11

In 2018, develop a monitoring plan to track long term distribution, abundance, and phenology, and to assess habitats and threats at Hermes copper occurrences (see Table of Occurrences), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to develop specific questions, monitoring methods, a statistically valid sampling design, sampling locations, and standardized protocols for determining the status and abundance of the butterfly and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations.

Action Statement Action status Projects
PRP-1 Incorporate previously tested survey methods into development of a Hermes copper monitoring protocol and habitat assessment.The sampling frame should include the current and historic range of the butterfly on Conserved Lands and any unoccupied suitable habitat modeled as climate or fire refugia. Include a subset of sites in north and south San Diego County classified as sentinel sites and monitored every survey year to characterize the conditions and phenology for the butterfly in that year. The remainder of sites should be included in a rotating panel to be surveyed in alternative years. waiting for precedent action
PRP-2 Submit project metadata and Hermes Copper Monitoring Plan to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Hermes Copper Monitoring Plan Completed in 2018 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
LYCHER-1 MON-SURV-SPEC In 2017-2019, continue surveys for adult Hermes copper (see occurrence table) and habitat assessments begun in 2016 to document the butterfly's current distribution and abundance and to assess habitat and threats at survey sites. Prepare site-specific management recommendations based on survey results and habitat assessments.
LYCHER-3 MON-IMP-TRAN From 2017 to 2021, continue monitoring the effectiveness of Hermes Copper translocation experiments begun in 2014 at Hollenbeck Canyon Wildlife Area (see Table of Occurrences). Extend the monitoring for 2 years after the last egg is translocated to determine whether a population has been established.
LYCHER-5 MON-DEV-MODL In 2017, develop habitat suitability models for Hermes copper and the host plant (spiny redberry), and the primary nectaring plant (California buckwheat) under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans for this butterfly.
LYCHER-8 MON-IMP-MGTPL Beginning in 2018, monitor effectiveness of implementation of highest priority management actions identified in the Hermes Copper Management Plan.
LYCHER-10 MON-IMP-MONPL In 2020, begin implementing long term Hermes copper monitoring as specified in the Hermes Copper Monitoring Plan. Prepare a report detailing butterfly and habitat assessment results and with site specific management recommendations.
LYCHER-12 MON-IMP-FMGT For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of Hermes copper occurrences impacted by fire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing Hermes copper habitat recovery following a fire. Postfire monitoring should include collecting habitat recovery data at unoccupied sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover Hermes copper populations and important habitat patches.
regional NFO 2020, 2021 SL
MON-IMP-MONPL LYCHER-10

Management units: 2, 3, 4, 6, 10, 11

In 2020, begin implementing long term Hermes copper monitoring as specified in the Hermes Copper Monitoring Plan. Prepare a report detailing butterfly and habitat assessment results and with site specific management recommendations.

Action Statement Action status Projects
IMP-1 Submit project metadata, datasets, analyses and monitoring report with management recommendations to the MSP Web Portal. waiting for precedent action
Criteria Deadline year
Hermes Copper Monitoring and Report Completed Each Survey Year 2021
Threat Name Threat Code
Altered fire regimeALTFIR
Climate changeCLICHN
Invasive plantsINVPLA
Urban developmentURBDEV
Code Obj. code Statement
LYCHER-9 MON-PRP-MONPL In 2018, develop a monitoring plan to track long term distribution, abundance, and phenology, and to assess habitats and threats at Hermes copper occurrences (see Table of Occurrences), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to develop specific questions, monitoring methods, a statistically valid sampling design, sampling locations, and standardized protocols for determining the status and abundance of the butterfly and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations.
LYCHER-12 MON-IMP-FMGT For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of Hermes copper occurrences impacted by fire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing Hermes copper habitat recovery following a fire. Postfire monitoring should include collecting habitat recovery data at unoccupied sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover Hermes copper populations and important habitat patches.

Regional NFO 2020 SL
MGT-PRP-SBPL MONVIM-5

Management units: 4, 6

In 2020, begin preparing a section for willowy monardella in the MSP Seed Collection, Banking and Bulking Plan that incorporates best science and management practices (Wall 2009, KEW 2016) to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should also include recommendations from the 2016-2017 genetic study and the 2019 baseline surveys and hydrological evaluation to guide collection and storage of seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.