Type: report
Article abstract: The purpose of this task was to conduct a preliminary hydrology and hydraulic study and to develop conceptual erosion control alternatives to address the erosion problem in the upper reach of the main creek (referred to as the Project Reach) within the Manchester Avenue Conservation Bank.
Number of pages: 30
Month: March
Year: 2007
Notes: Final Report for TransNet / SANDAG 2006 Manchester Mitigation Bank Land Management Grant (#5000665)
Prepared for: Center for Natural Lands Management;
Prepared by: HDR Engineering, Inc.;
Keywords: hydrology; mitigation;
Threats: Altered hydrology