Tracker results - long format
San Diego thorn-mint Acanthomintha ilicifolia
Goal: Maintain large populations, enhance small populations, and establish new populations of San Diego thornmint or pollinator habitat to buffer against environmental stochasticity, maintain genetic diversity, and promote connectivity, thereby enhancing resilience within and among MUs over the long-term (>100 years) in native habitats.
regional and/or local
PRE
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-FMGT ACAILI-1
Management units: 3, 4, 5, 6
Starting in 2017, reduce the potential impact of fire for at risk large populations of San Diego thornmint (see occurrence table) by reducing fuel loads of invasive annuals
Action |
Statement |
Action status |
Projects |
IMP-1 |
Manage thatch and invasive annuals every 3-5 years to reduce fire threat for populations of San Diego thornmint most at risk of fire (populations with ignition probability or fire frequency > 3 or that have burned since 2003) |
available for implementation |
|
IMP-2 |
Submit project metadata, monitoring datasets and report with management actions to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Fuel Loads and Invasive Grasses Reduced for at Risk Populations |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG ACAILI-2
Management units: 3, 4, 5, 6
Beginning in 2017, annually inspect conserved populations of San Diego thornmint (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, occurrence status, habitat and threats data, and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG ACAILI-3
Management units: 3, 4, 5, 6
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at San Diego thornmint occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities as needed, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to =20% absolute cover. |
available for implementation |
San Diego Thornmint Restoration |
IMP-2 |
Submit project metadata and management data to MSP web portal. |
available for implementation |
San Diego Thornmint Restoration |
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SO
MGT-DEV-BMP ACAILI-4
Management units: 3, 4, 5, 6
In 2017, continue refining BMPs developed for San Diego thornmint (CBI 2014) by incorporating results of management experiments to control invasive species that threaten populations (e.g., Brachypodium removal studies at Mission Trails and South Crest) and based on research studies (e.g., seed bulking guidelines, seed transfer zones).
Action |
Statement |
Action status |
Projects |
DEV-1 |
Refine BMPs prepared by CBI in the San Diego Thornmint Adaptive Management Framework (2014) by incorporating results of management experiments to control invasive species that threaten populations (e.g., Brachypodium removal and South County Grasslands projects) and based on research studies (e.g., seed bulking guidelines, seed transfer) |
In progress |
|
DEV-2 |
Submit project metadata, management datasets and BMP report to MSP web portal. |
In progress |
|
Criteria |
Deadline year |
BMPs for San Diego Thornmint Prepared by 2018 |
2021 |
regional
NFO
2017
SO
MON-RES-GEN ACAILI-5
Management units: 3, 4, 5, 6
In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for San Diego thornmint occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use BMPs to collect plant material for genetic samples at San Diego thornmint occurrences on Conserved lands in the MSPA. |
in progress |
|
RES-2 |
Evaluate the overall long-term genetic trajectory for San Diego thornmint. |
in progress |
|
RES-3 |
Hold a workshop of scientists, rare plant experts, and land managers to develop management recommendations based upon the results of genetic analyses. |
in progress |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
in progress |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
By 2017, Completed Genetic Study for San Diego Thornmint |
2021 |
Regional
NFO
2017
SO
MON-RES-SPEC ACAILI-11
Management units: 3, 4, 5, 6
In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for San Diego thornmint and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
Criteria |
Deadline year |
Refined Models and Prioritized Future Survey Locations for San Diego Thornmint by 2018 |
2021 |
Nuttall's acmispon Acmispon prostratus
Goal: Maintain or enhance existing Nuttall's acmispon occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in coastal bluff and coastal dune habitats.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG ACMPRO-1
Management units: 1, 7
From 2017-2012, inspect extant Nuttall's acmispon occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG ACMPRO-2
Management units: 1, 7
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Nuttall's acmispon occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
regional and/or local
NFO
2017, 2018, 2019
SO
MGT-IMP-IEX ACMPRO-3
Management units: 1
From 2017 through 2019, enhance and expand the 4 Nuttall's acmispon occurrences at Mariner's Point, South Shores, South Carlsbad State Beach and Cardiff State Beaches (see occurrence table) and establish a new occurrence at Stony Point in Mission Bay. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct invasive plant control within each occurrence |
in progress |
|
IMP-2 |
Seed collection, bulking and redistribution should follow recommendations for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan to minimize potential risks to populations from seed collection and distribution activities. |
in progress |
|
IMP-3 |
Submit project metadata and management data to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
By 2019, 5 Nuttall's Acmispon Occurrences Enhanced/Established and Reports Submitted |
2021 |
Regional
NFO
2017
SO
MGT-PRP-SBPL ACMPRO-4
Management units: 1, 7
In 2017, begin preparing a section for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (e.g., Wall 2009, KEW 2016) and provide guidelines for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for Nuttall's acmispon in the MSP Seed Collection, Banking and Bulking Plan. |
Available for implementation |
|
PRP-2 |
Prepare a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. |
Available for implementation |
|
PRP-3 |
The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. |
Available for implementation |
|
PRP-4 |
Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). |
Available for implementation |
|
PRP-5 |
Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. |
Available for implementation |
|
PRP-6 |
Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to the MSP Web Portal. |
Available for implementation |
|
Criteria |
Deadline year |
By 2018, Completed Nuttall's Acmispon Section in the MSP Seed Collection, Banking and Bulking Plan |
2021 |
regional
NFO
2017
SO
MGT-PRP-MGTPL ACMPRO-6
Management units: 1, 7
In 2017, begin preparing a section for Nuttall's acmispon in the MSP Rare Plant Management Plan that prioritizes management actions to maintain the 5 large occurrences and to enhance at least 3 small occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than or equal to 20% absolute cover within the occurrence.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for Nuttall's acmispon in the MSP Rare Plant Management Plan. |
available for implementation |
|
PRP-2 |
Develop a conceptual model that identifies management actions to effectively reduce threats to Nuttall's acmispon occurrences. |
available for implementation |
|
PRP-3 |
Prioritize occurrences for management based upon an assessment of occurrence size, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. |
available for implementation |
|
PRP-4 |
Develop an implementation plan for Nuttall's acmispon that prioritizes management actions for the nex 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. |
available for implementation |
|
PRP-5 |
Submit project metadata, project datasets, and the MSP Rare Plant Management Plan to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
By 2018, Completed Nuttall's Acmispon Section in the MSP Rare Plant Management Plan |
2021 |
Shaw's agave Agave shawii var shawii
Goal: Maintain existing Shaw's agave occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity and improve chances of persistence over the long term (>100 years) in coastal bluff, coastal sage scrub, and Torrey pine forest vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG AGASHA-2
Management units: 1, 6, 7
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring conducted in 2016 and 2021 at Shaw's agave occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Tricolored blackbird Agelaius tricolor
Goal: Protect, enhance, and restore Tricolored blackbird occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
NFO
2017, 2018
SL
MGT-IMP-IEX AGETRI-1
Management units: 3, 4, 5, 6, 9, 10, 11
From 2017-2018, support the existing efforts to restore the El Monte ponds and any other on-going habitat restoration projects for the benefit of nesting tricolored blackbird. This objective to be incorporated into the Tricolored Blackbird Management Plan after 2018.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, data, and annual reports documenting project methods and results to the MSP Web Portal. |
Available for implementation |
|
Criteria |
Deadline year |
Restoration of El Monte ponds implemented for Tricolored Blackbird |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-RSUP-SPEC AGETRI-2
Management units: 3, 4, 5, 6, 9, 10, 11
From 2017 to 2021, support statewide survey efforts for Tricolored blackbird held every 3 years.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Submit monitoring data and management recommendations to MSP web portal |
available for implementation |
|
Criteria |
Deadline year |
Participate in Surveys every 3 Years |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG AGETRI-3
Management units: 3, 4, 5, 6, 9, 10, 11
Beginning in 2017, annually inspect suitable nesting habitat at current and historically occupied sites (see occurrence table) to determine management needs (including need for additional water) taking care not to disturb nesting tricolored blackbirds, and use a regional IMG monitoring protocol to collect covariate data on human activities and other threats to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol surveys to determine management needs (including need for additonal water) taking care not to disturb nesting tricolored blackbirds, |
available for implementation |
Tricolored Blackbird (Agelaius tricolor) Surveys |
IMP-2 |
Based upon threat evaluation, determine if routine management or more intensive management is warranted. |
available for implementation |
|
IMP-3 |
Submit monitoring data and management recommendations to MSP web portal |
available for implementation |
Tricolored Blackbird (Agelaius tricolor) Surveys |
Criteria |
Deadline year |
Annual IMG monitoring of Tricolored Blackbird completed |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG AGETRI-4
Management units: 3, 4, 5, 6, 9, 10, 11
Beginning in 2017, conduct routine management actions identified through the IMG regional protocol monitoring.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement and adding additonal water to ponded sites. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP web portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Altered fire regime
Goal: The fire management goal for the MSPA is to maintain the long-term ecological integrity and viability of ecosystems, MSP species, and vegetation communities on Conserved Lands in a cost effective manner by managing the current human altered fire regime to promote a fire regime, with lower fire frequency and reduced impacts (direct and indirect) to natural resources.
regional and/or local
PRE
2017, 2018, 2019, 2020, 2021
MGT-RSUP-RAAM ALTFIR-3
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Beginning in 2017, with the help of a wildfire coordinator, prepare a regional Resource Avoidance Area map (RAA Map) that identifies MSP species/vegetation communities and other at-risk resources to be avoided on Conserved Lands by fire suppression activities, such as equipment staging, dozer line construction, retardant drops,and overland travel. The coordinator should work with Preserve owner managers and their responding (local, state and federal) fire agencies to develop the regional RAA Map in a compatible format with fire agencies' Wildland Fire Decision Support Systems.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
The wildfire coordinator should work with land managers to prepare brief handouts for each preserve that accompany the Resource Avoidance Areas map and provide guidance to fire crews about what type of fire suppression actions are to be avoided in specific areas and the preferred sites for staging areas. |
Available for implementation |
|
RSUP-2 |
Submit project metadata, datasets and RAA Map to MSP Web Portal. |
Available for implementation |
|
Criteria |
Deadline year |
Completed RAA Map for Region by 2021 |
2021 |
regional and/or local
PRE
2017, 2018
MGT-PRP-FMGTPL ALTFIR-7
Management units: 3, 4, 5, 6, 8, 9, 10, 11
In 2017 and 2018, identify MSP rare plant and animal species occurrences at high risk of impacts from fire, including MSP species that do not have species-specific fire recommendations to reduce threat risk prior to fire events and during fire suppression activities.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Based on IMG information and other monitoring data, prepare a map of MSP rare plant and animal occurrences at risk of post-fire invasion by non-native plants. |
Available for implementation |
|
PRP-2 |
For at-risk MSP rare plant and animal species where invasive plants pose a post-fire threat: periodically document invasive plant issues for each occurrence; identify invasive plants of concern and why they might become a risk with fire (carry fire, competition, etc); prioritize occurrences most at risk; and develop recommendations for pre-fire management actions for at-risk occurrences. |
Available for implementation |
|
PRP-3 |
Identify other fire threats from fire, such as local population extirpation from direct fire impacts, and identify fire management actions to reduce threats, such as targeted fuel management. |
Available for implementation |
|
PRP-4 |
Submit project metadata, datasets and management recommendations to MSP Web Portal |
Available for implementation |
|
Criteria |
Deadline year |
By 2019, complete mapping and identification of post-fire threats to MSP plant and animal occurrences and recommended management. |
2021 |
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
MON-IMP-FMGT ALTFIR-10
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Monitor recovery of at-risk MSP species and vegetation communities against the threat of invasive plants the first 3 years following a fire event as identified in post-fire plant and wildlife surveys.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct post fire surveys for invasive plants (Levels 1-4) at MSP plant and animal occurrences and vegetation communities starting the first spring following fire and as needed thereafter to identify priority areas for invasive plant control |
On hold |
|
IMP-2 |
Submit project metadata, datasets and postfire management recommendations to MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
Invasive plant surveys conducted 1-3 year after wildfire with management recommendations submitted |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
MGT-IMP-FMGT ALTFIR-11
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Implement invasive plant control at burned priority sites identified during pre- and post-fire surveys to prevent expansion of invasive plants at priority MSP plant and animal occurrences and vegetation communities.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct invasive plant control at priority sites with threats from non-native plants for 2-3 years post-fire or until invasive plants are controlled. |
On hold |
|
Criteria |
Deadline year |
Post-fire invasive plant control prevents expansion of nonnative plants at priority plant and animal occurrences and vegetation communities |
2021 |
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
MON-SURV-FMGT ALTFIR-12
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Conduct focused surveys for at-risk MSP plant and animal species for 1-3 years following wildfires and determine their distribution and status. Identify unburned (occupied or unoccupied) refugia within and adjacent to the fire perimeter.
Action |
Statement |
Action status |
Projects |
SURV-1 |
Submit project metadata, monitoring data and reports to MSP Web Portal |
On hold |
|
Criteria |
Deadline year |
Fire impacts and refugia documented for prioritized at-risk MSP plant and animal species following significant fires in 2017-2021 |
2021 |
Altered hydrology
Goal: Reduce the impact of urban runoff and aseasonal flow on the highest priority MSP species and riparian habitat so that species can presist over the long term (>100 years) in areas upstream and downstream of urban land uses.
regional
NFO
2017, 2018, 2019, 2020
MON-RES-STIC ALTHYD-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Continue USGS research study using STIC sensors to measure water temperature and presence in chosen stream channels. The final report should include an analysis investigating the relationship between upstream urban land uses and the number of days with water present. The data should be available in a format that will aid the creation of a hydrologic management plan.
Action |
Statement |
Action status |
Projects |
RES-1 |
Monitor STIC sites on a regular basis to capture stream data and necessary covariate data. |
In progress |
Urban Aseasonal Flow Study |
RES-2 |
Analyze data and covariates to invesigate the relationship between stream conditions and watershed land use. |
In progress |
Urban Aseasonal Flow Study |
RES-3 |
Submit project metadata and report to the MSP Web Portal. |
waiting for precedent action |
Urban Aseasonal Flow Study |
Criteria |
Deadline year |
Final report of STIC data and analysis |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-BMP ALTHYD-3
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, implement BMPs identified in the literature and approved management plans for altered hydrology to improve conditions for MSP species.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit Metadata, data, and management actions to MSP web portal. |
available for implementation |
|
San Diego ambrosia Ambrosia pumila
Goal: Maintain or enhance existing San Diego ambrosia occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG AMBPUM-1
Management units: 3, 4, 6, 8
Beginning in 2017, annually inspect San Diego ambrosia occurrences on Conserved Lands in (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG AMBPUM-2
Management units: 3, 4, 6, 8
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at San Diego ambrosia occurrences on Conserved Lands in (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement. |
available for implementation |
|
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
|
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Arroyo toad Anaxyrus californicus
Goal: Protect and enhance existing significant occurrences of arroyo toad to self-sustaining levels and re-establish occurrences in locations where they previously existed to ensure persistence over the long-term (>100 years).
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG ANACAL-1
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Annually inspect known areas occupied by arroyo toad to identify and reduce threats that can be managed at the local scale including road crossings, illegal encroachment, off-road vehicle use, non-native plants, trash dumping, grazing by livestock, and incompatible human recreation. Where possible, restrict access to arroyo toad upland and breeding habitats to help prevent disturbance to all arroyo toad life history stages (eggs, larvae, metamorphs and adults). Activities should be restricted in upland habitat year-round and in breeding habitat during the core of the breeding season (March to July).
Action |
Statement |
Action status |
Projects |
IMP-1 |
Using a regional "IMG" monitoring protocol, annually inspect significant Arroyo toad occurrences to assess status and quantify potential threats to determine management needs. AID_20161229_1831_100 |
Available for implementation |
|
IMP-2 |
Roads should be examined for high risk areas for arroyo toad crossing and use. Only slow moving vehicles (<5mph) with an occupant experienced in arroyo toad identification should be allowed on high risk roads after sunset (Zimmitti and Mahrdt 1999). |
Available for implementation |
|
IMP-3 |
An education program should be implemented that promotes the value of the arroyo toad and informs the public of restrictions and the importance of not disturbing the wildlife. |
Available for implementation |
|
IMP-4 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
Available for implementation |
|
IMP-5 |
Submit monitoring and management recommendations to the MSP web portal |
Available for implementation |
|
Criteria |
Deadline year |
Annual IMG monitoring of Arroyo toad completed |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG ANACAL-2
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Beginning in 2018, conduct routine management actions for arroyo toad identified through the IMG regional protocol monitoring, including protecting populations from detrimental human use (e.g. ORV, trampling, altered hydrology), removing invasive plants, and removing aquatic predators and exotic species (which compete and/or prey on arroyo toads, primarily young) within the known arroyo toad habitat.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from human disturbance, controlling invasive plants, and removing invasive aquatic animals. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-RES-GEN ANACAL-3
Management units: 3, 4, 5, 6, 8, 9, 10, 11
From 2017 to 2021, continue genetic studies of the arroyo toad in San Diego Co. (using genetic material collected during past and present regional surveys) to evaluate the degree of genetic variation within and between populations and to possibly identify genetic bottlenecks or barriers; this information will also be used to determine source populations to use in re-establishing arroyo toads in previously occupied areas.
Action |
Statement |
Action status |
Projects |
RES-1 |
Continue to collect genetic samples during surveys for arroyo toad for use in examining the genetic relationship of arroyo toad in western San Diego County. |
waiting for precedent action |
|
RES-2 |
Analyze the genetic samples to evaluate the degree of genetic variation within and between populations and to possibly identify genetic bottlenecks or barriers. |
waiting for precedent action |
|
RES-3 |
Prepare management recommendations based upon the genetic analyses that maintain or enhance gene flow and genetic diversity and that identifies source populations. |
waiting for precedent action |
|
RES-4 |
Submit project metadata, datasets, and Arroyo Toad Genetics Study report to the MSP Web Portal. |
Unknown |
|
Criteria |
Deadline year |
Genetic samples collected from studies completed through 2021; Genetic Analysis and Report Completed by 2021. |
2021 |
regional
NFO
2017, 2018, 2019
SO
MGT-PRP-MGTPL ANACAL-5
Management units: 3, 4, 5, 6, 8, 9, 10, 11
In 2017, continue to convene with the working group of land managers, scientists, wildlife agencies, and local biologists knowledgeable in arroyo toad to review existing conditions of known occurrences on Conserved Lands, to prepare a plan for management of arroyo toad which considers each site, and to develop a regional monitoring strategy.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Convene working group meetings to review existing conditions of known occurrences. |
in progress |
|
PRP-2 |
Use habitat models developed by USGS and results from survey and genetic analyses to identify suitable areas for long-term management. |
in progress |
|
PRP-3 |
Conduct site visits as necessary to identify appropriate management actions. |
in progress |
|
PRP-4 |
Develop an arroyo toad management plan. The plan should prioritize management actions for the next five years and detail tasks, lead entities, responsibilities, timelines, and budgets. |
in progress |
|
PRP-5 |
Submit management plan to MSP web portal |
in progress |
|
Criteria |
Deadline year |
Arroyo toad management plan completed by 2018 |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-FMGT ANACAL-11
Management units: 3, 4, 5, 6, 8, 9, 10, 11
From 2017 to 2021, implement post fire management actions to ensure the recovery of arroyo toad at occupied sites following wildfire events, including invasive plant and animal control, debris/sediment removal, erosion control or other management actions as needed following a fire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement needed management actions as determined through BAER or other post fire surveys. |
waiting for precedent action |
|
Criteria |
Deadline year |
Post fire management actions implemented following wildfire events |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-FMGT ANACAL-12
Management units: 3, 4, 5, 6, 8, 9, 10, 11
From 2017 to 2021, monitor stream conditions and the effectiveness of management actions implemented to assist in recovery of arroyo toad for 3 years following wildfire events.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Monitor stream flows and water quality post fire, document recovery of arroyo toad populations and habitat, and effectiveness of any management actions for first 3 years after fire. |
waiting for precedent action |
|
Criteria |
Deadline year |
Monitoring of post fire management actions, stream conditions, and population status for arroyo toads implemented for 3 years post fire |
2021 |
Pallid bat Antrozous pallidus
Goal: Protect pallid bat diurnal, nocturnal, and maternity roosts from destruction and human disturbance and enhance foraging habitat within commuting distance of nocturnal and maternity roosts to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long-term (>100 years).
regional
NFO
2017
SL
MON-RES-SPEC ANTPAL-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017-2018, finalize the results of research begun in 2015 on pallid bats to identify nocturnal, diurnal, and maternity roosts, foraging areas, and water sources associated with roosts in order to identify seasonal and annual changes in use and important foraging areas, and monitor reproductive status. Collect habitat covariates associated with roosting and foraging habitat, assess threats to bats at all preserves where they occur, and develop management recommendations.
Action |
Statement |
Action status |
Projects |
RES-1 |
Submit project metadata, survey data, and report with management recommendations to the MSP web portal. |
in progress |
|
Criteria |
Deadline year |
Pallid Bat Surveys and Reports Completed in 2017. |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG ANTPAL-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, inspect the vicinity of pallid bat roosts on an annual basis (see occurrence table), taking care not to disturb bats, and use a regional monitoring protocol to collect covariate data on human activities and other threats to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol surveys to quantify signs of human activity near occupied or potential roosts and to identify other potential threats. Care should be taken to avoid disturbing roosting bats. |
available for implementation |
Pallid Bat Surveys - Sweetwater Marsh |
IMP-2 |
Based upon threat evaluation, determine if routine management or more intensive management is warranted. |
available for implementation |
Pallid Bat Surveys - Sweetwater Marsh |
IMP-3 |
Submit monitoring data and management recommendations to MSP web portal |
available for implementation |
Pallid Bat Surveys - Sweetwater Marsh |
Criteria |
Deadline year |
Annual IMG monitoring of Pallid bat completed |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG ANTPAL-3
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, conduct routine management actions identified through the IMG regional protocol monitoring, including protecting occurrences from disturbance through fencing, signage, and enforcement.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP web portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Aphanisma Aphanisma blitoides
Goal: Maintain or enhance existing aphanisma occurrence(s) and establish new occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in coastal bluff, coastal dune and coastal sage scrub vegetation communities.
regional and/or local
NFO
2017, 2019, 2021
SL
MON-IMP-IMG APHBLI-1
Management units: 1, 7
Beginning in 2017, inspect extant aphanisma occurrence(s) on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years, unless an occurrence is small (<100 individuals) or faces a high degree of threat, in which case monitor annually.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Surveys Completed Every 2 Years with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG APHBLI-2
Management units: 1, 7
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at aphamisma occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species less than or equal to 20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Golden eagle Aquila chrysaetos canadensis
Goal: Expand and then maintain a self-sustaining golden eagle population to ensure long term persistence (>100 years) on Conserved Lands in the MSPA by: improving reproductive success through protection of active and inactive nest sites from human disturbance; reducing anthropogenic mortality; managing large mosaics of grassland and open shrublands for optimal prey availability, especially during drought; and by minimizing human impacts to foraging eagles.
regional
NFO
2017, 2018, 2019
SO
MON-RES-SPEC AQUCHR-1
Management units: 3, 4, 5, 6, 8, 9, 10, 11
From 2017 to 2019, continue the Golden Eagle Nesting, Foraging, and Habitat Use Study, begun in 2014, to monitor golden eagle territory occupancy and reproduction in the MSPA (see occurrence table) and to track eagle movements to identify important foraging, nesting and roosting areas. Continue to study the influence of human activity and land use on patterns of eagle movement and habitat use, measure the response of eagles to human activity while foraging, and determine whether locally produced floaters recruit into the breeding population.
Action |
Statement |
Action status |
Projects |
RES-1 |
Monitor territory occupancy and reproduction in suitable golden eagle habitat within the MSPA. Identify any threats or disturbance to eagles and provide this information to land managers so that management actions can be taken to reduce impacts from human disturbance and other threats. |
in progress |
|
RES-2 |
Capture adult eagles at selected territories and attach GPS-transmitters that track eagle movements to identify important foraging areas and to study movement patterns relative to human activity within a landscape matrix of urban, rural, and undeveloped lands. Determine whether eagles switch territories and mates, document individual mortality, and track emigration or short term movements outside of the MSPA. Determine if there are multiple nesting sites within a territory and identify nest sites that are unstable or vulnerable to loss. |
in progress |
Biotelemetry Data for Golden Eagles (Aquila chrysaetos) Captured in Coastal Southern California |
RES-3 |
Analyze golden eagle foraging habitat data and develop objectives with criteria for managing open areas (grasslands and suitable areas in coastal sage scrub and chaparral) to conditions preferred by foraging eagles and that support abundant prey (e.g., black-tailed jack rabbits, ground squirrels). |
unknown |
|
RES-4 |
Measure eagle behavioral responses to human activity at foraging areas. Identify the intensity and type of human activity that affects foraging behavior. |
in progress |
Biotelemetry Data for Golden Eagles (Aquila chrysaetos) Captured in Coastal Southern California |
RES-5 |
Use the GPS and behavioral response data to model potential impacts to foraging eagles under different scenarios of human disturbance at important foraging areas. Prepare management recommendations to reduce human impacts on foraging eagles, including alignment of trails, restriction of activities, and educational outreach. |
in progress |
Biotelemetry Data for Golden Eagles (Aquila chrysaetos) Captured in Coastal Southern California |
RES-6 |
Submit project metadata, datasets, and report with management recommendations to the MSP Web Portal. |
in progress |
Biotelemetry Data for Golden Eagles (Aquila chrysaetos) Captured in Coastal Southern California |
Criteria |
Deadline year |
Golden Eagle Nesting, Foraging, and Habitat Use Study Report with Management Recommendations Completed by 2020 |
2021 |
regional
NFO
2017, 2018, 2019
SO
MON-RES-GEN AQUCHR-2
Management units: 3, 4, 5, 6, 8, 9, 10, 11
From 2017 to 2019, continue the Golden Eagle Genetics Study begun in 2014 and collect genetic samples in conjunction with eagle captures for the Golden Eagle Nesting, Foraging, and Habitat Use Study. Analyze these samples to determine the population genetic structure of golden eagles within the MSPA (see occurrence table) and their relationship to eagle populations in other parts of the western United States.
Criteria |
Deadline year |
Golden Eagle Genetic Study with Report Completed by 2020 |
2021 |
Western burrowing owl Athene cunicularia hypugaea
Goal: Increase the abundance of nesting burrowing owls to ensure that there are multiple (=2) interbreeding self-sustaining nodes (primarily utilizing natural burrow systems) on Conserved Lands that will provide for burrowing owl persistence in the MSPA over the long-term (>100 years).
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-RES-SPEC ATHCUN-1
Management units: 3, 4, 5, 6, 9
Continue the research study of breeding burrowing owls, foraging, threats, artifiical and natural burrows, movements, and habitat assessments to inform management at existing occupied and future potential nodes. Include translocated owls in the study to determine effectiveness of translocation and to gather information to inform continued management at new nodes.
Action |
Statement |
Action status |
Projects |
RES-1 |
Submit project metadata, survey data, and report with management recommendations to the MSP web portal. |
In progress |
|
Criteria |
Deadline year |
Burrowing Owl Surveys and Reports Completed by 2021. |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-RES-GEN ATHCUN-2
Management units: 3, 4, 5, 6, 9
As part of the burrowing owl research study, collect genetic samples to determine origin of owls and genetic population structure compared to other populations in California, Mexico, and the western U.S.
Action |
Statement |
Action status |
Projects |
RES-1 |
Continue to collect genetic samples during surveys for burrowing owl for use in examining the genetic relationship of burrowing owl in California, Mexico, and the western U.S. |
waiting for precedent action |
|
RES-2 |
Analyze the genetic samples to evaluate the degree of genetic variation within and between populations and to possibly identify genetic bottlenecks or barriers. |
waiting for precedent action |
|
RES-3 |
Prepare management recommendations based upon the genetic analysis that maintain or enhance gene flow and genetic diversity and that identifies source populations. |
waiting for precedent action |
|
RES-4 |
Submit project metadata, datasets, and Burrowing Owl Genetics Study report to the MSP Web Portal. |
Unknown |
|
Criteria |
Deadline year |
Genetic samples collected from studies completed through 2021; Genetic Analysis and Report Completed by 2021. |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG ATHCUN-3
Management units: 3, 4, 5, 6, 9
Annually inspect artificial and natural burrows and occupied habitat to determine management needs using a regional IMG protocol. The monitoring should include considerations for retrofitting existing artificial burrows with the most current design to maximize fledgling success, removal/closing of burrows at poorly performing sites, and addition of burrows to maximize success.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol survey locations and habitat, assess status, and quantify potential threats. |
available for implementation |
|
IMP-2 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
available for implementation |
|
IMP-3 |
Submit monitoring and management data to the regional MSP web portal. |
available for implementation |
|
Criteria |
Deadline year |
Surveys Completed Annually with management recommendations |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG ATHCUN-4
Management units: 3, 4, 5, 6, 9
Conduct management actions identified through the IMG regional protocol monitoring, including protecting populations from disturbance, removing invasive plants, cleaning, repairing, and fortifying burrows within the known occupied and suitable habitat, retrofitting existing artificial burrows with the most current design to maximize fledgling success, removal/closing of burrows at poorly performing sites, and addition of burrows to maximize success.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform management activities such as protecting populations from disturbance, removing invasive plants, cleaning, repairing, and fortifying burrows, retrofitting existing artificial burrows with the most current design to maximize fledgling success, removal/closing of burrows at poorly performing sites, and addition of burrows to maximize success.. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
regional
NFO
2017
SL
MGT-PRP-MGTPL ATHCUN-5
Management units: 3, 4, 5, 6, 9
In 2017, finalize the Burrowing Owl Conservation and Management Plan that includes results from the research study and habitat assessments and recommendations for the establishment of at least two nodes and enhancement of existing occurrences to ensure persistence on Conserved Lands and establishment of a captive breeding population as a source for burrowing owls.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Consult with the Burrowing Owl Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to gather input into prioritized management actions. |
completed |
|
PRP-2 |
Submit project metadata and Burrowing Owl Conservation and Management Plant to the MSP Web Portal. |
|
|
Criteria |
Deadline year |
Burrowing Owl Management Plan Completed in 2017 |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-MGTPL ATHCUN-6
Management units: 3, 4, 5, 6, 9
Beginning in 2017, implement highest priority management actions from the Burrowing Owl Conservation and Management Plan.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, management datasets, and report to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
By 2021, =1 High Priority Management Action Implemented from the Burrowing Owl Conservation and Management Plan |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-MGTPL ATHCUN-7
Management units: 3, 4, 5, 6, 9
Beginning in 2017, monitor the effectiveness of management actions implemented for western burrowing owl on Conserved Lands.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit monitoring data and reports to MSP web portal |
waiting for precedent action |
|
Criteria |
Deadline year |
Monitoring Completed and Data and Report Submitted within one year of management actions |
2021 |
Encinitas baccharis Baccharis vanessae
Goal: Maintain or enhance existing Encinitas baccharis occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
regional and/or local
NFO
2017, 2019, 2021
SO
MON-IMP-IMG BACVAN-1
Management units: 3, 4, 6
Beginning in 2017, inspect Encinitas baccharis occurrences on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to record abundance and collect habitat and threat covariate data to determine management needs. After 2017, repeat monitoring every 2 years.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Surveys Completed Every 2 Years with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG BACVAN-2
Management units: 3, 4, 6
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Encinitas baccharis occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SO
MON-RES-GEN BACVAN-3
Management units: 3, 4, 6
In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Encinitas baccharis occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use BMPs to collect plant material for genetic samples at Encinitas baccharis occurrences in the MSPA. |
In progress |
Wed Demo |
RES-2 |
Evaluate the overall long-term genetic trajectory for Encinitas baccharis. |
In progress |
|
RES-3 |
Hold a workshop of scientists, rare plant experts, and land managers to develop management recommendations based upon the results of genetic analyses. |
In progress |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
By 2017, Completed Genetic Study with Management Recommendations |
2021 |
San Diego goldenstar Bloomeria clevelandii
Goal: Maintain or enhance existing San Diego goldenstar occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in chaparral, coastal sage scrub, grassland, and vernal pool/alkali playa vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-IMG BLOCLE-2
Management units: 3, 4, 6
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring conducted in 2016, 2018, and 2020 at San Diego goldenstar occurrence(s) on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Thread-leaved brodiaea Brodiaea filifolia
Goal: Maintain or enhance existing Thread-leaved brodiaea occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in grassland and vernal pool vegetation communities.
regional and/or local
NFO
2017, 2019, 2021
SS
MON-IMP-IMG BROFIL-1
Management units: 6, 7, 8
Beginning in 2017, inspect conserved populations of thread-leaved brodiaea in (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs. After 2017, repeat monitoring every 2 years.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Every 2 Years with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-IMG BROFIL-2
Management units: 6, 7, 8
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at thread-leaved brodiaea occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
NFO
2017
SS
MON-RES-SPEC BROFIL-3
Management units: 6, 7, 8
In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for thread-leaved brodiaea and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
Criteria |
Deadline year |
Refined Models and Prioritized Future Survey Locations for thread-leaved brodiaea by 2018 |
2021 |
Orcutt's brodiaea Brodiaea orcuttii
Goal: Maintain or enhance existing Orcutt's brodiaea occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral, grassland, oak woodland, southern interior cypress forests, and vernal pool vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG BROORC-1
Management units: 2, 3, 4, 6, 8
From 2017-2021, inspect Orcutt's brodiaea occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG BROORC-2
Management units: 2, 3, 4, 6, 8
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Orcutt's brodiaea occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
Otay Mesa Rare Plants |
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
Otay Mesa Rare Plants |
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
regional and/or local
NFO
2017, 2018, 2019
SO
MGT-IMP-IEX BROORC-4
Management units: 3
Beginning in 2017, establish 2 new Orcutt's brodiaea occurrences at Proctor Valley and Cal Terraces/Dennery Canyon. Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than 20% absolute cover within the occurrence
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct invasive plant control and distribute seed to establish new Orcutt's brodiaea occurrences. |
in progress |
|
IMP-2 |
Implement seed augmentation using seed collected and bulked by San Diego Zoo's Institute for Conservation Research. |
in progress |
|
IMP-3 |
Submit project metadata, management datasets and report to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
By 2020, 2 New Occurrences of Orcutt's Brodiaea Established and Report Submitted |
2021 |
Coastal cactus wren Campylorhynchus brunneicapillus sandiegensis
Goal: Protect, enhance, and restore suitable cactus scrub habitat for coastal cactus wrens to increase effective population size in each genetic cluster at a short term sustainable level (e.g. 50-100 wrens), rehabilitate habitat destroyed by wildfire, improve habitat quality to maintain populations during drought, enhance connectivity within and between genetic clusters to increase genetic diversity and rescue small populations, and manage anthropogenic predation risk to ensure the long term persistence (>100 years) of cactus wrens on Conserved Lands in the MSPA.
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-MGTPL CAMBRU-1
Management units: 2, 3, 4
From 2017 through 2021, continue implementing high priority management actions to: expand coastal cactus wren populations; rehabilitate habitat destroyed in the 2003 Cedar and 2007 Harris wildfires; improve connectivity within and between the Otay and San Diego/El Cajon genetic clusters (see occurrence table); and manage high risk of anthropogenic predation of adults and nestlings. These priority management actions are identified in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan prepared in 2015.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Following best practices in the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan, design cactus scrub enhancement and restoration projects to provide high quality nesting and foraging habitat with large patches of cacti >1 m tall in a mosaic of open scrub that provides sufficient food resources for reproduction and survival, especially during drought. As they become available, incoporate the results from the Cactus Wren Demography, Foraging and Arthropod Study to create restoration palettes that favor plant species associated with important arthropod food resources. Design planting layouts to maximize water availability by allocating a portion of the plantings to more mesic sites, such as ravines, at the bottom of slopes, and on northerly and easterly aspects. Control invasive nonnative plants to =20% absolute cover to reduce competition with native plants for water and light.
|
some occurrences are in progress |
Otay River Valley Cactus Wren Habitat Restoration and Enhancement , Salt Creek Coastal Cactus Wren Habitat Restoration Project |
IMP-2 |
Implement management actions, as needed, to reduce anthropogenic predation on wrens and their nests in fragmented habitats bordered by development where wrens are vulnerable to predation by cats, Cooper's hawks, corvids and other human-subsidized predators. Actions could include removing selected trees within or bordering cactus scrub that provide hunting, roosting, and nesting perches for hawks and corvids and avoiding cactus scrub restoration in areas where the terrain and location make wrens especially vulnerable to predation. Other measures could involve humanely removing feral cats from Conserved Lands and providing educational material and signage encouraging neighboring homeowners to keep their cats indoors so that wrens are protected and cats are safe from predation by wild animals, such as coyotes. |
some occurrences are in progress |
Otay River Valley Cactus Wren Habitat Restoration and Enhancement , Salt Creek Coastal Cactus Wren Habitat Restoration Project |
Criteria |
Deadline year |
By 2021, =3 High Priority Management Actions Implemented from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-MGTPL CAMBRU-2
Management units: 2, 3, 4
From 2017-2021, collect data on the effectiveness of implementing high priority management actions from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan. In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for the combined Otay and San Diego/El Cajon genetic clusters (see occurrence table) in south San Diego County. These results will be used in 2022 to update management recommendations and success criteria for the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Collect vegetation data to document success of cactus scrub restoration projects. This can include monitoring the height, diameter and survival of planted cactus and the composition and percent cover of native and nonnative shrubs, forbs and grasses. Document wren use of restored cactus scrub. |
some occurrences are in progress |
|
IMP-2 |
Submit restoration and enhancement project metadata, management datasets, and reports to the MSP Web Portal. |
in progress |
|
IMP-3 |
Conduct a meta-analysis of habitat restoration data and cactus wren population survey data to determine whether short-term success criteria have been achieved for habitat restoration actions and for wren populations in south San Diego County. Based upon these results, prepare recommendations for the 2022-2031 management strategy for coastal cactus wren. These broad recommendations can be used in 2022 to update the South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan with the next set of success criteria and specific, prioritized management actions. |
waiting for precedent action |
|
IMP-4 |
Submit cactus wren habitat restoration and population meta-analysis datasets, results, and management strategy recommendations for south San Diego County to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Success Criteria 2013-2021: Restore =70 Acres of High Quality Cactus Scrub and Increase the Combined Otay and San Diego/El Cajon Genetic Clusters to =75 Territories on C |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-SURV-SPEC CAMBRU-3
Management units: 2, 3, 4, 6
From 2017 to 2021, use a standardized protocol to survey for cactus wrens to determine territory, pairing and banding status and collect habitat covariate data in cactus scrub habitats on Conserved Lands in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). In 2018 and 2021, expand surveys to include the San Pasqual Valley/Lake Hodges genetic cluster.
Action |
Statement |
Action status |
Projects |
SURV-1 |
Conduct 2 rounds of protocol surveys each year for coastal cactus wrens in mapped cactus at long term monitoring sites and expand monitoring sites, as needed, to include restoration sites and newly conserved cactus scrub. Use standardized protocols to document the number of wrens observed, age, sex, pairing and nesting status, and color band combinations, and to assess habitat for shrub overgrowth and crowding, invasive plants, unhealthy or dead cactus, and dominant shrub and cactus species. Update cactus mapping at restored and newly conserved sites. |
in progress |
|
SURV-2 |
In conjunction with the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, focus on collecting banding status data to better understand cactus wren population dynamics, adult and juvenile survival, and dispersal capabilities in south San Diego County. |
unknown |
|
SURV-3 |
Submit project metadata, cactus wren survey and habitat assessment datasets, analyses and survey reports to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Cactus Wren Surveys and Habitat Assessments Completed 2017-2021 |
2021 |
regional and/or local
NFO
2017, 2018, 2019
SO
MON-RES-SPEC CAMBRU-4
Management units: 2, 3, 4
From 2017 to 2019, continue the Coastal Cactus Wren Demography, Vegetation and Arthropod Study begun in 2015 to investigate relationships between habitat quality and wren reproduction, dispersal and survival in the Otay and San Diego/El Cajon genetic clusters (see occurrence table). Habitat quality is measured at the territory scale and characterized by vegetation attributes, arthropod community composition, nestling diet, and potential availability of arthropod prey based on plant associations. Use the results to develop specific restoration recommendations to enhance habitat suitability and food resources important to cactus wren reproduction and survival.
Action |
Statement |
Action status |
Projects |
RES-1 |
Capture, uniquely color band, and monitor cactus wrens regularly during the breeding season to collect data on territory and breeding status, nesting phenology, nest fate, number of eggs/nestlings/fledglings per nest, and annual productivity, dispersal and survival. Measure habitat quality at each territory by characterizing the vegetation and by sampling arthropod communities associated with bare ground and 8 plant species common to cactus scrub. Determine nestling diets by collecting fecal samples during banding and using DNA barcoding methods to identify the arthropod taxa fed to nestlings. |
in progress |
|
RES-2 |
Identify arthropods important in the diet of nestling cactus wrens based on a DNA barcoding identification of arthropods in fecal samples obtained from the south San Diego County study, from the results of a similar study in Orange County, and from a literature search of adult and nestling cactus wren diets across their range. Evaluate the occurrence of arthropod taxa important to wren diets in association with 8 specific plant species and bare ground to determine those habitat attributes in cactus scrub that provide significant food resources for cactus wrens. Analyze wren reproductive parameters in relation to expected arthropod food availability based on the habitat attributes of each territory. Use the results to develop specific management recommendations for plant restoration palettes and for restoring the composition and cover of plants and bare ground that enhance food availablity for wrens. Determine how plants might be situated in the landscape to enhance arthropod food availability during droughts, such as planting a portion of plants in more mesic sites in ravines, at the bottom of slopes and on northerly and easterly aspects. |
in progress |
|
RES-3 |
Project metadata, datasets, analyses, and report with specific management recommendations will be submitted to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Coastal Cactus Wren Demography, Vegetation and Arthropod Study and Report with Management Recommendations Completed by 2020 |
2021 |
regional and/or local
NFO
2017, 2018, 2019
SO
MON-RES-GEN CAMBRU-5
Management units: 2, 3, 4, 6
From 2017-2019, in conjunction with standardized surveys and with banding activities for the Coastal Cactus Wren Demography, Vegetation and Arthropod Study, collect feather or blood samples from nestling and adult cactus wren at sites where wrens were sampled in 2011-2012 for the Southern California Cactus Wren Genetics Study (Barr et al. 2013, 2015). Determine if genetic diversity and effective population size have changed in the Otay, San Diego/El Cajon, and San Pasqual genetic clusters (see occurrence table) and evaluate whether there are potential threats to long-term population sustainability from inbreeding. Based on these results, prepare specific recommendations for managing gene flow and/or population expansion to enhance genetic diversity and effective population size.
Action |
Statement |
Action status |
Projects |
RES-1 |
Collaborate with the Natural Community Coalition to repeat the 2012 Southern California Coastal Cactus Wren Genetics Study (Barr et al. 2013, 2015) for the Coastal Orange County-Camp Pendleton, San Diego/El Cajon, Otay, and San Pasqual genetic clusters. Evaluate whether the clusters with low effective population sizes and potential inbreeding have changed their levels of genetic diversity in the intervening 6 years with management to increase cactus scrub and improve connectivity, from translocating wrens between genetic clusters, or from population declines during a long and intense drought. |
in progress |
|
RES-2 |
Analyze genetic and reproduction data from Orange County and San Diego County studies to determine if reproduction may be adversely affected by inbreeding or low genetic diversity. If lack of genetic diversity and inbreeding show signs of depressing productivity, then evaluate and prioritize specific management recommendations to increase gene flow, such as switching eggs or translocating individuals between genetic clusters over the short term and restoring habitat to expand populations and improve connectivity within and between genetic clusters over the long term. |
in progress |
|
RES-3 |
Submit project metadata, datasets, analyses, and report with specific management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Genetic Study Completed and Report Submitted by 2020 |
2021 |
regional and/or local
PRE
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-NUR CAMBRU-6
Management units: 2, 3, 4, 6
From 2017-2021, continue operation of the North San Diego County Cactus Nursery and support a South San Diego County Cactus Nursery to supply cactus to land managers to enhance, restore and create coastal cactus wren habitat. Grow cactus pads, segments and entire plants sufficient for restoration projects to expand and enhance cactus scrub habitat and as a source of plants for immediate habitat rehabilitation following severe wildfire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement BMPs when harvesting and growing cactus at a nursery in preparation for transplant into natural lands for cactus restoration projects and to provide an emergency source of cactus following wildfire. |
some occurrences are in progress |
North County Cactus Nursery and Coastal Cactus Wren Habitat Restoration (2015-2018) |
IMP-2 |
Grow and supply cactus pads, segments, and entire plants from locally harvested native cactus with a composition of species reflecting what naturally occurs in each geographic area. The North County Cactus Nursery should cactus to projects in MUs 6 and 8 and those areas in MU 4 dominated by prickly pear cactus. The South County Cactus Nursery should supply cactus to MUs 2 and 3 and to those areas in MU 4 dominated by coast cholla. The amount of cactus produced will be determined periodically based upon: management recommendations from the 2015 South San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan; from ICR's Restoration Analyses for the San Pasqual Valley and Lake Hodges; an evaluation of planned and ongoing cactus restoration projects; and an assessment of cactus needed to be kept in reserve for future post-fire rehabilitation efforts. |
some occurrences are in progress |
North County Cactus Nursery and Coastal Cactus Wren Habitat Restoration (2015-2018) |
IMP-3 |
Submit project metadata, nursery plans, and reports with information on harvesting, growing and distributing cactus for restoration projects to the MSP Web Portal. |
some occurrences are in progress |
North County Cactus Nursery and Coastal Cactus Wren Habitat Restoration (2015-2018) |
Criteria |
Deadline year |
Cactus Nurseries Established in North and South San Diego County to Provide Sufficient Cactus for Restoration and PostFire Rehabilitation |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IEX CAMBRU-7
Management units: 5, 6
In 2017-2021, continue supporting restoration of cactus scrub based upon ICR's Restoration Analyses for the San Pasqual Valley/Lake Hodges coastal cactus wren genetic cluster (see occurrence table) to: rehabilitate cactus scrub destroyed or degraded by the 2007 Witch Fire; to expand occurrences, particularly adjacent to Lake Hodges; to improve connectivity within the genetic cluster; and as needed, to manage high risk of anthropogenic predation of adults and nestlings.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Following best practices, design cactus scrub enhancement and restoration projects to provide high quality nesting and foraging habitat with large patches of cacti >1 m tall in a mosaic of open scrub that provides sufficient food resources for reproduction and survival, especially during drought years when arthropod food resources are limiting. As they become available, incoporate the results from the Cactus Wren Demography, Foraging and Arthropod Study to create restoration palettes that favor plant species associated wtih important wren food resources. Design planting layouts to maximize water availability by allocating a portion of the plantings to more mesic sites, such as ravines, at the bottom of slopes, and on northerly and easterly aspects. Control invasive nonnative plants to =20% absolute cover to reduce competition with native plants for water and light.
|
in progress |
Hodges Reservoir-Bernardo Bay Cactus Wren Habitat Restoration Grant Project |
IMP-2 |
Implement management actions, as needed, to reduce anthropogenic predation on wrens and their nests in fragmented habitats bordered by development where wrens are vulnerable to predation by cats, Cooper's hawks, corvids and other human-subsidized predators. Actions could include removing selected trees within or bordering cactus scrub that provide hunting, roosting, and nesting perches for hawks and corvids and avoiding cactus scrub restoration in areas where the terrain and location make wrens especially vulnerable to predation. Other measures could involve humanely removing feral cats from Conserved Lands and providing educational material and signage encouraging neighboring homeowners to keep their cats indoors so that wrens are protected and cats are safe from predation by wild animals, such as coyotes. |
in progress |
Hodges Reservoir-Bernardo Bay Cactus Wren Habitat Restoration Grant Project |
Criteria |
Deadline year |
By 2021, =2 High Priority Management Actions Implemented from ICR's Restoration Analyses for the San Pasqual Valley and Lake Hodges |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-MGTPL CAMBRU-8
Management units: 5, 6
From 2017-2021, collect data on the effectiveness of implementing high priority management actions to restore cactus scrub to expand coastal cactus wren populations and enhance connectivity within the San Pasqual Valley/Lake Hodges genetic cluster (see occurrence table). In 2021, compile data from all restoration projects and determine the effectiveness of cumulative management actions for north San Diego County. Use these results to develop a management strategy that will provide the basis for preparing a North County Coastal Cactus Wren Habitat Conservation and Management Plan in 2022.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Collect vegetation data to document success of cactus scrub restoration projects. This can include monitoring the height, diameter and survival of planted cactus and the composition and percent cover of native and nonnative shrubs, forbs and grasses. Document wren use of restored cactus scrub. |
some occurrences are in progress |
|
IMP-2 |
Submit restoration and enhancement project metadata, management datasets, and reports to the MSP Web Portal. |
some occurrences are in progress |
|
IMP-3 |
Conduct a meta-analysis of habitat restoration data and cactus wren population survey data to determine whether short-term success criteria have been achieved for habitat restoration actions and for wren populations in north San Diego County. Based upon these results, prepare recommendations for a 2022-2031 management strategy for coastal cactus wren. These broad recommendations can be used in 2022 to prepare a North San Diego County Coastal Cactus Wren Habitat Conservation and Management Plan with specific, prioritized management actions. |
waiting for precedent action |
|
IMP-4 |
Submit cactus wren habitat restoration and population meta-analysis datasets, results, and management strategy recommendations for north San Diego County to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Success Criteria 2013-2021: Restore =75 Acres of High Quality Cactus Scrub and Increase the San Pasqual Valley/Lake Hodges Genetic Cluster to =90 Territories on Conserve |
2021 |
regional and/or local
PRE
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-FMGT CAMBRU-9
Management units: 2, 3, 4, 5, 6
Implement prefire management to reduce potential severity and impacts from future fire at prioritized cactus wren occurrences and habitats most at risk from wildfire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement management actions to reduce severity of potential fires through opening up dense cactus scrub habitats by trimming and thinning shrubs to maintain open scrub, maintaining bare ground buffers around large intact cactus patches, and by reducing nonnative grasses and herbs that can carry wildfire into cactus patches. Design management actions to avoid significant impacts to CSS vegetation or to other MSP species. |
Available for implementation |
|
IMP-2 |
As opportunities arise, implement management actions to reduce potential fire impacts in conjunction with other ongoing enhancement and restoration projects for cactus wrens. |
Available for implementation |
|
IMP-3 |
Submit project metadata and management actions to the MSP Web Portal. |
Available for implementation |
|
Criteria |
Deadline year |
By 2021, Implement =1 Management Action to Reduce Impacts from Future Fire at Prioritized Wren Occurrences |
2021 |
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-FMGT CAMBRU-10
Management units: 2, 3, 4, 5, 6
For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of coastal cactus wren occurrences affected by the wildfire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing postfire cactus scrub habitat recovery. Collect habitat recovery data at unoccupied cactus scrub sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover wren populations and important cactus scrub habitat patches.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Prepare postfire habitat monitoring protocols and sampling design to determine the status of coastal cactus wrens and characterize cactus scrub recovery following wildfire. Use the monitoring results to identify management actions to ensure postfire recovery of high quality cactus scrub at occupied cactus wren sites and at unoccupied cactus scrub sites important for wren population expansion and connectivity within and between genetic clusters. |
On hold |
|
IMP-2 |
Submit project metadata, cactus wren postfire survey and habitat monitoring data, annual reports with management recommendations, and a final report documenting project methods and results to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Monitoring of Cactus Wrens and Habitats with Annual Management Recommendations |
2021 |
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-FMGT CAMBRU-11
Management units: 2, 3, 4, 5, 6
For at least the first 3 years following a wildfire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality cactus scrub to allow for recovery of coastal cactus wren occurrences affected by the wildfire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement management actions to restore cactus scrub habitat destroyed by wildfire. These management actions may include planting large >1m cactus to create nesting and roosting habitat for immediate postfire use by cactus wrens, planting pads and segments to improve habitat over the longer term, and to seed or plant native shrubs and forbs as needed to enhance habitat suitability and increase available arthropod food resources (use recommendations from the Coastal Cactus Wren Demography, Vegetation and Arthropod Study). Control invasive nonnative plants to =20% absolute cover to reduce postfire invasion of nonnative plants and to allow postfire recovery of native plants by reducing competition for water and light. Control erosion and human use impacts while habitat is recoverying. |
On hold |
|
IMP-2 |
Submit project metadata and management actions to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Management in Priority Cactus Wren Habitats |
2021 |
Western snowy plover Charadrius nivosus nivosus
Goal: Protect, enhance, and restore occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long term (>100 years). ​
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-MONPL CHANIV-2
Management units: 1, 7
From 2017 to 2021, continue the existing survey efforts for western snowy plover implemented by the wildlife agencies and military.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit monitoring data and management recommendations to the MSP web portal. |
|
|
Criteria |
Deadline year |
Western Snowy Plover Surveys and Reports Completed Annually |
2021 |
chaparral
Goal: Maintain, enhance and restore chaparral on Conserved Lands in the MSPA that supports or has the potential to support VF species (i.e., Del Mar manzanita, felt-leaved monardella, Lakeside ceanothus, Nuttall's scrub oak, Otay manzanita, Rainbow manzanita, wart-stemmed ceanothus, California newt, Bell's sage sparrow) and to incidentally benefit a diverse array of other species (e.g., Encinitas baccharis, Jennifer's monardella, Orcutt's hazardia, mountain lion) so that the vegetation community has high ecological integrity, and these species are resilient to environmental stochasticity, catastrophic disturbances and threats, such as very large wildfires and prolonged droughts, and will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2018, 2019
MON-PRP-MONPL CHAPAR-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, prepare a long-term monitoring plan for the mosaic of chaparral, coastal sage scrub and grassland vegetation communities that focuses on tracking community composition, structure and ecological integrity over time in relation to climate (i.e., drought) and disturbance from fire. The monitoring plan should include a conceptual model, specific monitoring questions, the sampling frame within the MSPA, monitoring methods, a statistically valid sampling design, permanent sampling locations, timeline, and standardized protocols. Use the landscape-scale ecological integrity classification map to develop a sampling frame and the sampling design with permanent sampling plots spanning north to south and east to west environmental gradients across the MSPA. Evaluate how the vegetation integrity classes characterize other aspects of the ecosystem by integrating other types of monitoring into the long-term sampling plots, such as abiotic element monitoring (e.g., automated weather stations and soil sensors, GIS-data layers), ecological integrity monitoring (e.g., plant and animal communities, ecological processes), MSP VF species monitoring, and threats monitoring (e.g., fire, climate change, invasive plants). A draft monitoring plan should be prepared in 2017, tested in the field with a pilot study in 2018, and finalized by 2019.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Establish a vegetation monitoring working group of scientists, wildlife agencies, land managers, and other stakeholders to participate in developing the vegetation monitoring plan. The group should also include interested parties from outside the MSPA, such as representatives from other multiple species plans in Orange and Riverside Counties and from San Diego County military bases, to create a regional monitoring program with greater efficiencies in effort and a broader inference across southern California. |
In progress |
|
PRP-2 |
Submit project metadata, datasets, analyses, and Chaparral, Grassland and Coastal Sage Scrub Vegetation Monitoring Plan to the MSP web portal |
In progress |
|
Criteria |
Deadline year |
Chaparral, Coastal Sage Scrub and Grassland Vegetation Monitoring Plan completed by 2019 |
2021 |
Regional
NFO
2017, 2018, 2019, 2020, 2021
MON-DEV-MAP CHAPAR-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, develop a landscape-scale map classifying ecological integrity of shrublands across the MSPA based upon shrub cover and density and invasive nonnative annual grasses using remote imagery (e.g., satellite and high resolution aerial imagery, LIDAR) and vegetation data collected during 2015-2016 California gnatcatcher regional and postfire monitoring. Verify and revise the mapping as needed using field data collected in 2018-2020 as part of the Chaparral, Coastal Sage Scrub and Grassland Vegetation Monitoring Program and from related VF species monitoring (e.g., California gnatcatcher regional and postfire monitoring). Revise the integrity classification map as needed to respond to changes in vegetation based upon wildfires, drought or other large-scale disturbances.
Criteria |
Deadline year |
Ecological Integrity Map created in 2017 and updated as needed 2018-2021 |
2021 |
Salt marsh bird's-beak Chloropyron maritimum ssp. maritimum
Goal: Maintain or enhance existing salt marsh bird's-beak occurrences and create salt marsh to establish new occurrences to reduce risk of population loss to rising sea levels and to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in salt marsh vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG CHLMAR-1
Management units: 1
Beginning in 2017, annually inspect salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG CHLMAR-2
Management units: 1
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at salt marsh bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SL
MON-RES-GEN CHLMAR-3
Management units: 1
In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for salt marsh bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing to enhance existing occurrences and establish new occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use BMPs to collect plant material for genetic samples at salt marsh bird's-beak occurrences in the MSPA. |
In progress |
|
RES-2 |
Hold a workshop of scientists, rare plant experts, and land managers to develop management recommendations based upon the results of genetic analyses. |
In progress |
|
RES-3 |
Evaluate the overall long-term genetic trajectory for salt marsh bird's-beak. |
In progress |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Genetic Study with Management Recommendations Completed in 2017 |
2021 |
Regional and/or Local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-SBPL CHLMAR-6
Management units: 1
From 2017-2019, collect salt marsh bird's-beak seed for conservation banking. In 2019, begin implementing high priority actions for salt marsh bird's-beak from the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
Criteria |
Deadline year |
By 2022, =2 Highest Priority Actions Implemented for Salt Marsh Bird's-beak from the MSP Seed Collection, Banking and Bulking Plan |
2021 |
Orcutt's spineflower Chorizanthe orcuttiana
Goal: Maintain or enhance existing Orcutt's spineflower occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG CHOORC-1
Management units: 6, 7
Beginning in 2017, conduct annual surveys of all Orcutt's spineflower.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG CHOORC-2
Management units: 6, 7
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at Orcutt's spineflower occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
in progress |
Otay Mesa Rare Plants |
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
in progress |
Otay Mesa Rare Plants |
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SL
MON-SURV-SPEC CHOORC-3
Management units: 6, 7
In 2017, continue efforts begun in 2015 to survey historic Orcutt's spineflower locations to: determine current occurrence status; survey and delineate potentially suitable habitat for new occurrences; survey existing occurrences to identify the potential for enhancement and expansion; and at all sites collect data on occurrence status, habitat and threats and determine management needs.
Action |
Statement |
Action status |
Projects |
SURV-1 |
At each extant occurrence, map the extent of the occurrence, collect data on abundance, map adjacent suitable habitat for potential occurrence expansion, collect covariate data on threats including estimates of cover of invasive non-native plants and trampling. |
In progress |
|
SURV-2 |
Submit project metadata, habitat mapping, occurrence status, habitat and threats assessments, management recommendations, and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Baseline Surveys and Report Completed by 2018 |
2021 |
regional
NFO
2017
SL
MGT-IMP-IEX CHOORC-4
Management units: 6, 7
In 2017, continue BMPs initiated in 2015 to establish 4 new occurrences of Orcutt's spineflower.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Establish 4 new occurrences of Orcutt |
in progress |
|
IMP-2 |
Use BMPs for site preparation (Bauder 2010a,b). Sites with ice plant or Acacia shrubs should be cleared of these invasive plants and duff and then watched for at least 2 years with suitable growing conditions to determine if there are viable spineflower |
in progress |
|
IMP-3 |
Maintain newly established occurrences so that there is <20% invasive non-native absolute cover, minimal encroachment of native plants (based upon standards used at the Point Loma Naval Base), and no ground disturbance from erosion or trampling. |
in progress |
|
IMP-4 |
Use the seed collection and bulking plan to determine seed sources and timing and amount of seeding. |
in progress |
|
IMP-5 |
Submit project metadata, monitoring and management data to MSP web portal. |
in progress |
|
Criteria |
Deadline year |
4 New Occurrences of Orcutt's Spineflower Established by 2018 |
2021 |
Northern harrier Circus cyaneus
Goal: Protect, enhance, and restore northern harrier occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG CIRCYA-2
Management units: 1, 3, 4, 5, 6, 7, 8
From 2017 to 2021, annually inspect the existing nesting occurrences of northern harrier, taking precautions to avoid disturbance, to identify necessary management actions in order to support the expansion of the occurrence to self sustaining levels.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol survey locations and habitat, assess status, and quantify potential threats. |
Available for implementation |
|
IMP-2 |
Based upon threat evaluation, determine if routine management or more intensive management is warranted. |
Available for implementation |
|
IMP-3 |
Submit monitoring data and management recommendations to MSP web portal |
Available for implementation |
|
Criteria |
Deadline year |
Surveys Completed Annually with management recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG CIRCYA-3
Management units: 1, 3, 4, 5, 6, 7, 8
From 2017-2021, perform routine management activities such as protecting nesting occurrences from disturbance through fencing, signage, and enforcement.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform management activities protecting occurrences from disturbance through fencing, signage, and enforcement. |
Available for implementation |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
Available for implementation |
|
Criteria |
Deadline year |
Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
San Miguel savory Clinopodium chandleri
Goal: Maintain or enhance existing San Miguel savory occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in chaparral, coastal sage scrub and oak woodland vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG CLICHA-2
Management units: 3, 4
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring in 2016, 2018, and 2020 at San Miguel savory occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit monitoring and management data to the SC-MTX website portal. |
available for implementation |
|
IMP-2 |
Submit monitoring and management data to the SC-MTX website portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Climate change
Goal: The climate change management goal for the MSPA is to maintain and enhance the long-term ecological integrity, resilience and viability of ecosystems, MSP species, and vegetation communities on Conserved Lands and to facilitate range shifts in species and vegetation communities as necessary for long term persistence in the region.
regional
NFO
2017, 2018, 2019, 2020, 2021
MON-DEV-MODL CLICHN-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, begin developing habitat suitability models for plant and animals species and vegetation communities under current and future climate change scenarios. Extend the modeling to consider the influence of other types of threats, such as changing fire regimes, land use and invasive species. Evaluate potential future conditions across the MSPA to identify where species and vegetation communities may be expected to persist, where they may shift in response to changing environmental conditions, and where threats may be greatest. Identify climate refugia and areas where climate change impacts may be the greatest. Obtain sea level modeling models and maps to incorporate into coastal climate change evaluations. The results of these modeling efforts will be considered in developing species and vegetation monitoring and management plans.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Submit project metadata, modeling data, model predictions and reports to MSP Web Portal |
In progress |
|
Criteria |
Deadline year |
Complete climate change models for =10 MSP species by 2021 |
2021 |
coastal sage scrub
Goal: Maintain, enhance and restore coastal sage scrub on Conserved Lands in the MSPA that supports or has the potential to support VF species (i.e., cliff spurge, Palmer's goldenbush, San Diego barrel cactus, snake cholla, Blaineville's horned lizard, California gnatcatcher, San Diego black-tailed jackrabbit) and to incidentally benefit a diverse array of other species (e.g., San Diego thornmint, Hermes copper, Quino checkerspot, coastal cactus wren) so that the vegetation community has high ecological integrity, and these species are resilient to environmental stochasticity, catastrophic disturbances and threats, such as very large wildfires, invasive plants and prolonged drought, and will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2018, 2019
MON-PRP-MONPL COSASC-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, prepare a long-term monitoring plan for the mosaic of chaparral, coastal sage scrub and grassland vegetation communities that focuses on tracking community composition, structure and ecological integrity over time in relation to climate (i.e., drought) and disturbance from fire. The monitoring plan should include a conceptual model, specific monitoring questions, the sampling frame within the MSPA, monitoring methods, a statistically valid sampling design, permanent sampling locations, timeline, and standardized protocols. Use the landscape-scale ecological integrity classification map to develop a sampling frame and the sampling design with permanent sampling plots spanning north to south and east to west environmental gradients across the MSPA. Evaluate how the vegetation integrity classes characterize other aspects of the ecosystem by integrating other types of monitoring into the long-term sampling plots, such as abiotic element monitoring (e.g., automated weather stations and soil sensors, GIS-data layers), ecological integrity monitoring (e.g., plant and animal communities, ecological processes), MSP VF species monitoring, and threats monitoring (e.g., fire, climate change, invasive plants). A draft monitoring plan should be prepared in 2017, tested in the field with a pilot study in 2018, and finalized by 2019.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Establish a vegetation monitoring working group of scientists, wildlife agencies, land managers, and other stakeholders to participate in developing the vegetation monitoring plan. The group should also include interested parties from outside the MSPA, such as representatives from other multiple species plans in Orange and Riverside Counties and from San Diego County military bases, to create a regional monitoring program with greater efficiencies in effort and a broader inference across southern California. |
In progress |
|
PRP-2 |
Submit project metadata, datasets, analyses, and Chaparral, Coastal Sage Scrub, and Grassland Vegetation Monitoring Plan to the MSP web portal |
In progress |
|
Criteria |
Deadline year |
Chaparral, Coastal Sage Scrub and Grassland Vegetation Monitoring Plan completed by 2019 |
2021 |
Regional
NFO
2017, 2018, 2019, 2020, 2021
MON-DEV-MAP COSASC-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, develop a landscape-scale map classifying ecological integrity of shrublands across the MSPA based upon shrub cover and density and invasive nonnative annual grasses using remote imagery (e.g., satellite and high resolution aerial imagery, LIDAR) and vegetation data collected during 2015-2016 California gnatcatcher regional and postfire monitoring. Verify and revise the mapping as needed using field data collected in 2018-2020 as part of the Chaparral, Coastal Sage Scrub and Grassland Monitoring Program and from related VF species monitoring (e.g., California gnatcatcher regional and postfire monitoring). Revise the integrity classification map as needed to respond to changes in vegetation based upon wildfires, drought or other large-scale disturbances.
Criteria |
Deadline year |
Ecological Integrity Map created in 2017 and updated as needed 2018-2021 |
2021 |
Otay tarplant Deinandra conjugens
Goal: Maintain or enhance existing Otay tarplant occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in native and non native grassland vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SS
MON-IMP-IMG DEICON-1
Management units: 3
In 2017, begin annual inspections of extant occurrences of Otay tarplant on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record spatial extent, estimate abundance, and collect habitat and threat covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine if routine management or more intensive management is warranted. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP web portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-IMG DEICON-2
Management units: 3
Beginning in 2017, conduct routine management actions identified through the annual IMG monitoring at Otay tarplant occurrences on Conserved Lands (see occurrence table) . Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities as needed, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata, monitoring and management recommendations to the MSP web portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
regional
NFO
2017
SS
MGT-DEV-BMP DEICON-3
Management units: 3
In 2017 continue the collaboration with the South County Grasslands Project initiated in 2014 to develop BMPs for landscape-scale restoration of Otay tarplant habitat in MU3 that includes testing methods of seeding and invasive plant control so that nonnative plants and thatch are reduced to less than 20% relative cover and thatch to <5 cm tall and native plants to at least 25% relative cover. These percent cover criteria could be revised based on data collected from an acceptable reference site.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Conduct experiments using mowing, prescribed burns herbicide and potentially grazing to control invasive non-native grasses and forbs at a landscape-scale and to compare drill seeding versus hand broadcast seeding in order to determine economical and effect. |
in progress |
|
DEV-2 |
Based upon experiment results, develop explicit BMPs for the restoration of Otay tarplant. Submit project metadata, monitoring datasets and BMP report to MSP web portal. |
in progress |
|
Criteria |
Deadline year |
BMPs Developed for Restoration of Otay tarplant by 2017 |
2021 |
regional
NFO
2017
SS
MON-RES-GEN DEICON-4
Management units: 3
In 2017, continue a study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Otay tarplant occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use BMPs to collect plant material for genetic samples at conserved Otay tarplant occurrences (Table 2-3.3). |
in progress |
|
RES-2 |
Evaluate the overall long-term genetic trajectory for Otay tarplant |
in progress |
|
RES-3 |
Hold a workshop of scientists, rare plant experts, and land managers to develop management recommendations based upon the results of genetic analyses. |
waiting for precedent action |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
By 2018, Completed Genetic Study for Otay Tarplant with Management Recommendations |
2021 |
Regional and/or Local
NFO
2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-SBPL DEICON-10
Management units: 3
In 2019, begin implementing the MSP Seed Collection, Banking and Bulking Plan for Otay tarplant to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Bulk seed at a qualified facility for enhancement, expansion, establishment or transplantation projects using seed from genetically appropriate donor accessions in the propagation seed bank collection. |
some occurrences are in progress |
|
IMP-2 |
Maintain records for collected seed to document donor and receptor sites, collection dates and amounts. Submit seed collection, storage and bulking data to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
By 2023, > 1 Highest Priority Action Implemented for Otay Tarplant from the MSP Seed Collection, Banking and Bulking Plan |
2021 |
Regional
NFO
2017
SS
MON-RES-SPEC DEICON-11
Management units: 3
In 2017, continue field research into soils and habitat relationships and development of habitat suitability and climate change models for Otay tarplant and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
Criteria |
Deadline year |
Refined Models and Prioritized Future Survey Locations for Otay Tarplant by 2018 |
2021 |
Orcutt's birds-beak Dicranostegia orcuttiana
Goal: Maintain or enhance existing Orcutt's bird's-beak occurrences and establish new occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in coastal sage scrub vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG DICORC-1
Management units: 1, 3
From 2017 to 2021, inspect Orcutt's bird's-beak occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG DICORC-2
Management units: 1, 3
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Orcutt's bird's-beak occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SL
MON-RES-GEN DICORC-3
Management units: 1, 3
In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for Orcutt's bird's-beak occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting, bulking and distributing seed to enhance existing occurrences or establish new occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use BMPs to collect plant material for genetic samples at Orcutt's bird's-beak occurrences in the MSPA. |
In progress |
Population Genetic Analysis of 6 Rare Plant Species in San Diego County |
RES-2 |
Hold a workshop of scientists, rare plant experts, and land managers to develop management recommendations based upon the results of genetic analyses. |
In progress |
|
RES-3 |
Evaluate the overall long-term genetic trajectory for Orcutt's bird's-beak. |
In progress |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Genetic Study with Management Recommendations Completed in 2017 |
2021 |
regional and/or local
NFO
2017, 2018, 2019
SL
MGT-IMP-IEX DICORC-5
Management units: 3
From 2017 to 2019, enhance Orcutt's bird's-beak at the Cal Terraces/Dennery Canyon occurrence (see occurrence table). Invasive plant control should be conducted using BMPs so that invasive plants are reduced to less than or equal to 20% absolute cover within the occurrence’s occupied extent and adjacent suitable habitat.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct invasive plant control and distribute seed to enhance Orcutt's bird's-beak occurrence. |
in progress |
|
IMP-2 |
Implement seed augmentation using seed collected and bulked by San Diego Zoo's Institute for Conservation Research. |
in progress |
|
IMP-3 |
Submit project metadata and management data to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
By 2019, Orcutt's Bird's-beak Occurrence Enhanced and Report Submitted |
2021 |
Regional and/or Local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-SBPL DICORC-7
Management units: 1, 3
From 2017-2019, collect Orcutt's bird's-beak seed for conservation banking and bulk seed for enhancing and expanding the Cal Terraces/Dennery Canyon occurrence (see occurrence table). In 2021, begin implementing high priority actions for Orcutt's bird's-beak in the MSP Seed Collection, Banking and Bulking Plan to collect and store seeds at a permanent seed bank and to provide propagules as needed for management oriented research, existing population enhancement and establishment of new occurrences.
Criteria |
Deadline year |
By 2025, =1 Highest Priority Action Implemented for Orcutt'sBird's-beak from the MSP Seed Banking and Bulking Plan |
2021 |
Stephens' kangaroo rat Dipodomys stephensi
Goal: Protect, enhance, and restore Stephens’ kangaroo rat occupied habitat and historically occupied habitat and the landscape connections between them to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG DIPSTE-1
Management units: 5, 9
Inspect extant Stephens’ kangaroo rat occurrences on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
available for implementation |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Surveys Completed in 2018 with Management Recommendations |
2018 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG DIPSTE-2
Management units: 5, 9
Conduct routine management actions as identified through the IMG monitoring at Stephens' kangaroo rat occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
|
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
|
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Blochman's dudleya Dudleya blochmaniae
Goal: Maintain or enhance existing Blochman's dudleya occurrences and re-establish historic occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in coastal sage scrub vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG DUDBLO-1
Management units: 1, 6
From 2017-2021, inspect Blochman's dudleya occurrences annually on Conserved Lands (see occurrence table) using the IMG regional monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Annual Surveys Completed with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG DUDBLO-2
Management units: 1, 6
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Blochman's dudleya occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities as needed, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Short-leaved dudleya Dudleya brevifolia
Goal: Maintain or enhance existing Short-leaved dudleya occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG DUDBRE-1
Management units: 6, 7
In 2017, continue annual inspections of short-leaved dudleya on Conserved Lands in (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect covariate habitat and threats data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
available for implementation |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Surveys Completed Every Year with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG DUDBRE-2
Management units: 6, 7
Beginning in 2017, conduct routine management actions identified through the annual IMG monitoring at short leaved dudleya occurrences on Conserved Lands in (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities as needed, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to at most 20% absolute cover. |
available for implementation |
Otay Mesa Rare Plants |
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
Otay Mesa Rare Plants |
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Variegated dudleya Dudleya variegata
Goal: Maintain or enhance variegated dudleya occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in chaparral and coastal sage scrub vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-IMG DUDVAR-2
Management units: 2, 3, 4, 6
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring in 2016, 2018 and 2020 at variegated dudleya on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Sticky dudleya Dudleya viscida
Goal: Maintain or enhance existing sticky dudleya occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in chaparral and coastal sage scrub vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-IMG DUDVIS-2
Management units: 6
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring conducted in 2016 and 2021 at sticky dudleya on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Southwestern willow flycatcher Empidonax traillii extimus
Goal: Protect, enhance, and restore southwestern willow flycatcher occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
NFO
2017, 2018, 2019
SL
MON-RES-SPEC EMPTRA-1
Management units: 1, 4, 6, 8, 9, 10, 11
In 2017-2019, continue the 5-year breeding bird study begun by USGS in 2015 of southwestern willow flycatcher in the San Luis Rey River and other drainages to determine the status in the MSPA and impacts to riparian habitat from SHB/Fusarium complex and other threats. Prepare site-specific management recommendations based on survey results.
Action |
Statement |
Action status |
Projects |
RES-1 |
Submit monitoring data and management recommendations to MSP web portal |
In progress |
|
Criteria |
Deadline year |
Southwestern Willow Flycatcher Surveys and Reports Completed by 2020 |
2021 |
Southwestern pond turtle Emys marmorata pallida
Goal: Protect and enhance existing populations of southwestern pond turtle to self-sustaining levels (i.e. 200+ individuals, even sex ratio, evidence of recruitment) in areas that meet the conditions for long-term management (low human access; high naturalness) and create new self-sustaining occurrences to ensure persistence over the long-term (>100 years).
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-TRAN EMYMAR-1
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, continue efforts to expand and translocate occurrences of pond turtles to increase to self-sustaining levels in MU3 in the Sweetwater and Otay River Watersheds (at SPER, RJER, and other suitable sites) and identify, expand, and translocate pond turtles in at least 2 other watersheds in the MSPA, including but not limited to the San Diego and San Dieguito Rivers. Translocation efforts may include management of invasive aquatic and plant species, providing access protection, and headstart efforts.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct routine management as needed at the Sycuan Peak ER occurrence of southwestern pond turtle. |
In progress |
|
IMP-2 |
Conduct routine management as needed at the Rancho Jamul ER translocated occurrence of southwestern pond turtle. |
In progress |
|
IMP-3 |
Continue to identify, begin management of invasive species, and translocate pond turtle to at least 2 suitable locations in the San Dieguito and San Diego River (e.g. El Monte Ponds, Boulder Creek Preserve) watersheds. |
In progress |
|
IMP-4 |
Submit monitoring and management data to the regional MSP web portal. |
In progress |
|
Criteria |
Deadline year |
By 2021, 2 new occurrences translocated in the San Diego and San Dieguito River Watersheds; SPER and RJER occurrences increased by 20% through recruitment from 2017 leve |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-TRAN EMYMAR-2
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, continue monitoring the effectiveness of southwestern pond turtle translocation experiments at SPER and RJER (see Table of Occurrences) and any additional translocated occurrences.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Continue to monitor the expanded and head-started occurrence and/or habitat at SPER and RJER to document success. |
In progress |
|
IMP-2 |
Monitor other translocated occurrences to document success. |
waiting for precedent action |
|
Criteria |
Deadline year |
Southwestern Pond Turtle Translocation Monitoring and Reports Completed Annually |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IEX EMYMAR-3
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, implement invasive aquatic animal and invasive plant control at natural and translocated pond turtle occurrences as needed to increase recruitment and basking habitat.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Follow guidelines in the existing Invasive Plant Strategic Plan (CBI et al 2012) and invasive plant and animal sections of the updated MSP. |
In progress |
|
IMP-2 |
Submit management data to the regional MSP web portal. |
In progress |
|
IMP-3 |
|
Unknown |
|
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG EMYMAR-4
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, biennially inspect the existing occurrences of southwestern pond turtle to identify necessary management actions in order to support the expansion of the occurrence to self sustaining levels.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Use regional IMG monitoring protocol to assess status, habitat, and quantify potential threats. |
Available for implementation |
|
IMP-2 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
Available for implementation |
|
IMP-3 |
Submit monitoring and management data to the regional MSP web portal. |
Available for implementation |
|
Criteria |
Deadline year |
Surveys Completed every two years with management recommendations |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG EMYMAR-5
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, conduct routine management actions identified through the IMG regional protocol monitoring, including protecting populations from disturbance, removing invasive plants, and removing aquatic predators and exotic species (which compete and or prey on western pond turtle, primarily young) within the known occupied and suitable habitat.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance, controlling invasive plants, and removing invasive aquatic animals. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-FMGT EMYMAR-12
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, implement post fire management actions to ensure the recovery of Southwest pond turtle at occupied sites following wildfire events, including invasive plant and animal control, debris/sediment removal, erosion control or other management actions as needed after fire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement needed management actions as determined through BAER or other post fire surveys. |
available for implementation |
|
Criteria |
Deadline year |
Post fire management actions implemented following wildfire events |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-FMGT EMYMAR-13
Management units: 3, 4, 5, 6, 8
From 2017 to 2021, monitor stream conditions and the effectiveness of management actions implemented to assist in recovery of Southwestern pond turtle for 3 years following wildfire events.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Monitor stream flows and water quality postfire, document recovery of southwestern pond turtle populations and habitat, and effectiveness of any management actions for first 3 years after fire. |
waiting for precedent action |
|
Criteria |
Deadline year |
Monitoring of post fire management actions, stream conditions, and population status for Southwest pond turtles implemented for 3 years post fire |
2021 |
Coast wallflower Erysimum ammophilum
Goal: Maintain or enhance existing coast wallflower occurrences and establish new occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in chaparral, coastal bluff, coastal dune and coastal sage scrub vegetation communities.
regional and/or local
NFO
2017, 2019, 2021
SL
MON-IMP-IMG ERYAMM-1
Management units: 6, 7
Beginning in 2017, inspect occurrences of coast wallflower on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to record status and to collect habitat and threats covariate data to determine management needs. After 2017, repeat monitoring every 2 years.
Criteria |
Deadline year |
Surveys Completed in 2017, 2019, and 2021 with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG ERYAMM-2
Management units: 6, 7
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring at coastal wallflower occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species =20% absolute cover. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata and management datasets to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Quino checkerspot butterfly Euphydryas editha quino
Goal: Protect, enhance, and restore Quino checkerspot occupied habitat and historically occupied habitat and the landscape connections between them to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
NFO
2017, 2018
SL
MON-DEV-MODL EUPEDI-1
Management units: 3, 4, 6, 9
In 2017-2018, develop habitat suitability models for Quino checkerspot, host plants, and nectaring plants under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Submit project metadata, modeling datasets, results and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Quino Checkerspot Current and Future Climate Habitat Models and Report Completed in 2017 |
2021 |
regional
NFO
2017, 2018, 2019
SL
MON-PRP-MONPL EUPEDI-2
Management units: 3, 4, 6, 9
Beginning in 2017, prepare a long-term Quino checkerspot metapopulation monitoring plan to track population distribution, abundance, and phenology, and to assess habitats and threats at checkerspot occurrences (see occurrence table), historically occupied and unoccupied high suitability sites across Conserved Lands in the MSPA. The monitoring plan should build upon previous surveys, habitat assessments and modeling to include specific monitoring questions, the sampling frame within the MSPA, monitoring methods, a statistically valid sampling design, sampling locations, timeline, and standardized protocols for determining the status and abundance of larval and adult butterflies and for assessing habitat and threats at each sampling site to determine management needs. The plan should stipulate that for each survey year, a report be prepared with site-specific management recommendations. The monitoring plan will be piloted with field surveys in 2018 to determine if adjustments need to be made and will be finalized in 2019 and then added to the final management plan in 2021 to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop the monitoring plan. |
in progress |
|
PRP-2 |
Include fire risk and climate change modeling results to provide management recommendations in relation to fire and climate refugia and to reduce fire risk at occurrences. |
in progress |
|
PRP-3 |
Submit project metadata, datasets and Quino Checkerspot Monitoring Plan to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Quino Checkerspot Metapopulation Monitoring Plan Completed in 2019 |
2019 |
regional
NFO
2017, 2018
SL
MGT-PRP-SBPL EUPEDI-4
Management units: 3, 4, 6, 9
In 2017-2018, develop a section for Quino checkerpot nectaring forbs and host plants in the MSP Seed Collection, Banking and Bulking Plan to enhance and restore habitat for the butterfly. The plan should incorporate best science and management practices (e.g., Wall 2009; KEW 2016) to provide guidelines for collecting and providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds to provide source material with consideration of potential genetic consequences; for management oriented research; seed bulking; and out-planting to augment extant occurrences or establish new occurrences of Quino checkerspot.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Quino checkerspot section in the MSP Seed Collection, Banking and Bulking Plan. |
on hold |
|
PRP-2 |
Design a seed collection plan to collect seeds over multiple years, collect seeds several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines from small occurrences (<1,000 plants) and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. |
waiting for precedent action |
|
PRP-3 |
The seed collection plan should include guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest and based on genetic studies as available. Include provisions for collecting seed from unconserved populations planned for development. |
waiting for precedent action |
|
PRP-4 |
Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). |
waiting for precedent action |
|
PRP-5 |
Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. |
waiting for precedent action |
|
PRP-6 |
Submit project metadata and MSP Seed Collection, Banking and Bulking Plan to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
By end 2017, Completed Quino Checkerspot Section in MSP Seed Collection, Banking and Bulking Plan |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-PRP-MGTPL EUPEDI-6
Management units: 3, 4, 6, 9
In 2017, begin developing an interim 5 year Quino Checkerspot Management Plan that focuses on habitat enhancement and restoration and fire management, and includes the information from the MSP Seed Collection, Banking and Bulking Plan for Quino checkerspot, at known occupied and historically occupied sites. In 2021, update and finalize the management plan with results from the captive rearing and translocation projects and combine with the monitoring plan to create a comprehensive Quino Checkerspot Management and Monitoring Plan.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop prioritized management actions. |
waiting for precedent action |
|
PRP-2 |
Include fire risk and climate change modeling results to provide management recommendations in relation to fire and climate refugia and to reduce fire risk at occurrences. |
waiting for precedent action |
|
PRP-3 |
Submit project metadata and management and monitoring plan to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Quino Checkerspot Management and Monitoring Plan Completed in 2021 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-CAPR EUPEDI-9
Management units: 3, 4, 6, 9
From 2017 to 2021, support existing efforts by the wildlife agencies to collect eggs and captive rear larvae to use in reestablishing and augmenting wild Quino checkerspot populations. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Support the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers, San Diego Zoo Global and other stakeholders to implement the captive rearing. |
in progress |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
in progress |
|
Criteria |
Deadline year |
Captive Rearing Implemented and Report Submitted by 2021 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-TRAN EUPEDI-10
Management units: 3, 4, 6, 9
From 2017 to 2021, support existing efforts by the wildlife agenices to translocate captive bred Quino checkerspot larvae to historically occupied habitat.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Support the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers, San Diego Zoo Global and other stakeholders to implement the translocation project. |
in progress |
|
IMP-1 |
Support the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers, San Diego Zoo Global and other stakeholders to implement the translocation project. |
in progress |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
in progress |
|
Criteria |
Deadline year |
Translocation Implemented by 2020 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-TRAN EUPEDI-11
Management units: 3, 4, 6, 9
From 2017 to 2021, support efforts by the wildlife agencies to monitor the effectivenss of translocated captive bred Quinoo checkerspot larvae. Use results to finalize the Quino Checkerspot Management and Monitoring Plan.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, monitoring data and reportto MSP web portal |
in progress |
|
Criteria |
Deadline year |
Translocation Monitoring Completed and Report Submitted by 2021 |
2021 |
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-FMGT EUPEDI-12
Management units: 3, 4, 6, 9
From 2017 to 2021, implement invasive plant control and other post-fire management actions as needed to ensure the recovery of Quino checkerspot at sites occupied within the last 10 years to facilitate habitat recovery, particularly forbs and host plants after wildfire events.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement needed management actions as determined through BAER or other post fire surveys. |
available for implementation |
|
Criteria |
Deadline year |
Post fire management actions implemented following wildfire events |
2021 |
regional and/or local
POST
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-FMGT EUPEDI-13
Management units: 3, 4, 6, 9
From 2017 to 2021, for at least the first 3 years following a wildfire, monitor recovery of Quino checkerspot occurrences and habitat affected by fire. Use a standardized postfire protocol to document the butterfly's distribution and abundance over time and to characterize habitat recovery and threats following a wildfire. Postfire monitoring should encompass occupied Quino checkerspot sites and unoccupied sites that are important for enhancing connectivity or for future population expansion. The postfire monitoring should identify and prioritize management actions to assist in recovery of Quino checkerspot populations and important habitat patches.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Prepare and implement a postfire habitat monitoring protocol and sampling design to determine the status of Quino checkerspot occurrences and characterize host plant recovery following wildfire. Use the monitoring results to identify management actions to ensure postfire recovery of high quality habitat as identified in the Quino Checkerspot Management and Monitoring Plan. |
On hold |
|
IMP-2 |
Submit project metadata, Quino checkerspot postfire survey and habitat monitoring data, annual reports with management recommendations, and a final report documenting project methods and results to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Monitoring of Quino Checkerspot and Habitats with Annual Management Recommendations |
2021 |
Harbison's Dun Skipper Euphyes vestris
Goal: Protect, enhance, and restore Harbison's dun skipper occupied habitat, historically occupied habitat, and the landscape connections between them to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
NFO
2017, 2020
SL
MON-SURV-SPEC EYPHAR-1
Management units: 3, 4, 5, 6, 8, 11
In 2017 and 2020, conduct host plant (San Diego sedge), adult, larval and hibernaculum surveys, and habitat assessments for Harbison's dun skipper that were initiated in 2013 in the MSPA (see Table of Occurrences) to further document the butterfly's current distribution and population size, define habitat requirements, and to assess habitat and threats at survey sites.
Action |
Statement |
Action status |
Projects |
SURV-1 |
Search for Harvison's dun skipper adults, butterfly hiberniculum, larvae and host plants (San Diego sedge) at known occupied habitat, historically occupied habitat and in suitable potential habitat, to determine the extent of the butterfly's range, population sizes, and to better understand habitat relationships. Use a standardized protocol to collect habitat and threats covariate data at each site for developing and prioritizing management actions. |
In progress |
|
SURV-2 |
Submit project metadata, datasets, analyses and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Harbison's Dun Skipper Surveys and Reports Completed in 2018 and 2021 |
2021 |
regional
NFO
2017
SL
MON-RES-GEN EYPHAR-2
Management units: 3, 4, 5, 6, 8, 11
In 2017, in conjunction with adult surveys and the marking study for Harbison's dun skipper (see Table of Occurrences), capture adult butterflies and collect non-lethal genetic samples (i.e., legs) to analyze population genetic structure, dispersal and connectivity between populations, and genetic diversity. Use the analytical results to develop management recommendations to improve connectivity and to maintain or enhance genetic diversity at Harbison's dun skipper occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use genomic sequencing techniques (e.g., RAD-Seq) to analyze large amounts of Harbison's dun skipper DNA sequences to estimate gene flow, effective population size, and genetic diversity of butterfly occurrences to inform management actions. |
In progress |
|
RES-2 |
Evaluate Harbison's dun skipper movement patterns at multiple scales by considering the results of genetic data analyses at a larger scale between drainages and across the MSPA, in contrast with results from the marking study characterizing intra-habitat, local scale movements within a drainage. Use these results to develop and prioritize management recommendations to include in the Harbison's Dun Skipper Management Plan. |
In progress |
|
RES-3 |
Submit project metadata, datasets, analyses and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Harbison's Dun Skipper Genetic Study and Report Completed in 2017 |
2021 |
regional
NFO
2017
SL
MON-RES-SPEC EYPHAR-3
Management units: 3, 4, 5, 6, 8, 11
In 2017, conduct a marking study of adult Harbison's dun skippers during the flight season to determine connectivity within habitat patches in a watershed. Design the study to obtain information on local movement patterns, flight season phenology, demography, detection probabilities, longevity, individual behavior, nectaring sources, and relationship between maximum counts and local population size. The results of this study should be used to develop specific management recommendations to be incorporated in the Harbison's Dun Skipper Management Plan.
Action |
Statement |
Action status |
Projects |
RES-1 |
Include within the study a site that supports a large, relatively stable population as determined from previous surveys. Capture and mark individuals at the selected site and then revisit and survey 2-3 times per week during the flight season to search for marked individuals and to capture and mark previously unmarked individuals. Locations of all individuals when captured for marking and at all subsequent resightings will be recorded. |
In progress |
|
RES-2 |
The marking study complements the genetics study by providing genetic samples from individuals captured for marking. Both studies are important at evaluating Harbison's dun skipper movement patterns at multiple scales. The results of genetic analyses represent a larger scale between drainages and across the MSPA, in contrast with results from the marking study that characterize intra-habitat, local scale movements within a drainage. These results should be used in developing and prioritizing management actions in the butterfly's 2018 management plan. |
In progress |
|
RES-3 |
Submit project metadata, marking study datasets, analyses and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Harbison's Dun Skipper Marking Study and Report Completed in 2017 |
2021 |
regional
PRE
2017
SL
MON-DEV-MODL EYPHAR-4
Management units: 3, 4, 5, 6, 8, 11
In 2017, develop habitat suitability models for Harbison's dun skipper, the host plant (San Diego sedge), and oak woodlands under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential fire and climate refugia. The results of this modeling will be considered in the development of monitoring and management plans.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Submit project metadata, modeling datasets, results and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Harbison's Dun Skipper Current and Future Climate Habitat Models and Report Completed in 2017 |
2021 |
regional
PRE
2017
SL
MGT-PRP-MGTPL EYPHAR-5
Management units: 3, 4, 5, 6, 8, 11
In 2017, prepare a 5 year Harbison's Dun Skipper Management Plan that includes the results from butterfly surveys and habitat assessments, genetic and marking studies, and climate and fire modeling to characterize habitat quality at occupied occurrences and unoccupied suitable habitat important for enhancing connectivity, expanding populations or that could serve as fire and climate refugia. The plan should include an overall management strategy, identification and prioritization of sites where management is needed, and specific management recommendations for each site. It should also include actions to reduce fire risk at prioritized occurrences and specifications for monitoring the effectiveness of implementing high priority management actions.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop prioritized management actions. |
In progress |
|
PRP-2 |
Submit project metadata and Harbison's Dun Skipper Management Plant to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Harbison's Dun Skipper Management Plan Completed in 2017 |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-FMGT EYPHAR-9
Management units: 3, 4, 5, 6, 8, 11
For at least the first 3 years following a wildfire, monitor recovery of Harbison's dun skipper occurrences and habitat affected by fire. Use a standardized postfire protocol to document the butterfly's distribution and abundance over time and to characterize habitat recovery and threats following a wildfire. Postfire monitoring should encompass occupied dun skipper sites and unoccupied sites that are important for enhancing connectivity or for future population expansion. The postfire monitoring should identify and prioritize management actions to assist in recovery of Harbison's dun skipper populations and important habitat patches.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Prepare and implement a postfire habitat monitoring protocol and sampling design to determine the status of Harbison's dun skipper occurrences and characterize oak woodland and host plant (San Diego sedge) recovery following wildfire. Use the monitoring results to identify management actions to ensure postfire recovery of high quality habitat as identified in the Harbison's Dun Skipper Management Plan. |
On hold |
|
IMP-2 |
Submit project metadata, Harbison's dun skipper postfire survey and habitat monitoring data, annual reports with management recommendations, and a final report documenting project methods and results to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Monitoring of Harbison's Dun Skipper and Habitats with Annual Management Recommendations |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-FMGT EYPHAR-10
Management units: 3, 4, 5, 6, 8, 11
For at least the first 3 years following a fire, implement management actions identified by postfire monitoring as necessary to protect and recover Harbison's dun skipper occurrences and habitat impacted by wildfire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement management actions to restore oak woodland and host plant habitat destroyed by wildfire. These management actions may include planting oaks, host plants, and native nectaring plants. Control invasive plants to to =20% absolute cover to reduce postfire invasion of nonnative plants and to allow postfire recovery of native plants by reducing competition for water and light. Manage erosion and human use impacts while habitat is recoverying. |
On hold |
|
IMP-2 |
Submit project metadata and management actions to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Management in Harbison's Dun Skipper Habitats |
2021 |
Mexican flannelbush Fremontodendron mexicanum
Goal: Maintain or enhance existing Mexican flannelbush occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
regional and/or local
NFO
2017, 2020
SL
MON-IMP-IMG FREMEX-1
Management units: 3
In 2017, inspect Mexican flannelbush occurrences on Conserved Lands (see occurrence table) using the regional IMG monitoring protocol to estimate abundance and collect covariate data on tamarisk and other types of threats, determine management needs. After 2017, repeat monitoring every 3 years, unless an occurrence is small (<100 individuals) or faces a high degree of threat, in which case monitor annually.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Surveys Completed 2017 and 2020 with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG FREMEX-2
Management units: 3
Beginning in 2017, continue routine management actions identified through the IMG monitoring that began in 2014 at Mexican flannelbush occurrences on Conserved Lands (see occurrence table) . Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
grassland
Goal: Enhance and restore native grasslands and forblands and manage nonnative grasslands on Conserved Lands in the MSPA that support or have the potential to support VF species (i.e., grasshopper sparrow and San Diego black-tailed jackrabbit) and to incidentally benefit a diverse array of other species (e.g., Quino checkerspot, burrowing owl, golden eagle, Stephen's kangaroo rat) so that the vegetation communities have high ecological integrity, and these species are resilient to environmental stochasticity and will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2018, 2019
MON-PRP-MONPL GRASSL-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, prepare a long-term monitoring plan for the mosaic of chaparral, coastal sage scrub and grassland vegetation communities that focuses on tracking community composition, structure and ecological integrity over time in relation to climate (i.e., drought) and disturbance from fire. The monitoring plan should include a conceptual model, specific monitoring questions, the sampling frame within the MSPA, monitoring methods, a statistically valid sampling design, permanent sampling locations, timeline, and standardized protocols. Use the landscape-scale ecological integrity classification map to develop a sampling frame and the sampling design with permanent sampling plots spanning north to south and east to west environmental gradients across the MSPA. Evaluate how the vegetation integrity classes characterize other aspects of the ecosystem by integrating other types of monitoring into the long-term sampling plots, such as abiotic element monitoring (e.g., automated weather stations and soil sensors, GIS-data layers), ecological integrity monitoring (e.g., plant and animal communities, ecological processes), MSP VF species monitoring, and threats monitoring (e.g., fire, climate change, invasive plants). A draft monitoring plan should be prepared in 2017, tested in the field with a pilot study in 2018, and finalized by 2019.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Establish a vegetation monitoring working group of scientists, wildlife agencies, land managers, and other stakeholders to participate in developing the vegetation monitoring plan. The group should also include interested parties from outside the MSPA, such as representatives from other multiple species plans in Orange and Riverside Counties and from San Diego County military bases, to create a regional monitoring program with greater efficiencies in effort and a broader inference across southern California. |
In progress |
|
PRP-2 |
Submit project metadata, datasets, analyses, and Chaparral, Coastal Sage Scrub, and Grassland Monitoring Plan to the MSP web portal |
In progress |
|
Criteria |
Deadline year |
Chaparral, Coastal Sage Scrub and Grassland Vegetation Monitoring Plan completed by 2019 |
2021 |
Regional
NFO
2017, 2018, 2019, 2020, 2021
MON-DEV-MAP GRASSL-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017, develop a landscape-scale map classifying ecological integrity of shrublands across the MSPA based upon shrub cover and density and invasive nonnative annual grasses using remote imagery (e.g., satellite and high resolution aerial imagery, LIDAR) and vegetation data collected during 2015-2016 California gnatcatcher regional and postfire monitoring. Verify and revise the mapping as needed using field data collected in 2018-2020 as part of the Chaparral, Coastal Sage Scrub and Grassland Monitoring Program and from related VF species monitoring (e.g., California gnatcatcher regional and postfire monitoring). Revise the integrity classification map as needed to respond to changes in vegetation based upon wildfires, drought or other large-scale disturbances.
Criteria |
Deadline year |
Ecological Integrity Map created in 2017 and updated as needed 2018-2021 |
2021 |
Orcutt's hazardia Hazardia orcuttii
Goal: Maintain or enhance existing Orcutt's hazardia occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral and coastal sage scrub vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG HAZORC-2
Management units: 6, 7
Beginning in 2017, conduct routine management actions identified through 2016, 2018 and 2020 IMG monitoring of Orcutt's hazardia occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SL
MGT-PRP-SBPL HAZORC-3
Management units: 6, 7
In 2017, begin preparing an Orcutt's hazardia section in the MSP Seed Collection, Banking and Bulking Plan to preserve genetic diversity and rescue occurrences in case of catastrophic disturbance. The plan should incorporate best science and management practices (Wall 2009, KEW 2016) and recommendations from the 2014 genetic study to provide guidance for collecting and storing seeds over the long term at a permanent, established conservation seed bank (e.g., Institute for Conservation Research Native Plant Seed Bank, Rancho Santa Ana Botanic Garden Seed Conservation Program) and for providing a source of seeds for management purposes. The plan should include recommendations for: collecting and storing seeds for conservation banking; management oriented research; rescuing occurrences after catastrophic disturbances; and seed bulking and out-planting to augment extant occurrences or to establish new occurrences with consideration of genetic implications for population sustainability.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's hazardia section in the MSP Seed Collection, Banking and Bulking Plan. |
Available for implementation |
|
PRP-2 |
Design the seed collection plan to include recommendations to collect seeds over multiple years and several times within a season, accumulate seeds across populations, and to sample among habitats and ecological niches. Include guidelines for collecting and storing seeds along maternal lines and to provide propagules to be used in management experiments, enhancement of existing occurrences, and establishment of new occurrences. |
Available for implementation |
|
PRP-3 |
The seed collection plan should have guidelines for collecting seeds from occurrences of sufficient size to accommodate harvest. Include provisions for collecting seed from unconserved populations planned for development. |
Available for implementation |
|
PRP-4 |
Include protocols and guidelines for collecting voucher specimens and submitting to the San Diego Natural History Museum (McEachern et al. 2007). |
Available for implementation |
|
PRP-5 |
Include guidelines for testing seeds for viability and to obtain information on dormancy and germination rates. |
Available for implementation |
|
PRP-6 |
Submit project metadata and the MSP Seed Collection, Banking and Bulking Plan to MSP Web Portal. |
Available for implementation |
|
Criteria |
Deadline year |
By 2018, Completed Orcutt's Hazardia Section in the MSP Seed Collection, Banking and Bulking Plan |
2021 |
regional
NFO
2017
SL
MGT-PRP-MGTPL HAZORC-5
Management units: 6, 7
In 2017, begin preparing an Orcutt's hazardia section in the MSP Rare Plant Management Plan that prioritizes management actions to maintain or enhance occurrences on Conserved Lands (see occurrence table) based upon an assessment of data on occurrence status, habitat and threats. Minimum criteria for enhancement are to reduce invasive annual nonnative plants and thatch to less than 20% absolute cover within the occurrence
Action |
Statement |
Action status |
Projects |
PRP-1 |
Consult the San Diego County Rare Plant Working Group made up of plant ecologists, geneticists, rare plant experts, land managers, restoration practitioners, seed banking and bulking practitioners, wildlife agencies, and other stakeholders to provide input and recommendations for the Orcutt's brodiaea section in the MSP Rare Plant Management Plan. |
available for implementation |
|
PRP-2 |
Develop a conceptual model that identifies management actions to effectively reduce threats to Orcutt's hazardia occurrences. |
available for implementation |
|
PRP-3 |
Prioritize occurrences for management based upon an assessment of occurrence status, the potential for management to significantly reduce identified threats, and the availability of adjacent suitable habitat for occurrence expansion. |
available for implementation |
|
PRP-4 |
Develop an implementation plan for Orcutt's hazardia that prioritizes management actions for the next 5 years and details tasks, lead entities, responsibilities, and timelines, budgets. |
available for implementation |
|
PRP-5 |
Submit project metadata and MSP Rare Plant Management Plan to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
By 2018, Completed Orcutt's Hazardia Section in MSP Rare Plant Management Plan |
2021 |
Human uses of the Preserves
Goal: The goal for managing human use of preserves is to understand and reduce the impacts of human uses on Conserved Lands where human use is reducing the population levels and/or viability of MSP species populations.
regional
NFO
2017, 2018, 2019, 2020, 2021
MON-RES-SPEC HUMUSE-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017-2021, continue supporting the ongoing research on recreation and wildlife led by Colorado State University and the Wildlife Conservation Society.
Action |
Statement |
Action status |
Projects |
RES-1 |
Submit project metadata, data, and report to MSP web portal. |
In progress |
|
Criteria |
Deadline year |
Research data submitted to MSP web portal within one year of project completion. |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
MGT-RSUP-ENF HUMUSE-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017-2021, support jurisdictions to develop and implement local enforcement programs for the protection of natural resources on Conserved Lands.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Provide funding support to jurisdictions to develop and implement local enforcement programs that are suited for Conserved Lands they are responsible for managing. |
In progress |
|
RSUP-2 |
Submit project metadata, data, and report to MSP web portal. |
In progress |
|
Criteria |
Deadline year |
=1 Local Enforcement Programs Implemented starting in 2017 |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-BMP HUMUSE-3
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, implement biosecurity measures from existing BMPs (e.g. bleaching equipment between stream surveys, brushing invasive seeds off field boots, etc) during biological surveys and land management activities (e.g. disking, creating fuel breaks) to prevent the unintentional spread of invasive species (i.e. exotic plants and animals) and diseases (e.g. chytrid fungus).
Action |
Statement |
Action status |
Projects |
IMP-1 |
Identify the different types of activities (e.g. biological surveys, disking, fuel breaks, etc) on each preserve that may result in the unintentional introduction of invasive species (i.e. exotic plants and animals) and/or disease (e.g. chytrid fungus) and that can be reasonably controlled using existing BMPs (e.g. bleaching equipment between stream surveys, brushing invasive seeds off field boots, etc). |
|
|
IMP-2 |
Research and begin implementing available biosecurity BMPs as approproate. |
|
|
Criteria |
Deadline year |
=1 Biosecurity BMP Implemented in the MSPA by 2018 |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-BMP HUMUSE-4
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, limit or restrict passive recreation uses within Important Management Areas and/or significant occurrences of MSP species during the breeding season for animals and peak growing season for plants and minimize adverse effects from vegetation trampling, erosion, and trash.
Criteria |
Deadline year |
Restrictions on Passive Recreation Implemented for the Protection of MSP Resources |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-BMP HUMUSE-5
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, establish Recreational Area Patrols to assist in identifying and reporting to land managers and rangers any incompatible uses of the preserve that impact natural resources.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Coordinate with land managers who are implementing Recreational Area Patrols to learn how to create a patrol system for other preserves. |
|
South San Diego County Community Outreach |
Criteria |
Deadline year |
At least 1 new Recreational Patrol Program Implemented starting in 2018 |
2021 |
Invasive animals
Goal: The overarching goals for addressing invasive animal species in the MSPA are: (1) Protect intact, unspoiled habitat from new or expanding invasive animal species; (2) Detect new invasive species and new invasions early on and control them before they have a chance to establish; (3) Address invasive species using the response appropriate for the level of invasiveness ensuring higher priority invasive animal species are addressed first
regional
NFO
2017, 2018
MGT-PRP-IAPL INVANI-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Starting in 2017, prepare an invasive animal management plan for all invasive animals potentially in the MSPA (including but not limited to Argentine ants, GSOB, SHB, invasive aquatic animals, brown-headed cowbirds, and feral cats) with a categorization of threat level and impact to MSP species and prioritization of management actions.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Coordinate with land managers and other invasive animal agencies to identify existing and potential invasive animals in the MSPA and surrounding regions and categorize their threat and impact to MSP species and habitats. |
In progress |
|
PRP-2 |
The invasive animal management strategy should prioritize management actions for the next five years and detail tasks, lead entities, responsibilities, timelines, and budgets |
In progress |
|
PRP-3 |
Submit invasive animal management plan to MSP web portal |
waiting for precedent action |
|
Criteria |
Deadline year |
Invasive Animal Plan for the MSPA completed by end 2018. |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MGT-RSUP-PIG INVANI-4
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, continue to support the existing feral pig eradication program.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Continue coordinating with the regional entity leading the feral pig eradication program and provide support as needed and appropriate. |
In progress |
|
Criteria |
Deadline year |
Evidence of Feral Pigs Eradicated from the MSPA by 2021 |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-SHBMPL INVANI-5
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, implement the regional SHB management strategy in coordination with federal, state, and local partners.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Continue coordinating with the regional entity leading the shot hole borer program, implement the SHB strategy, and provide support as needed and appropriate. |
In progress |
Shot Hole Borer Surveys and Management Techniques |
Criteria |
Deadline year |
By 2021, =2 High Priority Management Action Implemented from the SHB Strategy |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MON-IMP-SHBMPL INVANI-6
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, monitor the effectiveness of implementation of the SHB management strategy
Criteria |
Deadline year |
Effectiveness of High Priority Management Actions Determined |
2021 |
Invasive plants
Goal: The overarching goals for addressing invasive plant species in the MSPA are to: (1) Protect Conserved Lands from new or expanding invasive plant species; (2) Detect new invasive species and new invasions early on and control them before the plants have a chance to establish; (3) Address invasive species using the response appropriate for the level of invasiveness (level 1 through 5) as defined in the Invasive Plant Strategic Plan (IPSP)
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-IPSP INVPLA-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, continue implementing the IPSP by removing Levels 1, 2, and 3 invasive plant species before their distribution becomes too abundant to control.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Continue to provide funding and support to the existing County of San Diego AWM effort to implement the IPSP and remove and control Level 1, 2, and 3 invasive plant species within the MSPA. |
In progress |
Oncosiphon Pilulifer (Stinknet) Management, Regional Invasive Plant Management, Crest Canyon Invasvive Plant Control Project, Riparian Restoration and Arundo Removal, Veldt Grass Removal - San Elijo Lagoon Ecological Reserve, Invasive Plant Control - Silverwood Wildlife Sanctuary, North County Dunes Restoration |
IMP-2 |
Work with San Diego County AWM to update the annual Work Plan and include new Level 1, 2, or 3 invasive species encountered that are determined to need priority management using the same criteria as the IPSP. |
In progress |
Oncosiphon Pilulifer (Stinknet) Management, Regional Invasive Plant Management, Crest Canyon Invasvive Plant Control Project, Riparian Restoration and Arundo Removal, Veldt Grass Removal - San Elijo Lagoon Ecological Reserve, Invasive Plant Control - Silverwood Wildlife Sanctuary, North County Dunes Restoration |
IMP-3 |
Submit project metadata, data, and report to MSP web portal |
In progress |
Oncosiphon Pilulifer (Stinknet) Management, Crest Canyon Invasvive Plant Control Project, Riparian Restoration and Arundo Removal, Veldt Grass Removal - San Elijo Lagoon Ecological Reserve, Invasive Plant Control - Silverwood Wildlife Sanctuary, North County Dunes Restoration |
Criteria |
Deadline year |
Reduction in =50% of the IPSP Levels 1 and 2 Species by 2021 |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MON-IMP-IPSP INVPLA-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Starting in 2017, using a quick assessment, monitor the effectiveness of implementation of the IPSP.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, data, and report to MSP web portal |
In progress |
|
Criteria |
Deadline year |
Effectiveness of IPSP Implementation Determined |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MGT-RSUP-IPSP INVPLA-3
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Starting in 2017, pursue outside funding for Level 3 invasive plants species (e.g. arundo) to control them at a watershed level.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Coordinate with local agencies to pursue state and federal funding/grant options for the control of Level 3 species. |
available for implementation |
|
Criteria |
Deadline year |
At Least 1 Proposal Submitted for Outside Funding for Level 3 Species by 2019 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MGT-RSUP-EDRR INVPLA-5
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, develop and adopt an Early Detection and Rapid Response (EDRR) strategy and database for the MSPA that includes the ability for land managers and Citizen Scientists to report invasive plant sightings using handheld devices to feed into a system of review and management action.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Create and maintain a watchlist for known or expected invasive in the MSPA |
Available for implementation |
|
RSUP-2 |
Develop an EDRR database for reporting and monitoring invasive species action in the MSPA |
Unknown |
|
RSUP-3 |
Generate EDRR reporting, treatment, and control protocol for land managers |
Unknown |
|
Criteria |
Deadline year |
An EDRR Program Developed by 2021 |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-IPSP INVPLA-7
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, remove Level 4 and 5 invasive species that are threatening MSP species as specified in the Invasive Plant Strategic Plan.
Criteria |
Deadline year |
Project reports submitted within 1 Year of Removal Efforts |
2021 |
Heart-leaved pitcher sage Lepechinia cardiophylla
Goal: Maintain or enhance existing heart-leaved pitcher sage occurrences and establish new occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral and oak woodland vegetation communities.
Regional and/or Local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG LEPCAR-1
Management units: 4, 5, 8
If extant occurrences of heart-leaved pitcher sage are discovered on Conserved Lands in 2017-2021, inspect the occurrences and repeat monitoring every 2 years. Use a regional monitoring protocol to record population abundance and collect habitat and threats covariate data to determine management needs.
Criteria |
Deadline year |
If Extant Occurrences Found on Conserved Lands, Surveys Completed Every 2 Years with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG LEPCAR-2
Management units: 4, 5, 8
If heart-leaved pitcher sage occurrences are found on Conserved Lands, conduct routine management actions identified through the IMG monitoring. Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to less than 20% absolute cover. |
waiting for precedent action |
|
Criteria |
Deadline year |
If Extant Occurrences Found on Conserved Lands, Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Loss of connectivity
Goal: The overarching and interrelated goals for protecting and restoring connectivity amongst core habitat areas within the MSPA and other regional conservation areas are to: (1) Ensure the persistence of species across the preserve system and (2) Maintain ecosystem functions across the landscape.
regional
NFO
2017, 2018
MON-EVAL-LINK LOSCON-1
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Complete linkage evaluations and conduct new evaluations/designs in priority linkages in all MUs by completing GIS modelling and field based assessments.
Action |
Statement |
Action status |
Projects |
EVAL-1 |
Review methods, results, and recommendations from linkage evaluations previously conducted, refine methods as necessary, and complete recommended follow-up surveys. |
In progress |
|
EVAL-2 |
Complete GIS office-based assessments and/or modelling and field assessments for remaining priority linkages. |
In progress |
|
EVAL-3 |
Prepare or update linkage evaluations and recommendations for each linkage to inform Linkage Implementation Plans and submit to MSP web portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Linkage Evaluations completed by 2018 |
2021 |
regional
NFO
2017, 2018
MGT-EVAL-LINK LOSCON-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Based on linkage evaluations, prioritize linkages for implementation action
Action |
Statement |
Action status |
Projects |
EVAL-1 |
Prioritize linkages based on regional importance, level of threat, and species and habitats supported. |
waiting for precedent action |
|
Criteria |
Deadline year |
Priority Linkages Identified by 2018 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-LINKPL LOSCON-4
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, implement linkage enhancement actions outlined in completed linkage evaluations and linkage implementation plans
Action |
Statement |
Action status |
Projects |
IMP-1 |
As funding becomes available, implement actions based on monitoring studies and Linkage Implementation Plans to improve connectivity for target species, including maintaining culverts, installing directional wildlife fencing, restoration, and land acquisition. |
waiting for precedent action |
|
IMP-2 |
Submit project metadata, management datasets, and report to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Linkage improvement recommendations implemented for priority linkages by 2021 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MON-IMP-LINKPL LOSCON-5
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Monitor effectiveness of enhancement actions implemented to improve connectivity for target species at priority linkages.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, monitoring datasets, analyses and report with management recommendations to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Linkage enhancement monitoring reports submitted |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020
MGT-IMP-SR94PL LOSCON-6
Management units: 3, 11
Beginning in 2017, begin implementation of high priority pre-construction connectivity monitoring and management actions identified in the SR 94 Wildlife Infrastructure Plan (CBI 2015) and use this information in discussions with Caltrans on the design and location of wildlife infrastructure improvements.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Distinguish range of actions identified in SR 94 Wildlife Infrastructure Improvement Plan that can be implemented in advance of SR 94 improvements, such as wildlife fencing, culvert maintenance, or habitat restoration. |
available for implementation |
|
IMP-2 |
Work with Caltrans to discuss and evaluate locations and designs for wildlife crossing structures to inform road improvement design studies and plans as they are initiated. |
available for implementation |
|
Criteria |
Deadline year |
Wildlife connectivity enhancements (fencing, culvert maintenance, restoration) initiated along SR 94 by 2020 |
2021 |
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MON-IMP-SR94PL LOSCON-7
Management units: 3, 11
Monitor effectiveness of actions implemented to improve connectivity for target species across SR-94.
Action |
Statement |
Action status |
Projects |
IMP-1 |
.Submit project metadata, monitoring datasets, analyses and report with management recommendations to the MSP Web Portal. |
Available for implementation |
|
Criteria |
Deadline year |
Linkage enhancement monitoring reports submitted |
2021 |
local
NFO
2017, 2018
MGT-PRP-SR67PL LOSCON-8
Management units: 4, 5
Work with Caltrans to use results of monitoring studies on SR 67 to identify design specifications and precise locations for wildlife underpasses (and necessary directional fencing) of adequate size, design and orientation for deer, mountain lion and small animals along high priority areas of SR 67. As part of this effort, identify land protection needs to further protect connectivity across SR 67.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Use connectivity monitoring data and modelling to complete SR 67 Wildlife Infrastructure Improvement Plan, which will include specific siting recommendations for the location of wildlife crossing structures, along with identification of structure type and design criteria. |
waiting for precedent action |
|
PRP-2 |
Identify several options for locations and structure type for each crossing to allow transportation engineers flexibility. |
waiting for precedent action |
|
PRP-3 |
Prioritize lands for potential acquisition from willing sellers that retain connectivity across SR-67 and in the surrounding area. |
waiting for precedent action |
|
Criteria |
Deadline year |
Wildlife Infrastructure Improvement Plan completed for SR 67 by 2018 |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
MGT-IMP-SR67PL LOSCON-9
Management units: 4, 5
Implement high priority pre-construction connectivity monitoring and management actions in SR67 Wildlife Infrastructure Plan.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Distinguish range of actions identified in SR 67 Wildlife Infrastructure Improvement Plan that can be implemented in advance of SR 67 widening improvements, such as wildlife fencing, culvert maintenance, habitat restoration, or land acquisition. |
waiting for precedent action |
|
IMP-2 |
Submit project meta data and management actions and reports to MSP web portal |
waiting for precedent action |
|
Criteria |
Deadline year |
Wildlife connectivity enhancements (fencing, culvert maintenance, restoration, land acquisition) initiated along SR 67 by 2020 |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
MON-IMP-SR67PL LOSCON-10
Management units: 4, 5
Monitor effectiveness of actions implemented to improve connectivity for target species across SR-67.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, monitoring datasets, analyses and report with management recommendations to the MSP Web Portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Linkage enhancement monitoring reports submitted to MSP web portal |
2021 |
regional and/or local
NFO
2017, 2018
MON-PRP-MONPL LOSCON-12
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Develop Quantitative linkage monitoring approach using best available science to document wildlife use, and to identify threats and management actions to enhance connectivity for priority linkages and prepare a monitoring plan.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Utilize data from USGS, CBI, SDSU, UCD-WHC and SDTT studies to compare detection of species and develop a long-term quantitative monitoring strategy to document wildlife use of priority linkages and chokepoints. |
Available for implementation |
|
PRP-2 |
Integrate monitoring efforts and data from other regional monitoring efforts where there is overlap, as appropriate (SDTT, Feral Pig monitoring program, SR 67 Study, other species specific connectivity monitoring). |
Available for implementation |
|
PRP-3 |
Submit meta data, data and monitoring plan to MSP web portal. |
Available for implementation |
|
Criteria |
Deadline year |
Linkage Monitoring Plan in place by 2018 |
2021 |
regional
NFO
2017, 2018
MON-PRP-MONPL LOSCON-14
Management units: 3, 4, 5, 6, 8, 9, 10
Work with land managers and Caltrans to develop and qualitative "Inspect and Manage" monitoring methods for priority wildlife undercrossings and choke points.
Action |
Statement |
Action status |
Projects |
PRP-1 |
\Work with land managers and Caltrans to identify goals and review previous undercrossing evaluation strategies. |
Available for implementation |
|
PRP-2 |
Identify additional parameters to be incorporated into regular assessments, test methods in the field, and revise methods as necessary. |
Available for implementation |
|
PRP-3 |
Submit project metadata and monitoring plan to MSP web portal. |
Available for implementation |
|
Criteria |
Deadline year |
Qualitative "Inspect and Manage" Linkage Monitoring designed and under implementation by landowners and Caltrans, where feasible, in 2018 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MON-EVAL-LINK LOSCON-16
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Starting in 2017, conduct bi-annual regional spatial assessment to identify how changes in land use have altered permeability of Cores and Linkages using available GIS land cover data. Use results to update connectivity objectives and priorities
Action |
Statement |
Action status |
Projects |
EVAL-1 |
Conduct semi-annual spatial assessments using available GIS, aerial imagery, satellite imagery, habitat suitability/climate/land facet modelling, land use and vegetation data to document how urbanization, infrastructure, and agricultural expansion are altering habitat intactness and connectivity across the MSPA, particularly in important connectivity areas. |
Available for implementation |
Dam's test project |
EVAL-2 |
Use results of regional assessments to re-evaluate connectivity objectives as they relate to habitat restoration, land acquisition, and road infrastructure needs. |
Available for implementation |
Dam's test project |
EVAL-3 |
Submit project metadata, GIS datasets and report to MSP web portal. |
Available for implementation |
|
Criteria |
Deadline year |
Regional spatial assessment of landscape permeability of cores and linkages completed in 2017 and again in 2019 |
2021 |
regional
NFO
2015, 2016, 2017, 2018, 2019, 2020, 2021
MGT-RSUP-LINK LOSCON-17
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Continue participation in regional efforts (Tri-County Habitat Connectivity Coalition) to prioritize habitat linkages and secure policy and funding in support of habitat connectivity improvements in the 3 county area.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Participate in twice yearly meetings to ensure that MSP linkages are identified as Regional Linkage Priorities. |
In progress |
|
RSUP-2 |
Participate in regional efforts to seek state and federal policy and funding for habitat connectivity. |
In progress |
|
Criteria |
Deadline year |
Tri County Connectivity Group successful in seeking regional cooperation and funding for connectivity by 2021 |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
MGT-RSUP-WRWG LOSCON-18
Management units: 3, 4, 5, 6, 8, 9, 10, 11
Develop a Wildlife and Roads Working Group to initiate regular communication on wildlife connectivity issues and to identify status of potential road improvement plans for priority highways and roads that pose a threat to connectivity. Identify opportunities for integrating wildlife movement studies into road planning to inform the design and placement of wildlife crossing infrastructure.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Develop and maintain a list of potential road improvement projects within the MSPA and identify and prioritize those that the group should focus on to maintain or enhance connectivity. |
Available for implementation |
|
RSUP-2 |
Submit meeting minutes and list of priority road improvement projects to MSP web portal. |
Available for implementation |
|
Criteria |
Deadline year |
Wildlife and Roads Working Group first meeting held in 2017 |
2021 |
Hermes copper Lycaena hermes
Goal: Protect, enhance, and restore Hermes copper occupied habitat and historically occupied habitat and the landscape connections between them to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
POST
2017, 2018, 2019
SL
MON-SURV-SPEC LYCHER-1
Management units: 2, 3, 4, 6, 10, 11
In 2017-2019, continue surveys for adult Hermes copper (see occurrence table) and habitat assessments begun in 2016 to document the butterfly's current distribution and abundance and to assess habitat and threats at survey sites. Prepare site-specific management recommendations based on survey results and habitat assessments.
Action |
Statement |
Action status |
Projects |
SURV-1 |
Search for adult Hermes copper butterflies and host plants (spiny redbery) at known occupied habitat, historically occupied habitat, habitat recovering from wildfire, and suitable habitat with potential to support the butterfly to determine the extent of the range, population sizes, and to better understand habitat relationships. Use a standardized protocol to collect habitat and threats covariate data at each site for developing and prioritizing management actions. |
in progress |
|
SURV-2 |
Submit project metadata, datasets, analyses and report with management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Hermes Copper Surveys and Reports Completed in 2017 and 2018 |
2021 |
regional
POST
2017, 2018, 2019
SL
MGT-IMP-TRAN LYCHER-2
Management units: 2, 3, 4, 6, 10, 11
From 2017 to 2019, continue Hermes Copper translocation experiments begun in 2014 to test the effectiveness of releasing eggs and larvae to repopulate the Hollenbeck Canyon Wildlife Area (see Table of Occurrences) where the original population was extirpated by fire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Continue releasing Hermes copper eggs at Hollenbeck Canyon Wildlife Area where the butterfly was extirpated in 2017, to see if translocation success can be improved under normal rainfall conditions. Nine of 14 larvae emerged in 2015 from translocated eggs and 1 adult was observed in 2016, despite the prolonged and intense drought. |
In progress |
|
Criteria |
Deadline year |
Hermes Copper Translocation Experiments Completed in 2019 |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-TRAN LYCHER-3
Management units: 2, 3, 4, 6, 10, 11
From 2017 to 2021, continue monitoring the effectiveness of Hermes Copper translocation experiments begun in 2014 at Hollenbeck Canyon Wildlife Area (see Table of Occurrences). Extend the monitoring for 2 years after the last egg is translocated to determine whether a population has been established.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit project metadata, monitoring datasets, analyses and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Hermes Copper Translocation Monitoring and Reports Completed Annually |
2021 |
regional
NFO
2017
SL
MGT-DEV-BMP LYCHER-4
Management units: 2, 3, 4, 6, 10, 11
In 2017, continue development of BMPs begun in 2013 for captive rearing Hermes Copper at the San Diego Zoo. Attempt to determine optimal conditions for rearing Hermes copper in captivity to provide a source of butterflies for translocations to re-establish populations at sites where the butterfly has been extirpated or to establish new populations in suitable habitat.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Submit project metadata, datasets, and report with management recommendations to the MSP Web Portal. |
on hold |
|
Criteria |
Deadline year |
Hermes Copper Captive Rearing Experiments and Report Completed by 2018 |
2021 |
regional
PRE
2017
SL
MON-DEV-MODL LYCHER-5
Management units: 2, 3, 4, 6, 10, 11
In 2017, develop habitat suitability models for Hermes copper and the host plant (spiny redberry), and the primary nectaring plant (California buckwheat) under current and future climate change scenarios, and conduct fire risk modeling with different management scenarios to identify potential climate and fire refugia. The results of this modeling will be used to inform development of monitoring and management plans for this butterfly.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Submit project metadata, modeling datasets, results and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Hermes Copper Current and Future Climate Habitat Models and Report Completed in 2017 |
2021 |
regional
PRE
2017
SL
MGT-PRP-MGTPL LYCHER-6
Management units: 2, 3, 4, 6, 10, 11
In 2017, complete a 5 year Hermes Copper Management Plan that includes the results from butterfly surveys and habitat assessments and genetic, marking and translocation studies to develop a management strategy and to identify and prioritize site specific management actions. The plan should employ the modeling results to identify potential fire and climate refugia that may be suitable sites for future translocations and provide specific recommendations for reducing fire risk at occurrences at highest risk.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Work with the Butterfly Working Group consisting of species experts, scientists, wildlife agencies, land managers and other stakeholders to develop prioritized management actions. |
completed |
|
PRP-2 |
Include fire risk and climate change modeling results to provide management recommendations in relation to fire and climate refugia and to reduce fire risk at occurrences. |
completed |
|
PRP-3 |
Submit project metadata and Herme's Copper Management Plant to the MSP Web Portal. |
completed |
|
Criteria |
Deadline year |
Hermes Copper Management Plan Completed in 2017 |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-FMGT LYCHER-12
Management units: 2, 3, 4, 6, 10, 11
For at least the first 3 years following a wildfire, use a standardized survey protocol to determine the status of Hermes copper occurrences impacted by fire. Use a standardized postfire protocol to collect vegetation and other covariates important in characterizing Hermes copper habitat recovery following a fire. Postfire monitoring should include collecting habitat recovery data at unoccupied sites that are important for enhancing connectivity or for future population expansion. Identify and prioritize management actions to recover Hermes copper populations and important habitat patches.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Prepare and implement a postfire habitat monitoring protocol and sampling design to determine the status of Hermes copper and characterize coastal sage scrub, host plant (spiny redberry), and nectar plant (California buckwheat) recovery following wildfire. Use the monitoring results to identify management actions to facilitate postfire recovery of high quality habitat at occupied sites and at unoccupied sites important for Hermes copper population expansion and connectivity between occurrences. |
On hold |
|
IMP-2 |
Submit project metadata, Hermes copper postfire survey and habitat monitoring data, annual reports with management recommendations, and a final report documenting project methods and results to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Monitoring of Hermes Copper and Habitats with Annual Management Recommendations |
2021 |
regional
POST
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-FMGT LYCHER-13
Management units: 2, 3, 4, 6, 10, 11
For at least the first 3 years following a fire, implement management actions identified by postfire monitoring as necessary to protect and rehabilitate high quality habitat to allow for recovery of Hermes copper occurrences impacted by wildfire.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement management actions to restore coastal sage scrub, host plants (spiny redberry) and nectaring plants (California buckwheat) at Hermes copper habitats destroyed by wildfire. These management actions may include planting host plants, nectaring plants, and controlling invasive plants to to =20% absolute cover to reduce postfire invasion of nonnative plants and to allow postfire recovery of native plants by reducing competition for water and light. Control erosion and human use impacts while habitat is recoverying. |
On hold |
|
IMP-2 |
Submit project metadata and management actions to the MSP Web Portal. |
On hold |
|
Criteria |
Deadline year |
At Least 3 Years of Postfire Management in Hermes Copper Habitats |
2021 |
Jennifer's monardella Monardella stoneana
Goal: Maintain or enhance existing Jennifer's monardella occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral, riparian forest and scrub, and southern interior cypress forest vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG MONSTO-2
Management units: 3
Beginning in 2017, conduct routine management actions identified through the IMG monitoring at Jennifer's monardella occurrences in 2016 and 2019 on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities as needed, such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP web portal |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Willowy monardella Monardella viminea
Goal: Maintain or enhance existing willowy monardella occurrences and establish new occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in coastal sage scrub vegetation communities.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
SL
MON-IMP-IMG MONVIM-1
Management units: 4, 6
From 2017-2021, inspect willowy monardella occurrences annually on Conserved Lands (see occurrence table) using the regional rare plant IMG monitoring protocol to record abundance and collect habitat and threats covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
available for implementation |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Surveys Completed Annually with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SL
MGT-IMP-IMG MONVIM-2
Management units: 4, 6
Beginning in 2017, conduct routine management actions identified through the annual IMG monitoring at willowy monardella occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species =20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional
NFO
2017
SL
MON-RES-GEN MONVIM-3
Management units: 4, 6
In 2017, complete the study begun in 2016 to characterize the population genetic structure, gene flow, and genetic diversity for willowy monardella occurrences (see occurrence table). The study will determine if there is evidence of mixed ploidy levels within or among occurrences; evaluate vulnerability of occurrences to genetic drift and loss of genetic diversity; assess the level of gene flow among occurrences; identify if there are signatures of genetic bottlenecks or low genetic diversity in occurrences that have undergone recent reductions; and look for evidence of local population adaptation. Based on the results of the genetic analyses, management recommendations will include whether common garden and reciprocal transplantations are necessary before proceeding with population enhancement or restoration and will provide specific recommendations for collecting and redistributing or bulking seed to enhance existing occurrences or establish new occurrences.
Action |
Statement |
Action status |
Projects |
RES-1 |
Use BMPs to collect plant material for genetic samples at willowy monardella occurrences in the MSPA. |
In progress |
|
RES-2 |
Hold a workshop of scientists, rare plant experts, and land managers to develop management recommendations based upon the results of genetic analyses. |
In progress |
|
RES-3 |
Evaluate the overall long-term genetic trajectory for willowy monardella. |
In progress |
|
RES-4 |
Submit project metadata, genetic datasets and analyses, and report with management recommendations to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Genetic Study with Management Recommendations Completed in 2017 |
2021 |
Dehesa nolina Nolina interrata
Goal: Maintain or enhance existing Dehesa beargrass occurrences and establish new occurrences, as needed, to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
regional and/or local
NFO
2017
SO
MON-IMP-IMG NOLINT-1
Management units: 3
Beginning in 2017 and continuing every 5 years, thereafter, continue inspections of Dehesa beargrass occurrences on Conserved Lands (see occurrence table) begun in 2014 using the IMG regional monitoring protocol to record abundance/map perimeters and collect threats and covariate data to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Based upon occurrence status and threats, determine management needs including whether routine management or more intensive management is warranted. |
in progress |
|
IMP-2 |
Submit project metadata, monitoring datasets and management recommendations to the MSP Web Portal. |
in progress |
|
Criteria |
Deadline year |
Surveys Completed in 2017 with Management Recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG NOLINT-2
Management units: 3
Beginning in 2017, conduct routine management actions begun in 2014 identified through the IMG regional protocol monitoring on Conserved Lands. Depending on the type and level of threat, management should only be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species to less than 20% relative cover. |
some occurrences are in progress |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
some occurrences are in progress |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional and/or Local
NFO
2017
SO
MGT-DEV-BMP NOLINT-3
Management units: 3
By 2017, refine BMPs for Dehesa beargrass based on results of experimental management studies currently in progress, as well as research studies. Submit all data and reports to MSP web portal.
Action |
Statement |
Action status |
Projects |
DEV-1 |
Refine BMPs by incorporating results of management experiments to control invasive species that threaten Dehesa beargrass populations in San Diego County (e.g., Brachypodium removal project). |
In progress |
|
DEV-2 |
Submit project metadata, monitoring data, reports and management recommendations to MSP web portal. |
In progress |
|
Criteria |
Deadline year |
BMPs for Dehesa Beargrass Completed by 2018 |
2021 |
Regional
NFO
2017
SO
MON-RES-SPEC NOLINT-9
Management units: 3
In 2017, begin field research into soils and habitat relationships and conduct habitat suitability and climate change modeling for Dehesa nolina and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
Criteria |
Deadline year |
Refined Models and Prioritized Future Survey Locations for Dehesa nolina by 2018 |
2021 |
oak woodland
Goal: Maintain, enhance and restore oak woodlands on Conserved Lands in the MSPA that support or have the potential to support VF species (i.e., Engelmann Oak, California newt) and coast live oak woodlands that incidentally benefit a diverse array of other MSP species (e.g., Harbison's dun skipper, California newt, pallid bat, mountain lion) so that the vegetation communities have high ecological integrity, and these species are resilient to invasive pests and disease pathogens, environmental stochasticity, threats and catastrophic disturbances, such as very large wildfires and intense and prolonged drought, and will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2018
MON-DEV-MAP OAKWOO-1
Management units: 2, 3, 4, 5, 6, 8, 9, 10, 11
Starting in 2017, map tree mortality in oak woodlands across the MSPA using high resolution aerial imagery, LIDAR and other remote sensing data and incorporate existing datasets, where available, to determine the current status of oak woodlands in the MSPA that are affected by drought, wildfire and invasive pests and fungal pathogens.
Criteria |
Deadline year |
Oak Woodland Tree Mortality Map completed by 2018 |
2021 |
Southern mule deer Odocoileus hemionus fuliginatus
Goal: Enhance and expand areas occupied by southern mule deer in San Diego County within suitable natural vegetation surrounded by a limited number of high use roads, and increase connectivity (and reduce potential road mortality) between occupied and suitable habitat areas to allow expansion and movement of southern mule deer occurrences and to ensure persistence in the MSPA over the long-term (>100 years).
regional
NFO
2017, 2018
SS
MGT-PRP-LINKPL ODOHEM-2
Management units: 3, 4, 5, 6, 7, 8, 9
In 2017 and 2018 and in conjunction with other linkage assessments and implementation plans, as feasible (e.g., mountain lion), integrate wildlife infrastructure recommendations to enhance deer movement based on results of deer genetic studies.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Incorporate considerations for mule deer when identifying locations and wildlife infrastructure improvements for mountain lions and other species in linkage implementation plans |
Available for implementation |
|
Criteria |
Deadline year |
Measures to improve mule deer connectivity identified in wildlife infrastructure improvement plans |
2021 |
Gander's ragwort Packera ganderi
Goal: Maintain or enhance existing Gander's ragwort occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG PACGAN-2
Management units: 3, 4
Beginning in 2017, conduct routine management actions identified through the IMG monitoring in 2016 and subsequent years at Gander's ragwort occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through enforcement and controlling invasive non-native plant species to less than 20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management datasets to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Blainville's horned lizard Phrynosoma blainvillii
Goal: Maintain, enhance and restore coastal sage scrub on Conserved Lands in the MSPA that supports or has the potential to support VF species (i.e., cliff spurge, Palmer's goldenbush, San Diego barrel cactus, snake cholla, Blaineville's horned lizard, California gnatcatcher, San Diego black-tailed jackrabbit) and to incidentally benefit a diverse array of other species (e.g., San Diego thornmint, willowy monardella, Hermes copper, Quino checkerspot, coastal cactus wren) so that the vegetation community has high ecological integrity, and these species are resilient to environmental stochasticity, catastrophic disturbances and threats, such as very large wildfires, invasive plants and prolonged drought, and will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2018
VF
MON-RES-GEN PHABLA-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017 continue a next-generation DNA sequencing study to characterize the phylogeographic and population genetic structure Blainville's horne lizard in southern California, including Conserved Lands throughout the MSPA. This species is a target for regional-scale connectivity within and between core areas of the MSPA and will provide information important to identify areas that may require management to improve connectivity for small vertebrates.
Action |
Statement |
Action status |
Projects |
RES-1 |
Submit project metadata, genetic datasets, analyses and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Study completed and report submitted by 2018 |
2021 |
Townsend's big-eared bat Plecotus townsendii pallescens
Goal: Protect Townsend's big-eared bat diurnal, nocturnal, and maternity roosts from destruction and human disturbance and enhance foraging habitat within commuting distance of nocturnal and maternity roosts to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long-term (>100 years).
local
NFO
2017, 2018
SO
MON-RES-SPEC PLETOW-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017-2018, finalize the results of research begun in 2015 on Townsend's big-eared bat to identify nocturnal, diurnal, and maternity roosts, foraging areas, and water sources associated with roosts in order to identify seasonal and annual changes in use and important foraging areas and monitor reproductive status. Collect habitat covariates associated with roosting and foraging habitat and assess threats to bats at all preserves where they occur and develop management recommendations.
Action |
Statement |
Action status |
Projects |
RES-1 |
Submit project metadata, survey data, and report with management recommendations to the MSP web portal. |
In progress |
|
Criteria |
Deadline year |
|
|
Townsend's Big-Eared Bat Surveys and Reports Completed in 2018. |
2018 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG PLETOW-2
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, annually inspect the vicinity of Townsend's big-eared bat roosts on an annual basis (see Table of Occurrences), taking care not to disturb bats, and use a regional monitoring protocol to collect covariate data on human activities and other threats to determine management needs.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol surveys to quantify signs of human activity near occupied or potential roosts and to identify other potential threats. Care should be taken to avoid disturbing roosting bats. |
In progress |
|
IMP-2 |
Based upon threat evaluation, determine if routine management or more intensive management is warranted. |
Unknown |
|
IMP-3 |
Submit monitoring data and management recommendations to the MSP web portal. |
Unknown |
|
Criteria |
Deadline year |
Annual monitoring of Townsend's big-eared bat completed |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG PLETOW-3
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement. |
Available for implementation |
|
IMP-2 |
Submit project metadata and management data to MSP web portal |
Unknown |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Regional Preserve System Monitoring
Goal: Maintain, enhance and restore native ecosystems in a system of Conserved Lands across the MSPA to support vegetation communities with high ecological integrity, biodiversity, and natural ecological processes and that provide for self-sustaining MSP species populations resilient to environmental stochasticity, catastrophic disturbances and threats, and that will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2020
MON-RSUP-REGPS PRESYS-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
Beginning in 2017, conduct a meta-analysis and synthesis of data collected across the regional preserve system in the MSPA to develop metrics that characterize the ecological integrity of the overall preserves system and MSP species, vegetation communities and ecosystems. Data sources include GIS-based data layers and data collected at multiple scales from abiotic element, MSP species, vegetation and threats monitoring programs. Monitoring metrics will include clear, easy to understand metrics aimed at the public and policy makers that describe the status of the preserve system and can be tracked over time to document changes in ecological integrity as a result of changing disturbance and threat regimes and management actions. More complex and detailed biological metrics will also be derived to inform management strategies and track progress in managing species, vegetation communities and ecosystem processes. In 2017, the focus will be on developing a report and monitoring metrics from analyses of GIS-based data sources and then every 3 years thereafter, the meta-analyses and syntheses will include GIS-based and field-based datasets.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Submit project metadata, monitoring datasets, analyses, synthetic results and metrics, and report to the MSP Web Portal. |
In progress |
|
Criteria |
Deadline year |
Regional Preserve System Synthesis and Metrics completed in 2017 and 2020 |
2021 |
Mountain lion Puma concolor
Goal: Enhance and expand areas occupied by mountain lion in San Diego County in large interconnected blocks (>1,000 acres) of suitable natural vegetation surrounded by a limited number of high use roads, and increase connectivity (and reduce potential road mortality) between occupied and suitable habitat areas to allow expansion and movement of mountain lion occurrences within San Diego County and adjacent counties to increase effective population size to sustainable levels and work to reduce depredation on livestock to ensure persistence in the MSPA over the long-term (>100 years).
regional
NFO
2017
SL
MON-RES-SPEC PUMCON-1
Management units: 3, 4, 5, 8, 9, 10
In 2017, finalize efforts begun in 2016, using available regional mountain lion movement data, to develop quantitative models of mountain lion movement in the MSPA to validate likely movement patterns and to assist with linkage and land protection prioritization.
Criteria |
Deadline year |
Mountain lion connectivity model completed by 2017 |
2021 |
regional
NFO
2017, 2018
SL
MON-EVAL-LINK PUMCON-2
Management units: 5, 8, 9, 10
In 2017-2018, guided by information from telemetry studies and mountain lion movement modelling, prioritize potential mountain lion crossing locations for SR 78, SR 76, SR 79, I-15, and other priority roads. For each priority crossing location, conduct detailed linkage assessments to identify existing impediments to successful crossings and recommendations for wildlife crossing infrastructure improvement (culvert maintenance, undercrossing construction, fencing, etc.) and habitat/land protection needs.
Criteria |
Deadline year |
By 2019, linkage evaluations completed for mountain lion crossing locations for SR 76, SR 79, SR 78 and other priority roads |
2021 |
regional
NFO
2017, 2018, 2019
SL
MGT-PRP-LINKPL PUMCON-3
Management units: 5, 8, 9, 10
Beginning in 2017 and based on linkage assessment results, prepare Linkage Implementation Plan that outlines specific locations and recommendations for improving mountain lion and deer connectivity across SR 78, 76, 79 and other priority roads in MU s 5, 8, 9, and 10.
Action |
Statement |
Action status |
Projects |
PRP-1 |
Linkage Implementation Plans will identify the locations and design criteria for needed wildlife crossing infrastructure for priority roads and highways in MUs 5, 8, 9, and 10, including locations for road under/overcrossings and barrier fences to funnel lions and other wildlife to crossing locations for priority highways and roads |
waiting for precedent action |
|
PRP-2 |
Submit data and reports to MSP web portal. |
waiting for precedent action |
|
Criteria |
Deadline year |
Mountain lion and deer linkage implementation plan completed for MU 5, 8, 9 and 10 by 2019 |
2021 |
regional
NFO
2017, 2018, 2019
SL
MGT-DEV-BMP PUMCON-6
Management units: 5, 8, 9, 10
Beginning in 2017, support efforts by UC Davis Wildlife Health Center and others to test the effectiveness of various methods to deter mountain lions and other native predators from preying on livestock/domestic animals in locations where depredation permits have been issued in recent past, with the goal of reducing depredation permits by 50%.
Criteria |
Deadline year |
Best Practices for Reducing native predator take of domestic livestock developed and disseminated to landowners. |
2021 |
Light-footed Ridgway's rail Rallus longirostris levipes
Goal: Protect, enhance, and restore light-footed Ridgway's rail occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-CAPR RALOBS-1
Management units: 1, 7
From 2017 to 2021, continue the existing captive rearing and release efforts for Rideway's rail implememted by the wildlife agencies.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Implement management actions specified by the wildlife agencies for recovery of light-footed Ridgway's rail. |
in progress |
|
Criteria |
Deadline year |
Wildlife Agency specified management actions completed |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG RALOBS-2
Management units: 1, 7
From 2017 to 2021, annually inspect the existing occurrences of Ridgway's rail to identify necessary management actions in order to support the expansion of the occurrence to self sustaining levels.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol survey locations and habitat, assess status, and quantify potential threats. |
available for implementation |
|
IMP-2 |
Based upon threat evaluation, determine if routine management or more intensive management is warranted. |
available for implementation |
|
IMP-3 |
Submit monitoring data and management recommendations to MSP web portal |
available for implementation |
|
Criteria |
Deadline year |
Surveys Completed Annually with management recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG RALOBS-3
Management units: 1, 7
From 2017-2021, perform routine management activities such as protecting occurrences from disturbance through fencing, signage, and enforcement.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform management activities protecting occurrences from disturbance through fencing, signage, and enforcement. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to MSP web portal. |
available for implementation |
|
Criteria |
Deadline year |
Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
riparian forest & scrub
Goal: Maintain, enhance and restore riparian forest and scrub on Conserved Lands in the MSPA that supports or has the potential to support VF species (i.e., California newt, yellow-breasted chat) and to incidentally benefit a diverse array of other species (e.g., arroyo toad, southwestern pond turtle, least Bell's vireo, southwestern willow flycatcher, Townsend's big-eared bat) so that the vegetation community has high ecological integrity, and these species are resilient to invasive pests and disease pathogens, environmental stochasticity, threats and catastrophic disturbances, such as very large wildfires and intense and prolonged drought, and will be likely to persist over the long term (>100 years).
Regional
NFO
2017, 2018
MON-DEV-MAP RIPFOR-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
In 2017-2018, map tree mortality in riparian forests across the MSPA using high resolution aerial imagery, LIDAR and other remote sensing data and incorporate existing datasets, where available, to determine the current status of riparian forest and scrub in the MSPA that are affected by drought, wildfire and invasive pests and fungal pathogens.
Criteria |
Deadline year |
Riparian Forest and Scrub Mortality Map completed by 2018 |
2021 |
Small-leaved rose Rosa minutifolia
Goal: Maintain or enhance existing small-leaved rose occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and improve chances of persistence over the long term (>100 years) in chaparral and coastal sage scrub vegetation communities.
local
NFO
2017, 2018, 2019, 2020, 2021
SS
MGT-IMP-IMG ROSMIN-2
Management units: 3
Beginning in 2017, conduct routine management actions as identified through the IMG monitoring conducted in 2016 and 2021 at the small-leaved rose occurrences on Conserved Lands (see occurrence table). Depending on the type and level of threat, management should be conducted as needed, not necessarily every year, and using BMPs with precautions to do no harm.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species to less than 20% absolute cover. |
on hold |
|
IMP-1 |
Perform as needed routine management activities, such as protecting occurrences from disturbance through fencing and enforcement and controlling invasive non-native plant species to less than 20% absolute cover. |
available for implementation |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
on hold |
|
IMP-2 |
Submit project metadata and management data to the MSP Web Portal. |
available for implementation |
|
Criteria |
Deadline year |
Routine Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
California least tern Sternula antillarum browni
Goal: Protect, enhance, and restore California least tern occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-PRED STEANT-1
Management units: 1, 7
From 2017-2021, annually conduct predator control at breeding least tern colonies before and during the nesting season to improve fledgling success. Include tracking of predator-tern interactions to provide real-time data to improve control efforts during the breeding season.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct predator control prior to breeding and during the breeding season to control the various taxa (e.g. mammals, reptiles, birds, inverebrates) that prey on adult, nestling, and fledgling least terns. |
in progress |
|
IMP-2 |
Submit data and reports to MSP web portal. |
in progress |
|
Criteria |
Deadline year |
Predator Control Implemented and Reports Completed Annually |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-PRED STEANT-2
Management units: 1, 7
From 2017-2021, monitor the effectiveness of predator control at least tern colonies and monitor overall tern predator status and trend to identify larger issues potentially affecting other MSP species and to improve management effectiveness.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Submit monitoring data and reports to MSP web portal |
available for implementation |
|
Criteria |
Deadline year |
Monitoring completed and data and report submitted within 1 year of management actions being completed. |
2021 |
regional
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-SURV-SPEC STEANT-3
Management units: 1, 7
From 2017 to 2021, continue the existing survey efforts for California least tern implemented by the wildlife agencies and military.
Action |
Statement |
Action status |
Projects |
SURV-1 |
Submit monitoring data and management recommendations to MSP web portal |
In progress |
|
Criteria |
Deadline year |
Least Tern Surveys and Reports Completed Annually |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MON-IMP-IMG STEANT-4
Management units: 1, 7
From 2017 to 2021, annually inspect the existing nest sites for California least tern, taking precautions to avoid disturbance during the nesting season, to identify necessary management actions in order to support the expansion of the occurrence to self sustaining levels.
Action |
Statement |
Action status |
Projects |
IMP-1 |
Conduct regional IMG monitoring protocol survey locations and habitat, assess status, and quantify potential threats. |
Available for implementation |
|
IMP-2 |
Based upon threat evaluation, determine if routine management or more intensive management is warranted. |
Available for implementation |
|
IMP-3 |
Submit monitoring data and management recommendations to MSP web portal |
Available for implementation |
|
Criteria |
Deadline year |
Surveys Completed Annually with management recommendations |
2021 |
local
NFO
2017, 2018, 2019, 2020, 2021
SO
MGT-IMP-IMG STEANT-5
Management units: 1, 7
From 2017-2021, perform routine management activities such as invasives removal, sand replenishment, nest prep, and protecting occurrences from disturbance through fencing, signage, and enforcement.
Criteria |
Deadline year |
Management Completed as Needed Based Upon Monitoring Recommendations |
2021 |
Parry's tetracoccus Tetracoccus dioicus
Goal: Maintain or enhance existing Parry's tetracoccus occurrences to ensure multiple conserved occurrences with self sustaining populations to increase resilience to environmental and demographic stochasticity, maintain genetic diversity, and ensure persistence over the long term (>100 years) in chaparral and coastal sage scrub vegetation communities.
Regional
NFO
2017
SS
MON-RES-SPEC TETDIO-3
Management units: 3, 8
In 2017, begin field research into soils and habitat relationships and conduct habitat suitability and climate change modeling for Parry's tetracoccus and other edaphic endemic plants to better understand habitat requirements and to identify and prioritize geographic areas important for connectivity, restoration, and range shifts due to climate change and other threats.
Criteria |
Deadline year |
Refined Models and Prioritized Future Survey Locations for Parry's Tetracoccus by 2018 |
2021 |
Urban development
Goal: The goal for managing the effects of urban development in the preserves is to better understand and reduce the impacts on Conserved Lands where urban development is reducing the population levels and/or viability of MSP species populations.
regional and/or local
NFO
2017, 2018, 2019, 2020, 2021
MGT-RSUP-TRASH URBDEV-1
Management units: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
From 2017-2021, support land managers in preventing or cleaning up dump sites & trash collection.
Action |
Statement |
Action status |
Projects |
RSUP-1 |
Provide support to land managers for enforcement, signage or fencing, public outreach, or cleanup projects.
|
Available for implementation |
|
Criteria |
Deadline year |
Project reports submitted within 1 Year of Management Efforts |
2021 |
Least Bell's vireo Vireo bellii pusillus
Goal: Protect, enhance, and restore least Bell's vireo occupied and historically occupied habitat to create resilient, self-sustaining populations that provide for persistence over the long-term (>100 years).
regional
NFO
2017, 2018
SO
MON-SURV-SPEC VIRBEL-1
Management units: 1, 6, 8
In 2017-2019, conduct surveys for least Bell's vireo and habitat assessment to compare population status and recovery in the MSPA before, during, and after SHB/Fusarium complex in infested habitat over time at the Tijuana River Valley and other sites, if funding available, such as Camp Pendelton and San Luis Rey River. Prepare site-specific management recommendations based on survey results and habitat assessments.
Action |
Statement |
Action status |
Projects |
SURV-1 |
Submit monitoring data and management recommendations to MSP web portal |
In progress |
|
Criteria |
Deadline year |
Least Bell's Vireo Surveys and Reports Completed by 2020 |
2021 |